q抛石挤淤施工技术方案.doc
《q抛石挤淤施工技术方案.doc》由会员分享,可在线阅读,更多相关《q抛石挤淤施工技术方案.doc(32页珍藏版)》请在三一办公上搜索。
1、Manipulator is now used as a industrial robots in use, the control objectives often appear often in industrial automation. Industrial automation technology has gradually matured, as mature a technology line has been rapid development in industrial automation as a separate subject. Manipulator applic
2、ation began to filter into welding, logistics, mechanical processing, and other industries. Especially at high or very low temperatures, full of poisonous gases, high radiation case, robot in similar circumstances showed great use also brings great convenience to the staff. Precisely because of this
3、 robot to get peoples attention began to be a high degree of development. Labor rates, working conditions, labor intensive aspects of promoting development. Both at home and abroad to develop the PLC (programmable logic controller) is in various special circumstances and under special conditions set
4、 for mechanical devices. Now turned on the development of the microelectronics automatic control technology and the rapid development of the trains, the success of PLC hardware software and simulation control win big and successful development, now continues to develop as a factory automation standa
5、rds. Because robots are good development of the technology makes a good optimization of productive capital, and robot shows this unique advantages, such as: has good compatibility, wide availability, hardware is complete, and programming that can be mastered in a short time, so in the context of ind
6、ustrial PLC applications became ubiquitous. Manipulator in many developed country agriculture and industry has been applied, such as the use of mechanical harvesting large areas of farmland, repeated operations on the high-speed line that uses a robotic arm, and so on. Today, the high level of autom
7、ation combined with restrictions on the manipulator development level is slightly lower than the international. The design is mainly arm welding machine by PLC Automation control. This of design let designers on in school by learn of has a must of consolidation, understand has some usually didnt opp
8、ortunities awareness in world range within some leading level of knowledge has has must awareness, hope designers can in yihou of design in the can success of using in this design in the proceeds of experience 1.2 manipulator in both at home and abroad of research profile automation mechanical arm r
9、esearch began Yu 20th century medium-term, after years with with computer and automation technology of development, Makes mechanical arm on the Grand stage of industrial automation and shine, gradually became an industrial evaluation standards, and its importance can be seen. Now original robotic ar
10、m spent most of mass production and use on the production line, which is programmed robotic arm. As the first generation of manipulator position control systems main features, although not back several generations that can detect the external environment, but can still successfully complete like wel
11、ding, painting, delivery as well as for materials simple movements. Second generation mechanical arms are equipped with sensors and manipulators have the environment there is a certain amount of sense, when the mechanical arm is to use the program as a basis. Difference is that the robot begand第 - 3
12、1 - 页 共 32 页抛石挤淤工程施工技术方案一、编制依据1、根据工程总体施工组织设计,结合工序自身特点,制定该分项工程组织设计。2、该分项工程组织设计以我单位现有施工技术力量和施工经验为基点。3、设计院提供的图纸资料(送审稿)。4、公路工程质量评定标准JTG F80/1-2004,公路工程施工安全技术规范JTJ076-95,公路软土地基路堤设计与施工技术规范JTJ017-96。 二、工程概况本合同讫止里程K17+940K22+989.311,主线5.049km。所经区域水系发达,稻田、鱼塘较多。设计处理方式主要有:结合抛片、块石和清淤换填,抛石挤淤法是在路基底从中部向两侧抛投一定数量的片石
13、,并用压路机碾压,将淤泥挤出路基范围以外的一种施工形式,此法施工简便易行,无须抽水和清淤;标段抛石挤淤工程数量见-抛石挤淤工程数量表。抛石挤淤工程数量表序号起止桩号长度(m)片石厚度(m)抛投片石(m3)1234567891011121314151617181920212223242526272829303132333435363738394041424344454647三、施工准备1、本合同段抛石挤淤工程数量较大,为保证施工质量,在施工前,应做好以下准备工作:1.1、组织技术人员认真阅读设计图纸和技术资料,熟悉合同文件和技术规范。 1.2、组织有关人员对水准点及控制桩等进行全面的调查、核对。
14、 1.3、做好现场布置及临时设施的施工、维护、修建施工便道。 1.4、恢复路线中、边线,抛填片石平面位置、打桩标明后报监理工程师检查。 1.5、开挖临时排水沟排除地表水,在放路基抛填片石边线时,每侧应按横断面图适当加宽。 1.6、将用作抛填的相关原材料(如片块石)经自检合格后上报监理工程师审批。 1.7、在抛填片石的红线范围内沿线开挖临时排水沟渠,修建临时排水设施,以保持施工场地处于良好的排水状态,以防止工程或附近农田受冲刷、淤积。2、施工现场平面布置及临时工程方案2.1、充分利用既有公路和乡村道路,结合本合同段的施工便道,作为施工现场运输的主便道。2.2、施工现场配备发电机,供应施工及生活用
15、电。四、施工进度计划本工程计划于2010年11月15日开始进行抛石挤淤施工, 2011年4月30日结束,工期为166天。五、人员、机械及材料(一)人员本分项工程的施工主要人员配备情况(见下页):管理人员操作人员技术负责人1名挖掘机司机28名测量人员2名装载机司机8名现场技术员2名压路机司机8名机料管理人员2名自卸车司机45名试验人员2名电 工2名质检人员2名其他工种20名安全管理人员2名后勤保障人员2名现场工长1名合 计16名合 计111名全部人员共计127名(二)机械设备本段抛石挤淤施工主要设备见下表。序号机械名称型号和功率拟投入数量1挖掘机CAT320C28台2装载机ZL508台3压路机Z
16、Y20B/LRS10258台4自卸车5T45辆5全站仪莱卡4套6水平仪2套(三)材料抛石挤淤的主要原材料是片块石,原材料质量的好坏直接关系到抛石挤淤的质量,片块石及碎石选用万古石场生产的材料,该石厂生产规模大,场地宽阔,石质稳定,能够满足施工需要。原材料质量控制:片块石:石料的强度应符合设计要求,石质应均匀、不易风化、无裂纹、剥落、受腐蚀严重的石料不得使用。六.抛石挤淤施工技术方案1、工艺流程:整修便道挖沟排水抛大块石挖机作业并碾压再抛大块石挖机碾压挤淤至线外填塞小石块压路机碾压密实。2、材料控制:本工程用的所有块石、片石都必须经过检验,抗压强度大于20Mpa。且监理在场的情况下抽样合格后才能
17、用于工程。凡检验不合格者,应立即清退出场。用于本工程的材料,必须随时接受监理工程师的抽样复查。3、施工方法:按设计图要求须测量放线,确定其抛石范围并经业主或监理工程师现场检查界线。沿互通路基填筑施工便道分别至K78+560和K68+110处,根据现场情况:软土厚度薄,采用抛填的片石不宜小于30CM。在地势平坦的路段,抛填时,自中线向两侧展开,使淤泥向两边挤出;横坡陡于110时,自高向低展开抛填,使淤泥向地势低的一侧挤出,采用装载机配合挖掘机施工。片石露出软土后,用较小的石块填塞垫平,并用振动压路机振动压实,振动过程中,观察到填石顶面不再沉降,且表面平整后,停止压实。然后在其顶面设置反滤层,压实
18、后进行路基填土。4、抛石挤淤质量检查:主要检查抛石宽度、厚度以及顶面高程应符合设计及施工技术规范要求。5、沉降观测 (1)、在完成换填部位设置观测标志,采用埋设沉降板进行高程观测。按照设计要求,分别设置于路基中央、路肩、坡趾。 (2)、观测桩采用60cm60cm6mm的钢板上焊上25.4mm钢管作为测杆埋入基底,测杆外套50mm的PVC管,以减少下沉阻力。随填土高度增加,测杆和套杆同时加长,接高后的测杆略高于套管,套管上注意加盖,防填料落入管内影响测杆下沉自由度;盖顶不高出碾压面50cm。 (3)、观测:采用S3型水准仪,以二级中等精度进行高程测量。每填筑一层观测一次,如填筑间隔时间较长,第一
19、个月每3天观测一次;第二、三个月每7天观测一次;第四个月起每15天观测一次;并作好测量观测记录,及时整理、汇总观测结果,作为该段路基稳定的评价资料。七、质量保证体系和质量保证措施1、质量保证体系 为确保施工的顺利进行,我项目部建立了严格的质量管理制度,健全质量奖罚制度。严格控制施工质量。 1.1、质量保证管理体系组织机构(框图附后): 1)、成立以项目经理为组长、总工程师、项目经理部工程技术负责人和质检部负责人为副组长的全面质量管理领导小组,形成行政上支持,技术上把关的良性循环,负责工程总体需求量控制。2)、由施工组负责人、技术负责人并配备相应的技术人员及质检员,成立质量自检小组,形成第一级自
20、检体系。 3)、配备强有力的质检技术力量,以质检部为龙头,组织试验室、测量组、电算室实施各工序的管理和数据检测,形成第二级自检体系。 4)、质检人员在施工过程中,被授予事前介入权、事中检查权、事后验收权、质量否决权,项目部质检部直接对项目经理部负责,不受任何人,任何事干扰。5)、专职质检人员必须是经过专门培训,具有一定资质和现场施工经验的专业技术人员,经项目经理部批准后方能担任。2、工序质量检查程序: 2.1、作业班(组)在每一道工序过程完成后,由各班(组)的质量检查小组按设计图纸和技术规范要求进行自检,合格后报项目经理部的质检科进行复检。 2.2、项目经理部质检科确认自检组的检查有效并签字后
21、进行复检。经质检科复查合格,质检工程师签字后将检查表格报送监理工程师,请监理工程师进行检查,检查合格后方可进行下道工序施工(工序质量监控流程图附后)。3、质量保证技术措施(1)为确保桩位置的准确无误,施工时先放出边线后,用石灰粉撒好每一个桩的准确位置,保证抛填边线正确。(2)材料的采购:所有进场材料都必须经检验合格方准进入施工现场。(3)材料的堆放:有专门的堆放场地,材料应分类堆放整齐,并有标示牌标示清楚。(4)抛填质量控制:抛石挤淤砌体必须严格按照施工技术规范进行施工,坚持上道工序经检验合格后方可进行下道工序施工的原则。(5)技术培训定期或不定期地组织职工开展岗位技能培训,学习有关规范、标准
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 抛石挤淤 施工 技术 方案
链接地址:https://www.31ppt.com/p-5517533.html