《虹吸系统介绍》PPT课件.ppt
《《虹吸系统介绍》PPT课件.ppt》由会员分享,可在线阅读,更多相关《《虹吸系统介绍》PPT课件.ppt(27页珍藏版)》请在三一办公上搜索。
1、Geberit Pluvia吉博力虹吸式屋面雨水排放系统,GEBERITthe system supplier,吉博力系统供应商,Pluvia System,提示:首先强调完整的水管理系统的概念,而不是很快地将该页跳过。,高效,安全的屋面雨水排放系统(Efficiency and safe roof drainage system),空气(air),水(Water),传统重力流状态(Traditional gravity drainage),虹吸流状态Syphonic drainage,只有水(Only water),管径减小Decrease of pipe diameter,流量增加(Flo
2、w volume increase),满流排水更高效(More efficiency if the pipe is full of water),负压的抽吸作用,使流速更快(Bigger velocity under negative pressure),提示:为什么管径减小,流量反而增加?因为管道呈满流状态,且流速加快。,虹吸水力原理 Syphonic theory,折点,HT:提供虹吸式雨水的动力 Engine of the Pluvia system HT 10m,水头损失最多为1000mbar Max.possible pressure loss is 1000mbar,建筑物的总高度
3、是产生虹吸的原动力,根据不同管径,建筑的最小高度不能低于3-5米(The total height of building is the original dynamic to create syphonic.According to different pipe diameter,the Min.height of building should not lower than 3-5 m.,提示:强调虹吸的总能量来自建筑的高度。雨水斗下来1米的高度也是必须的,否则水将没有动能在水平管里流动。,形成虹吸的关键(Key point of syphonic drainage),形成虹吸的关键在于管
4、道内没有空气进入(The key point is no air should enter the pipe),气旋会将空气带入管道内(Air whirl will bring air into the pipe),形成虹吸的关键 Key point of syphonic,Pluvia Outlet最终解决(Final solution),反气旋强制虹吸挡板Anti-vortex plate,当斗前汇水深度达到一定的高度,就会产生虹吸,并且这一深度是固定的,可控的。A certain height of water depth will create syphonic.The height
5、is fixed and controllable.,提示:强调斗前水深稳定可控,因为我们的竞争对手都做不到。当达到工作暴雨强度时,我们的斗前水深是稳定不变的,说明流量相当稳定。而竞争对手的斗前水深是不稳定的,说明流量也不稳定,对系统的伤害是很大的。另外当暴雨强度超出工作范围时,我们的斗前水深会一下子上深,说明系统已饱和,不再能排更多的水。只能通过溢流口排水。但竞争对手的系统却还能排更多的水,说明管道中的流速在不断地增加,这样会使管道超出它的疲劳极限,从而大大降低系统的寿命。,虹吸形成的过程(The progress of syphonic formation),刚开始下雨,系统仍处于重力流状
6、态,水平管内水流速度较慢,水位逐渐上升。In the beginning of rain,the system is in gravity states,the velocity in horizontal pipe is very slow,water level is increasing gradually.,虹吸形成的过程 The progress of syphonic formation,随着屋面水位的不断上升,当达到计算斗前水深要求时,系统产生虹吸,排水量增大。当斗前水位回落至标准以下,系统又将回复到重力状态。因此在降雨初期,虹吸流与重力流总是交替产生。Along with th
7、e increase of water level,the system will create syphonic effect when the calculated water depth is reached,and drainage capacity will increase.While the system will go back to gravity states when the water level drop down below the calculation depth.Thus during the initial period of raining,syphoni
8、c flow and gravity flow always appear alternatively.,虹吸形成的过程 The progress of syphonic formed,随着降雨量的不断增加,管道内逐渐形成稳定的虹吸状态Along with the increase of rainfall,stable syphonic states are formed gradually.,最大负压点Max.negative pressure point,与传统的比较 Compare with conventional system,传统重力式Conventional gravity sy
9、stem,虹吸式Syphonic system,管径大,需1-3%的坡度Big pipe diameter and slope of 1-3%required,管径小,无需坡度,美观节省空间Small pipe diameter,no need of slope,save space and more design freedom.,更少的材料更少的地面开挖工作Less downpipes,less digging work.,材料多,安装复杂More downpipes,complicated ground work,虹吸在什么时候产生 When the syphonic create,在降
10、雨之初,虹吸流与重力流始终处于交替状态In the beginning of rain,syphonic flow and gravity flow always change by turn.,没有一种系统可以在整个降雨过程中始终达到虹吸状态No system can be syphonic states through the whole raining period,但是吉博力能更加容易达到并控制这种状态But Geberit can easily reach and control syphonic states of defined parameters.,吉博力虹吸系统发展史 Ge
11、berit Pluvia history,吉博力虹吸系统的组成 Geberit syphonic system buildup,雨水斗 OutletHDPE管道 HDPE piping System紧固系统 Fixation System计算软件 Calculation Software技术支持 Technical Support系统保证 System Guarantee,雨水斗Outlets,1-12 l/s斗前汇水深度为32mm Damming height is 32mm配合不同材质的安装片可安装于任何材质的屋面With different fixation material,can b
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 虹吸系统介绍 虹吸 系统 介绍 PPT 课件