轮机英语unit25Anchorwindlassa.ppt
《轮机英语unit25Anchorwindlassa.ppt》由会员分享,可在线阅读,更多相关《轮机英语unit25Anchorwindlassa.ppt(55页珍藏版)》请在三一办公上搜索。
1、Lesson 25 Anchor windlass and Mooring winch 锚机和绞缆机,Anchor handling equipment,The windlass(锚机)is the usual anchor handling device where one machine may be used to handle both anchor.,A more recent development,particularly on large vessels,is the split windlass where one machine is used for each ancho
2、r.,One unit of a split windlass(分离式锚机)is shown in Fig.25-1.,The rotating units consist of a cable lifter(锚链轮)with shaped smug(凸起)to grip the anchor cable(锚链),a mooring drum(绞缆筒)for paying out(放松)or letting go(放出)of mooring wires and a warp end for warping duties.,Each of these units maybe separately
3、 engaged(啮合)or disengaged by means or a dog clutch(牙嵌离合器),although the warp end is often driven in association with the mooring drum.,A spur gear(正齿轮)assembly transmits the motor drive to shaft where the various dog clutches enable the power take-off.,Separate band brakes(独立式刹车)are fitted hold the c
4、able lifter and the mooring drum(绞缆筒)when the power is switched off.,The cable lifter unit(锚链轮),show in Fig.25-1,is mounted so as to raise and lower the cable from the spurling pipe(锚链管),which is at the top and center of the chain or cable locker(锚链舱).,Details of the snugs(卡块)used to grip the cable
5、and band brake(带式刹车)can be seen.,Anchor capstans(起锚绞盘)are used in some installations where the cable lifter rotates about a vertical axis.,Only the cable lifter unit is located on deck,the driving machinery(驱动机械)being on the deck below.,A warping end or barrel may be driven by the same unit and is p
6、ositioned near the cable lifter.,The efficient working of the anchor windlass is essential to the safety of the ship.An anchor windlass can expect to fulfill(满足)the following:,1.The windlass cable lifter brakes must be able to control the running anchor and cable when the cable lifter is disconnecte
7、d from the gear during“letting go”(放锚).,Average cable speeds vary between 5-7 m/sec during this operation,2.The windlass must be able heave a certain weight of cable at a specified speed(额定转速).,This“full load”duty of the windlass varies but is commonly between 4 and 6 times the weight of one anchor,
8、the speed of haul being at least 9 m/min up to 15 m/min.,3.The braking effort(刹车效果)obtained at the cable lifter must be at least equal to 40 percent of the breaking strength of the cable.,Most anchor handing equipments incorporate(包含)warp ends for mooring purposes(系泊)and line speeds of up to 0.75 to
9、 1.00 m/sec are required.,The most conventional types of equipment in use are as follows.,Windlasses,This equipment is self-contained(独立的)and normally one prime mover drives two cablelifters and two warp ends(绞缆端),the latter may not be declutchable(离合装置)and,if so,rotate when the cablelifters are eng
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 轮机 英语 unit25Anchorwindlassa

链接地址:https://www.31ppt.com/p-6434107.html