出入口明挖基坑施工方案.doc
《出入口明挖基坑施工方案.doc》由会员分享,可在线阅读,更多相关《出入口明挖基坑施工方案.doc(28页珍藏版)》请在三一办公上搜索。
1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat
2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi
3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high
4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in
5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i
6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c
7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont
8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall
9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve
10、y water should use a dedicated .北京地铁十号线一期(含奥运支线)工程光华路站西北出入口明挖基坑施工方案编 制: 审 核:审 批:中国建筑工程总公司北京地铁十号线第十六标段项目部2006年05月Exam exam elements 1. find out the Central thesis of the article 2: identify types of arguments summarized the arguments of the main content 3. identification of the methods used in this p
11、aragraph or sentence, and its benefits. 4. (this paragraph) demonstration (process) what is it? 5. taste the benefits or effects of some words in a sentence. 6. for an article to add a fact or reasonable argument 7. do you agree with the author? Please explain the reasons. Argumentative is talking a
12、bout as the main expression of style. Through facts and reason, use logic to show that the authors views and attitudes to an issue and analysis on some phenomenon of insights and ideas. Three elements of argumentation elements: argument 1, argument: argument: authors opinions, views and ideas. (Righ
13、t, distinct) Note: essays generally have only one argument, some around the central argument put forward several arguments, arguments are used to justify central argument. Find argument of method: a to see articles of title II to note argument in articles in the of location title reveals; b beginnin
14、g proposed; c talk process in the sharp proposed; d end antibody; articles in the no proposed, needed readers himself antibody note distinguish topics and argument: topics is talk paper by to described of main content, and argument is author on by described of content by made of clear of judge of se
15、ntences. 2, looking for or refine the method arguments: (a), see topic (b), start (c), end (four), middle (five), his induction an honest man is always suffer? in the dark old days of corruption, honest people suffer is not surprising, even commonplace. However, with the development and progress of
16、society, honest man suffer losses no longer become a common and normal phenomenon. Dishonest people may be proud of a moment, but ultimately the expense of them. As Lu Xun said leasing will also drown his own. Illusion and lies was uncovered the day liar He Yan people? some flattery, speculative hac
17、k who soon would be appreciated by a boss, but he would always ride it? the saying goes: clever to be wise dishonest people ultimately have to pay the price for his dishonesty. Overall, or doing an honest man does not suffer. This argument is an honest man does not lose exam: argument is that how co
18、me? Introduction of arguments: (1), straight to the central argument put forward. For example: on the backbone of the proposed opening of we Chinese are proud of (2), ask questions, add a central argument. For example: of the thinking and doing for dreams and death of the arguments. (3) cases, accor
19、ding to the experience of a life point (4), draws from the story problems, arguments (5), the central argument put forward in some way. For instance, metaphor, comparing elements of the second: the arguments argument: the material to prove point. (Authentic) 1, argument type facts .目 录1编制依据11.1现行施工图
20、纸11.2相关工程技术规范11.3相关安全施工规范12工程概况12.1概况12.2工程地质及水文地质条件23施工方法及工序23.1出入口明挖基坑施工方法23.2出入口明挖基坑施工流程24准备工作24.1前期准备24.2现场平面布置34.3地下管线探测34.4施工区域降水35明挖基坑施工45.1测量放线45.2钻孔灌注桩施工45.2.1施工方法45.2.2施工准备45.2.3施工流程45.2.4施工工艺55.2.5控制要点65.3冠梁施工75.3.1施工方法75.3.2流水段划分85.3.3施工流程85.3.4施工工艺85.3.4质量控制要点95.4土方开挖105.4.1施工方法105.4.2施
21、工流程105.4.3施工工艺115.5钢支撑安装115.5.1施工方法115.5.2质量控制要点125.5.3钢支撑施工的监控量测125.6土钉墙施工135.6.1施工方法135.6.2施工流程135.6.3施工工艺135.6.4质量控制要点145.7基坑工程监测155.7.1地表沉降监测155.7.2地下水位监测155.7.3围护结构稳定监测165.8明挖基坑施工应急措施165.8.1围护墙渗水与漏水处理165.8.2防止围护墙侧向位移发展175.8.3流砂和管涌的处理175.8.4临近建筑物和管线位移控制175.9冬季施工176施工进度计划177主要资源计划177.1主要劳动力计划177.
22、2主要原材料计划187.3主要机械设备计划188质量标准188.1混凝土灌注桩质量检验标准188.1.1钢筋笼加工质量检验标准188.1.2混凝土灌注桩质量检验标准198.2冠梁施工质量检验标准198.2.1模板安装质量验验标准198.2.2钢筋工程质量检验标准198.2.3混凝土工程质量检验标准208.3土方开挖工程质量检验标准208.4钢支撑施工质量检验标准208.5桩间网喷混凝土施工质量检验标准218.6土钉墙施工质量检验标准218.7混凝土垫层施工质量检验标准219保证措施229.1质量保证措施229.2安全保证措施229.3文明施工及环境保护措施221编制依据1.1现行施工图纸 北京
23、地铁十号线一期(含奥运支线)工程施工设计车站出入口建筑施工图;北京地铁十号线一期(含奥运支线)工程施工设计车站出入口结构施工图;北京地铁十号线一期(含奥运支线)工程施工设计车站主体施工图(A版);北京地铁十号线一期(含奥运支线)工程施工设计结构防水施工图。1.2相关工程技术规范地下铁道工程施工及验收规范(GB50299-1999);地下工程防水技术规范(GB50108-2001); 地下防水工程施工质量验收规范 (GB50208-20);钢筋焊接及验收规程(JGJ18-2003);混凝土强度检验评定标准(GBJ107-87);混凝土质量控制标准(GB50164-92);混凝土结构工程施工质量验
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 出入口 基坑 施工 方案
链接地址:https://www.31ppt.com/p-5209103.html