1、管理学院 School of Management,佟瑞 Edward Tong,MPM,MBA,2023/10/17,1,Edward TongCopyright reserved Jinan University,133,Where We Are Now,134,Structure of a Project Monitoring Information System,Creating a project monitoring system involves determining:What data to collectHow,when,and who will collect the d
2、ataHow to analyze the dataHow to report current progress to management,135,Project Monitoring Information System,Information System StructureWhat data are collected?Current status of project(schedule and cost)Remaining cost to compete projectDate that project will be completePotential problems to be
3、 addressed nowOut-of-control activities requiring interventionCost and/or schedule overruns and the reasons for themForecast of overruns at time of project completion,136,Project Monitoring System(contd),Information System Structure(contd)Collecting data and analysisWho will collect project data?How
4、 will data be collected?When will the data be collected?Who will compile and analyze the data?Reports and reportingWho will receive the reports?How will the reports be transmitted?When will the reports be distributed?,137,Project Progress Report Format,Progress since last reportCurrent status of pro
5、jectScheduleCostScopeCumulative trendsProblems and issues since last reportActions and resolution of earlier problemsNew variances and problems identifiedCorrective action planned,138,The Project Control Process,ControlThe process of comparing actual performance against plan to identify deviations,e
6、valuate courses of action,and take appropriate corrective action.Project Control StepsSetting a baseline plan.Measuring progress and performance.Comparing plan against actual.Taking action.ToolsTracking and baseline Gantt chartsControl charts,139,Baseline and Tracking Gantt Charts,FIGURE 13.1,1310,P
7、roject Schedule Control Chart,FIGURE 13.2,1311,Disparity Among Monitoring Systems,Time-Phase Baseline PlanCorrects the failure of most monitoring systems to connect a projects actual performance to its schedule and forecast budget.Systems that measure only cost variances do not identify resource and
8、 project cost problems associated with falling behind or progressing ahead of schedule.Earned Value Cost/Schedule SystemAn integrated project management system based on the earned value concept that uses a time-phased budget baseline to compare actual and planned schedule and costs.,1312,Glossary of
9、 Terms,TABLE 13.1,1313,Developing an Integrated Cost/Schedule System,Define the work using a WBS.ScopeWork packagesDeliverablesOrganization unitsResourcesBudgetsDevelop work and resource schedules.Schedule resources to activitiesTime-phase work packages into a network,Develop a time-phased budget us
10、ing work packages included in an activity.Accumulate budgets(PV).At the work package level,collect the actual costs for the work performed(AC).Multiply percent complete times original budget(EV).Compute the schedule variance(EV-PV)and the cost variance(EV-AC).,1314,Project Management Information Sys
11、tem Overview,FIGURE 13.3,1315,Development of Project Baselines,Purposes of a Baseline(PV)An anchor point for measuring performanceA planned cost and expected schedule against which actual cost and schedule are measured.A basis for cash flows and awarding progress payments.A summation of time-phased
12、budgets(cost accounts as summed work packages)along a project timeline.What Costs Are Included in Baselines?Labor,equipment,materials,project direct overhead costs(DOC),1316,Development of Project Baselines(contd),Rules for Placing Costs in BaselinesCosts are placed exactly as they are expected to b
13、e“earned”in order to track them to their point of origin.Percent Complete RuleCosts are periodically assigned to a baseline as units of work are completed over the duration of a work package.,1317,Methods of Variance Analysis,Comparing Earned ValueWith the expected schedule value.With the actual cos
14、ts.Assessing Status of a ProjectRequired data elementsData Budgeted cost of the work scheduled(PV)Budgeted cost of the work completed(EV)Actual cost of the work completed(AC)Calculate schedule and cost variancesA positive variance indicates a desirable condition,while a negative variance suggests pr
15、oblems or changes that have taken place.,1318,Methods of Variance Analysis,Cost Variance(CV)Indicates if the work accomplished using labor and materials costs more or less than was planned at any point in the project.Schedule Variance(SV)Presents an overall assessment in dollar terms of the progress
16、 of all work packages in the project scheduled to date.,1319,Cost/Schedule Graph,FIGURE 13.4,1320,Earned-Value Review Exercise,FIGURE 13.5,1321,Developing A Status Report:A Hypothetical Example,AssumptionsEach cost account has only one work package,and each cost account will be represented as an act
17、ivity on the network.The project network early start times will serve as the basis for assigning the baseline values.From the moment work an activity begins,some actual costs will be incurred each period until the activity is completed.,1322,Work Breakdown Structure with Cost Accounts,FIGURE 13.6,13
18、23,Digital Camera Prototype Project Baseline Gantt Chart,FIGURE 13.7,1324,Digital Camera Prototype Project Baseline Budget($000),FIGURE 13.8,1325,Digital Camera Prototype Status Reports:Periods 13,TABLE 13.2,1326,Digital Camera Prototype Status Reports:Periods 4&5,TABLE 13.2(contd),1327,Digital Came
19、ra Prototype Status Reports:Periods 6&7,TABLE 13.2(contd),1328,Digital Camera Prototype Summary Graph($000),FIGURE 13.9,1329,Digital Camera Project-Tracking Gantt Chart Showing StatusThrough Period 7,FIGURE 13.10,1330,Project Rollup End Period 7($000),FIGURE 13.11,1331,Indexes to Monitor Progress,Pe
20、rformance IndexesCost Performance Index(CPI)Measures the cost efficiency of work accomplished to date.CPI=EV/ACScheduling Performance Index(SPI)Measures scheduling efficiencySPI=EV/PVPercent Complete IndexesIndicates how much of the work accomplished represents of the total budgeted(BAC)and actual(A
21、C)dollars to date.PCIB=EV/BAC PCIC=AC/EAC,1332,Interpretation of Indexes,TABLE 13.3,1333,Indexes Periods 17,FIGURE 13.12,1334,Additional Earned Value Rules,Rules applied to short-duration activities and/or small-cost activities0/100 percent ruleAssumes 100%of budget credit is earned at once and only
22、 when the work is completed.50/50 ruleAllows for 50%of the value of the work package budget to be earned when it is started and 50%to be earned when the package is completed.Percent complete with weighted monitoring gatesUses subjective estimated percent complete in combination with hard,tangible mo
23、nitoring points.,1335,Forecasting Final Project Cost,Methods used to revise estimates of future project costs:EACreAllows experts in the field to change original baseline durations and costs because new information tells them the original estimates are not accurate.EACfUses actual costs-to-date plus
24、 an efficiency index to project final costs in large projects where the original budget is unreliable.,1336,Forecasting Model:EACf,The equation for this forecasting model:,1337,Monthly Status Report,EXHIBIT 13.1,1338,Other Control Issues,Issues In Maintaining Control Of Projects,Scope Creep,Baseline
25、 Changes,Data Acquisition Costs and Problems,1339,Scope Changes to a Baseline,FIGURE 13.13,1340,Conference Center WiFi ProjectCommunication Plan,FIGURE 13.14,1341,Key Terms,Baseline budgetControl chartCost performance index(CPI)Cost variance(CV)Earned value(EV)Estimated Cost at CompletionForecasted(
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 暨南大学项目管理chapter 13 progress and performance measurement evaluation 暨南大学 项目 管理 chapter
链接地址:https://www.31ppt.com/p-6324425.html