Drilling Engineering(钻井工程英文课件).ppt
《Drilling Engineering(钻井工程英文课件).ppt》由会员分享,可在线阅读,更多相关《Drilling Engineering(钻井工程英文课件).ppt(164页珍藏版)》请在三一办公上搜索。
1、1,Drilling Engineering,Contents OverviewRig componentsDrillstringDrillbitsFormation pressuresWell control,2,CasingCementDrilling fluidsHydraulicsDirectional drillingDirectional SurveyingMeasurement while drillingSubsea,3,Chap.1 Overview,IntroductionDrilling PersonnelRotary drilling equipmentThe dril
2、ling processOffshore drilling Drilling economics,4,Chap.1 Overview,1.1 Exploration and production licencesIn UK,the secretary of State for Energy is empowered(授权),on behalf of the Government,to invite companies to apply for exploration and production licences on the United Kingdom Continental Shelf.
3、Exploration licences may be awarded at any time.(mainly allow to acquire seismic data,not to drill any deeper than 350 meters.),1.Introduction,5,Production licences are awarded at specific discrete intervals known as licencing Rounds.1.2 Exploration,Development and AbandonmentBefore drilling an expl
4、oration well,company have to obtain a production licence.The licence allow the company to drill exploration wells in the area of interest.,Chap.1 Overview,6,The objectives of exploration well,To determine the presence of hydrocarbonsTo provide geological data(core,logs)for evaluation.To flow test th
5、e well to determine its production potential,and obtain fluid sample.,Chap.1 Overview,7,The phases in the life of oil field,Exploration AppraisalDevelopmentMaintenanceAbandonment,Chap.1 Overview,Role of Drilling,Chap.1 Overview,9,2.Drilling personnel,Drilling a well requires many different skills an
6、d involves many companies.Operator:The oil company who manages the drilling and/or production operations.In joint ventures one company acts as operator on behalf of the other partners.The oil company will employ a drilling contractor to drill the well.,Chap.1 Overview,10,Contracting strategies,Day-r
7、ate contract(日费制)The most common type of drilling contract is a day-rate contract.The operator prepares a detailed well design and program of work for the drilling operationDrilling contractor simply provides the drilling rig and personnel to drill the well.The contractor is paid a fixed sum of mone
8、y for every day that he spends drilling the well.All consumable items(e.g.drilling bits,cement),transport and support services are provided by the operator.,Chap.1 Overview,11,Turnkey contract(大包)The drilling contractor designs the well,contracts the transport and support services and purchases all
9、of the consumables,and charges the oil company a fixed sum of money for whole operation.The role of operator is to specify the drilling targets,the evaluation procedures and to establish the quality controls on the final well.,Chap.1 Overview,12,The operator will generally have a representative on t
10、he rig(sometimes called the“company man”)to ensure drilling operations go ahead as planned,make decisions affecting progress of the well,and organise supplies of equipment.He will be in daily contact with his drilling superintendent(主管)who will be based in the head office of the operator.There may a
11、lso be an oil company drilling engineer and/or a geologist on the rig.,Chap.1 Overview,13,The drilling contractor will employ a tool-pusher(钻井主管 also called superintendent)to be in overall charge of the rig.He is responsible for all rig floor activities and liaises(保持联系)with the company man to ensur
12、e progress is satisfactory.The manual activities associated with drilling the well are conducted by the drilling crew.Since drilling continues 24 hours a day,there are usually 2 drilling crews.Each crew works under the direction of the driller(司钻).,Drilling activity,Chap.1 Overview,14,The crew will
13、generally consist of a derrickman(井架工 who also tends the pumps while drilling),3 roughnecks(钻台工 working on rig floor),plus a mechanic(机修工),an electrician(电工),a crane operator and roustabouts(杂工 general labourers)Service company personnel are transported to the rig and when required.Sometimes they ar
14、e on the rig for the entire well(e.g.mud engineer)or only for a few days during particular operations(e.g.directional drilling engineer).,Chap.1 Overview,15,Personnel in Drilling a Well,16,3.Drilling proposal and drilling program,The proposal for drilling the well is prepared by the geologists and r
15、eservoir engineers in the operating company and provides the information upon which the well will be designed and the drilling program will be prepared.Drilling proposal:Objective of the well Depth(m/ft,subsea),and location(longitude and Latitude)of target Geological cross section Pore pressure prof
16、ile prediction,17,Drilling rig to be used for the wellProposed location for the drilling rigHoles sizes and depthsCasing sizes and depthsDrilling fluid specificationDirectional drilling informationWell control equipment and proceduresBits and hydraulics program,Drilling program:,18,4.Rotary Drilling
17、Equipment,19,5.Drilling Process,Fig.4 Typical well in North Sea,20,Installing the 30 in ConductorThe first stage is to drive a large diameter pipe to a depth of approximately 100 ft below ground level using a truck mounted pile-driver.This pipe,usually called casing/conductor,is installed to prevent
18、 the unconsalidated surface formations from collapsing whist drilling deeper.Once this conductor is in place the full sized rig is brought onto the site and set up over the conductor,and preparations are made for the next stage of the operation.,Overview of the process of drilling,21,Drilling and ca
19、sing the 26 holeA 26”diameter bit is generally used for the first hole section(the I.D.of conductor is approximately 28”).This section may be approximately 2000.Whist drilling the 26 hole,drilling fluid is circulated down the drllpipe,across the face of the drillbit,and up the annulus between the dr
20、illpipe and the borehole,carrying the drilled cuttings from the face of the bit to surface.,22,At surface the cuttings are removed from the mud(to collect more cuttings).When the drillbit reaches approximately 2000 the drillstring is pulled out of the hole and another string of pipe(surface casing)i
21、s run into the hole.This casing,which generally 20”O.D.,is delivered to the rig in 40ft lengths.The casing is lowered into the hole,joint by joint,until it reaches the bottom of the hole.Cement slurry is then pumped into the annular space between the casing and the borehole.,23,Drilling and Casing t
22、he 17”HoleOnce the cement has set hard,a large spool called a wellhead hausing(套管头)is attached to the top of the 20”casing.This wellhead housing is used to support the weight of subsequent casing strings and the blowout prevention stack.BOP generally fitted to the wellhead before the 17”hole section
23、 is started.,24,When the BOPs have been installed and pressure tested,a 17”hole is drilled down to 6000ft.Once this depth has been reached the troublesome formations in the 17”hole section,a casing string is used to isolate these formations.When the cement has set hard,the BOP stack is removed and a
24、 wellhead spool is mounted on top of the wellhead housing.,25,Drilling and Casing 12”HoleWhen the BOP has been re-installed and pressure tested,a 12”hole is drilled through the oil bearing reservoir.Whilst drilling through this formation oil will be visible on the cuttings being brought to surface b
25、y the drilling fluid.If gas is present in the formation it will also be brought to surface by the drilling fluid and deteced by gas detectors placed above the mud flowline connected to top of the BOP stack.,26,Petrophysical logsThe drill string is pulled out and a logging tools is pulled in to measu
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- Drilling Engineering钻井工程英文课件 Engineering 钻井 工程 英文 课件

链接地址:https://www.31ppt.com/p-6223072.html