u成都某大型地下室基坑边坡支护工程施工组织设计(放坡 土钉挂网支护)secret.doc
《u成都某大型地下室基坑边坡支护工程施工组织设计(放坡 土钉挂网支护)secret.doc》由会员分享,可在线阅读,更多相关《u成都某大型地下室基坑边坡支护工程施工组织设计(放坡 土钉挂网支护)secret.doc(31页珍藏版)》请在三一办公上搜索。
1、assessment; 2, for employees working in this sector allocation, performance evaluation and reward (or punishment recommendations) authority; 3, within the limits of responsibility according to the system of ownership of the work of the authority; 4, the right to confidentiality in the company archiv
2、es; 5, the right to the assessment of departments; 6, request other departments within the Department be reasonable coordination authority; 7, the right to review of the fees; 8, urging implementation of the personnel management system, and corresponding punishment for violations of the system recom
3、mended by the authority; Department: General Office two superiors: jobs covered by the Manager and the subordinate departments: Director, General Accounting, Treasury, material accounting, appraisal, asset manager departments job: responsible for development, audit, inspection, evaluation, managemen
4、t regulations, and the companys financial and material management. Main functions: 1, common functions, in charge of the annual, quarterly and monthly work plan and report, with regular work, looking for a job gap, improve the quality of work; 2, responsible for the companys rules and regulations, p
5、rovisions, arrangements, notices and other documents of implementation in this sector; 3, responsible for the internal management rules of construction, implementation and improvement of work; 4, in charge of the departments and agencies post functions, running processes, the development of assessme
6、nt methods and assessment work; 5, responsible for the成都 地产开发有限公司 (成都)大一期(G12-G26栋)1#地下室基坑边坡支护工程施工组织设计二七年一月目 录一、项目概况5工程概况5基坑周边环境5场区岩土工程地质条件5设计概况8二、编制依据8三、项目组织机构9项目法施工9组建项目经理部9项目管理总目标10项目部主要管理人员名单及岗位职责10四、施工准备11施工总平面布置与管理111.临时用地计划112.围墙和出入口设置123.施工道路及排水124.仓库、钢筋加工及材料堆场125.现场办公、生活区126.临时水电方案127.施工总平面
7、布置图13现场施工准备13技术准备13施工机械计划准备14材料准备14劳动力安排准备14五、主要分部分项工程施工方法15土钉挂网施工15地面硬化与排水沟施工16降水井施工161.设备选择162.施工工艺流程163.施工准备174.施工方法及技术要求175.降水运行注意事项18六、土方开挖施工安排18土方开挖流程18土方开挖施工要求18七、质量管理19质量保证体系191.组织保证体系192.主要管理人员质量职责19确保工程质量的技术组织措施201.质量管理制度202.组织制度措施203.质量管理措施214.应急应变措施21八、工期保证措施22施工进度计划22确保工期的技术组织措施231.组织保证
8、措施232.技术保证措施233.机械设备保证措施244.材料供应保证措施245.工期奖惩措施25九、安全生产25安全生产管理体系25安全生产管理制度26确保安全生产的技术组织措施261.用电安全262.机械安全防护273.安全检查27安全生产施工组织设计27十、文明施工27确保文明施工的技术组织措施27现场消防保卫措施28环境保护的技术保证措施29十一、基坑监测及应急补救措施30基坑监测30应急补救措施30 (成都)大一期(G12-G26栋)1#地下室基坑边坡支护工程施工组织设计一、项目概况工程概况 (成都)大一期项目是由成都心怡房地产有限公司投资兴建的高档住宅小区,该地块位于成都市双流县华阳
9、镇广福社区,人民南路南延线未端,成都市规划地铁线1号线南端的起点。 (成都)高档住宅小区大一期项目总规划用地面积23.5公顷,居住小区规划净用地面积18.64公顷,地上总建筑面积567975.62m2,地下建筑面积121057.00m2;建筑占地面积44176.80m2;总绿地面积73258.00m2;其它用地面积43310.20m2。结构设计采用框架剪力墙结构,局部采用筒体结构。G12-G26栋(含G2-G8栋)地下设12层地下室,连通成一整体,其中,G12-G18栋(含G2-G7栋)地下室为1#地下室。1#地下室基坑开挖面积约54215平方米。本工程0.00相当于绝对标高475.25m,基
10、坑平均开挖深度约6.0m。本工程由 建筑设计院负责设计,岩土工程勘察报告由 地质工程勘察院提供。基坑周边环境拟建基坑周边场地开阔,无重要建筑物及市政道路,基坑开挖对周边环境影响很小。场区岩土工程地质条件1.场地工程地质条件根据建材成都地质工程勘察院提交的岩土工程勘察报告,场地内与基坑支护相关的土层自上而下为:耕土:褐色灰褐色,松散,成分以粉质粘土和粉土为主,含少量砖瓦碎块、炭屑等,厚度0.400.80m,在场地大部分地段地表均有分布。杂填土1:杂色,松散,成分主要为砖瓦碎块、炭屑等建筑垃圾,厚度0.402.40m,该层主要分布在原居民居住区;素填土2:主要成分粉质粘土、粉土,含少量砖块、瓦片等
11、,厚度0.304.20m,在场地在部份地段地表均有分布。淤泥:灰黑色,饱和,流塑,成份主要为粘粒,含大量有机质,具臭味,埋深1.902.30m,厚度0.600.90m,该层仅在47、49号钻孔中揭露。粉土:青灰褐黄色,稍湿湿,松散,局部夹粉质粘土团块,下部含少量砂粒,埋深0.604.50m,厚度0.304.40m,该层呈透镜体状分布于局部地段。软塑粉质粘土1:褐黄褐色,软塑,稍湿,含铁锰质氧化物及少量粘土团块,局部相变为粉土,该层呈似透镜体状分布,分布不连续,局部缺失,埋深0.600.70m,厚度2.603.90m;可塑粉质粘土2:褐褐黄色,可塑,稍湿,含铁锰质氧化物及少量粘土团块,局部相变为
12、粉土,该层呈似透镜体状分布,分布不连续,局部缺失,埋深04.00m,厚度0.404.20m,该层在场地内大部分地段均有分布;硬塑粉质粘土3:褐褐黄色,硬塑,稍湿,含铁锰质氧化物及少量粘土团块,局部相变为粉土,该层呈似透镜体状分布,分布不连续,局部缺失,埋深0.402.10m,厚度0.504.50m,该层在场地内大部分地段均有分布。细砂:青灰褐黄色,稍湿,松散,含泥质,埋深2.204.80m,厚度0.502.30m,该层分布在粉土层下部和卵石层顶部,场地内局部地段分布。中砂:青灰褐灰色,湿饱和,松散稍密,主要成分为石英、云母碎片及暗色矿物等,埋深2.109.70m,厚度0.403.60m,该层呈
13、透镜状分布在卵石层中,在场地内大部分地段均有分布。疏松卵石1:灰黄灰色,稍湿饱和,卵石含量小于55,埋深3.0010.00m,厚度0.403.20m,该层在整个场地内均有分布。稍密卵石2:灰黄灰色,饱和,卵石含量为5560%,埋深1.009.90m,厚度0.304.90m,该层在整个场地内均有分布。中密卵石3:灰黄灰色,饱和,卵石含量为6070%,埋深1.809.80m,厚度0.505.40m,该层在场地大部分地段均有分布。密实卵石4:灰黄灰色,饱和,卵石含量为70%以上,埋深2.8010.90m,厚度0.303.80m,该层在场地内部分地段均有分布。强风化泥质砂岩1:经钻探揭露层顶埋深8.1
14、011.60m,揭露厚度0.302.80m,该层分布在整个场地;中风化泥质砂岩2,钻探揭露厚度最大10.50m,该层分布在整个场地。2.场地水文地质条件场地内存在的地下水类型主要为孔隙潜水和基岩裂隙水。孔隙潜水赋存于砂卵石层中,受大气降水及府河地下水补给,水量丰富。水位变化受府河水位及季节性控制,勘察期间正值地下平水期向半枯水水期过渡,其水位变化大,其初见水位一般在砂卵石层顶面附近,稳定水位一般为2.604.50m(470.39m472.33m),具微承压性。预计至枯水期,其水位将会较现水位下降1.0 m左右。预计至次年丰水期,其水位将会较现水位上升1.5m左右。基岩裂隙水赋存于下伏的强风化、
15、中等风化泥质砂岩中,水量主要受裂隙发育程度、连通性及隙面充填特征等因素的控制。水量相对较小,富水性不均匀。由于其埋藏较深,局部地段涌水量较大,管井降水对该层水的作用效果差。根据勘察报告显示,府河河水对本基坑内工程降水不会造成大的影响。场区地下水对砼及其中的钢筋无腐蚀性,对钢结构有弱腐蚀性。设计概况本工程支护结构设计采用土钉挂网喷射混凝土支护(放坡+土钉挂网支护)方式。基坑设计支护深度均为6.0m。详见我公司成都心怡房地产开发有限公司 (成都)大一期(G12-G28栋)1#地下室基坑边坡支护工程设计文件。二、编制依据(1)本工程相关图纸(中南建筑设计院 2006.12);(2)本工程岩土工程勘察
16、报告(建材成都地质工程勘察院 2006.11);(3)成都地区建筑地基基础设计规范(DB51/T5026-2001);(4)建筑基坑支护技术规程(JGJ120-2004);(5)建筑基坑工程技术规范(YB 9258-97);(6)土层锚杆设计与施工规范;三、项目组织机构项目法施工本工程施工中实施项目法管理施工的模式,组建本工程项目经理部,对工程施工全过程的进度、质量、安全、成本及文明施工等全面负责。项目经理部要以工程项目管理为核心,以优质、高效、安全、文明为主轴,加强动态与科学管理,优化生产要素,从文件控制、材料采购、产品标识到产品实现全过程进行有效监控,切实推行ISO9001:2000系列标
17、准和本公司质量保证体系文件,达到优质高效的管理目标。组建项目经理部本工程实行项目法施工管理,委派管理水平高、实践经验丰富的同志担任项目主要负责人,抽调优秀工程管理和专业技术过硬人员组建项目部。1.项目部设立工程部、技术质量部、安全管理部、物资设备部、办公室等五个项目管理职能部门,具体负责现场项目管理各个要素的全过程管理工作,且在各部门下设管理组。2.项目管理层由项目经理、项目副经理、主任工程师、生产调度、技术主管、安全主管、质量主管、材料主管、机械主管和后勤主管等成员组成,其主要职责是在公司质量方针指导下,以项目经理为核心,分工负责,代表公司全权负责该工程的实施工作,圆满实现对业主的承诺。3.
18、项目作业层人员配备:施工人员均挑选劳动技能熟练有同类工程施工经验的正式工和合同工,按工种组成作业班组,挑选技术拔尖、思想素质好的职工带班。现场管理组织机构详见图1: 项目经理部组织结构图 图1项目经理技术负责人项目副经理工 程 部技术质量部办 公 室物资设备部安全管理部项目管理总目标质量目标合格工程,确保工程全部达到国家现行工程质量验收标准。工期目标60个日历天。安全目标安全生产优良施工现场。无重大质量事故及人员伤亡事故文明施工目标:创文明施工优良工地。项目部主要管理人员名单及岗位职责 主要管理人员职责一览表 表2岗 位姓 名岗 位 职 责项目经理对本项目的施工技术、安全、质量及工期全面负责,
19、直辖各部门工作。项目副经理主管生产、进度、安全及各项管理制度的落实。技术负责人负责对施工技术、安全生产、质量组织管理,组织对内资料的管理。技术员实施施工组织设计方案和技术开发,调度工序的衔接,整理有关资料,记录现场施工日志。质检员负责各工种、各工序的施工全过程质量检查和监督,填写各种质量检查表格。测量员负责场区桩孔放线定位及校核,绘制单桩测量定位图,整理测量成果。安全员负责各工种设备的安全检查、现场安全警示牌的设置、劳保用品的发放及每天的安全检查与整改措施的落实。材料员负责材料采购、供应检验、记录材料台帐,完成领导交待的其他事务。四、施工准备施工总平面布置与管理根据本工程所处位置和与周围场地的
20、距离关系,在充分考虑满足施工需要情况下,我们在现场合理布置了临时办公室、宿舍、食堂、厕所、钢筋加工场地及材料堆放场地,详见附录1(图2)“施工总平面布置图”。1.临时用地计划 临时用地计划表 表3用途面积()用途面积()办公室30厕所30临时宿舍200材料仓库50厨房40水泥库房60门卫10钢筋加工场地1002.围墙和出入口设置在现场四周用砖砌围墙进行全封闭围护,设置两个出入口,使场地内部临时运输车道形成闭合线路。3.施工道路及排水修建场内临时运输车道,车道周边挖排水沟,进行有组织排水。在排污口附近设置沉淀池,施工污水及生活用水经沉淀池净化后排入市政管网,在场地北侧入口处修建洗车槽,以减少扬尘
21、和车辆带泥污染。4.仓库、钢筋加工及材料堆场现场合理设置材料仓库,工具库房及锚杆制作场地和材料堆场,并根据不同施工阶段的要求进行调整。5.现场办公、生活区现场办公室利用活动房,职工宿舍、仓库、食堂沿南侧围墙边搭建,厕所现场已有可直接利用。6.临时水电方案临时供水方案现场用水需满足钻机、机械设备冷却循环等生产和消防及施工人员生活用水的需要。施工阶段主管采用d50mm管径即可满足现场用水的需求。现场供水主管采用50PPR塑料管,绕现场周边布置,装表计量使用。临时用电方案预测施工高峰期用电量为300kw,从业主指定电源点引入施工现场,装表计量使用。7.施工总平面布置图见附图1所示。现场施工准备根据施
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- u成都某大型地下室基坑边坡支护工程施工组织设计放坡 土钉挂网支护secret 成都 大型 地下室 基坑 支护 工程 施工组织设计 土钉挂网 secret