IE工程师英文简历模板.doc
《IE工程师英文简历模板.doc》由会员分享,可在线阅读,更多相关《IE工程师英文简历模板.doc(8页珍藏版)》请在三一办公上搜索。
1、IE工程师英文简历模板 Name: Mr. R Gender: MaleWedlock: Single Nation: HanResidence: Guangdong-Qingyuan Age: 28Location: Guangdong-Dongguan Height: 173cmTarget Locations: GuangdongTarget Positions: Industry/Factories-Industrial EngineerIndustry/Factories-Production Management ClerkIndustry/Factories-Technic En
2、gineerTarget Jobs: Industrial Engineer、 Lean EngineerEducation2005-09 20XX-07 GuangDong University of Technology Industral Engineering Bachelor DegreeTraining20XX-12 20XX-12 Guopei Certificate Internal Quality Auditor Training Qualification【company name】 (20XX-07 Present)Company Type: Private Enterp
3、rise Company Category: Electrical,Micro-electronicsJob Title: Industrial Engineer Positions: Industrial EngineerJob Description: 1.NPI: process planning, fixture and equipment planning, prepare process checklist2.Standard time and capacity evaluation, line balance and prepare SOP for new products3.M
4、aintain the usage of the consumptive material, standard time and capacity4.Perform line balance and improve process to rise capacity5.Design and improve the tools and fixture in the work site6.Monitor the efficiency of the production line, analyze these reasons manpower, machine, material , environm
5、ent, method, push the relative dept to solve issues7.Kaizen project planning and push: Auto-machine introduce, production way optimize, manpower and material saving, etcCareer Highlight:1.Auto-welding machine introduce: welding process operator saving(16 operators-12 operators=4 operators), line bal
6、ance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan RMB for each PCBA.2.Auto-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, after introduce the
7、new equipment it takes only 5 operator to seal the master carton3.Rear cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partition board4.Decora
8、tive plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan RMB) and cut down unpack operation time( saving 12 seconds)5.Cooperate with RD to change PCBA process from dispensing process to solder paste process, in order
9、to cut down welding failure rate after wave-soldering. In this case charge of PCBA fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)6.According to the small order quantity of the product, study the less humaniz
10、ing process for small products to reduce the change over loss time(38 operators*30minute-20 operator*40minutes=340minutes) and improve 8% of the motion effective rateReason for Leaving: Not very good economic benifit of the company,little chance to promote both in position and welfare【company name】
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IE 工程师 英文 简历模板
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-570288.html