k外墙涂料施工方案—质感涂料、真石漆、岩片漆、仿砖涂料.doc
《k外墙涂料施工方案—质感涂料、真石漆、岩片漆、仿砖涂料.doc》由会员分享,可在线阅读,更多相关《k外墙涂料施工方案—质感涂料、真石漆、岩片漆、仿砖涂料.doc(11页珍藏版)》请在三一办公上搜索。
1、yuan, an increase of 17.5%; local government general budget revenue of 500 million Yuan, . Painting, model culture creates new Ma Church community, creating Lake scenic spot culture education base, received high evaluation from provincial and municipal discipline Inspection Commission, the peoples d
2、aily special report. Constantly promote independent Commission against corruption culture construction to rural extends, created established Dahlin rural industry Park independent Commission against corruption culture positions, formed has a support service low double excellent of members lead team,
3、 constantly perfect and established Park funds assets management, and village audit supervision, and villagers democratic financial, system, strengthening Park party, and Chief, and financial, full public, powerful to guarantees has new rural construction, by city rural style clean government inspec
4、tion unit led of height evaluation. Through the implementation of honest and clean government cultural construction, and effectively educate the broad masses of party members and cadres and consciously regulated behavior and discipline, honesty in politics and culture to create a good atmosphere and
5、 fresh development environment. Although we in implement implementation independent Commission against corruption guidelines aspects made has must effectiveness, but away from superior of requirements also exists must of distance, main performance for: a is system enough sound, education, and superv
6、ision, and prevention, and punishment, aspects long-term mechanism also enough perfect, especially in enrollment bid work regulatory aspects also needed strengthening; II is regulatory supervision exists lost of Yu wide, and lost of Yu soft, investigation illegal disciplinary case of efforts also ne
7、eded strengthening, individual sector and cadres also different degree exists treat gift, not to benefits not do, and mess do of phenomenon; Three for honest work is the new situations and new problems in finding timely enough, treatment measures are not strong enough. To solve these problems, we wi
8、ll proceed from the following five aspects of rectification, make sure to implement the provisions of the code. (A) deepening the learning, enhance the consciousness of honesty in politics. To create event as an opportunity to Excel and learning party, further increasing the governance capability an
9、d advanced construction, reinforced rules of the broad masses of party members and cadres awareness, sense of responsibility, sense of honor, improve working ability and level of scientific development. Should make full use of meetings, in particular central group learning opportunity, further stren
10、gthening the study and education of the code, the intensive warning education, education the majority of party members and cadres known fear, knew fear, honesty in politics of tension the strings, consciousness and enhancing the implementation of the initiative. Also, pay attention to apply what the
11、y have learned, consciously study results into planning work, new ideas, 外墙涂料施工方案质感涂料与仿砖涂料施工工艺目录一、编制依据1二、工程概况1三、施工安排2四、施工准备3五、主要施工方法及措施3六、注意事项及质量标准7七、成品保护9八、安全注意事项10一、编制依据1.1施工组织设计1.2施工图及设计变更1.3主要规范、规程、标准建筑工程施工质量验收统一标准(GB503002001)建筑装饰装修工程质量验收规范(GB50210-2001) 建筑安装分项工程施工工艺规程(DBJ01-26-96)二、 工程概况 三、施工安
12、排3.1施工平面部置3.2施工控制3.2.1目标控制: 外墙装修工程质量要做到内坚外美,装修施工是非常重要的环节。且本工程争创北京市建筑长城杯金奖,预控国家鲁班奖,对装修工程质量要求较高。将优良指标按分项工程指标层层分解,按岗位职责具体落实到每个人,落实到每个分项工程,并且制定保证指标完成的控制措施。3.2.2过程控制:严格执行样板制、挂牌制、技术交底先行制、质量专检制等各项管理制度,加强过程控制。施工前先进行装修样板施工,经甲方、监理、设计等各方认可后再全面铺开施工,未作样板的分项,不能大面积装修。 3.2.3施工进度安排四、施工准备4.1技术准备认真识图,对图纸中的疑问做好记录,及时与业主
13、、设计单位联系,出具图纸会审记录、设计变更文件等。在施工前,根据图纸标出的层高,每面墙的宽度及门窗洞口位置,结合设计要求,绘制出施工放线图。分格设计时注意门窗口上下必须呈现整砖效果,不得出现刀把砖和窄条砖。此外,还要加强职工的技能培训、安全教育和自我奉献精神教育,加强成品保护教育,提高成品保护意识,提高工人们的思想觉悟。以免在材料运输过程或在下一道工序施工中对成品的破坏。4.2 料具准备每道工序正式开始施工前,经营部提前一周向材料部、生产部提供该工序各种材料用量,生产部根据工程进度、各种材料用量,确定机具用量及其进场时间。材料部按计划提前2-3天将材料、机具运进场。进场后报监理验收,需做复试的
14、取样送检。4.2.1机具准备:经纬仪、水准仪、盒尺、线坠、墨斗、钢丝、铁抹子、托板、滚刷、砂纸,洁净布等。4.2.3材料准备:美纹纸、底漆、面漆、罩面清漆。五、主要施工方法及措施5.1 作业条件5.1.1外墙涂料施工必须是在装修工程的最后阶段进行,以免涂层被沾污或破损。5.1.2质感涂料和岩片漆施工在基层墙体工程验收合格后进行。 5.1.3质感涂料和岩片漆施工前,外墙门窗框安装完毕并验收合格,并对其进行遮挡保护。5.1.4施工现场做到通电、通水并保持工作环境的清洁。 5.1.5环境温度和基层墙体表面温度均不低于0;风力不大于5级。最适宜施工温度为15-35。 5.1.6基层含水率小于10%,环
15、境湿度不得大于85%,所有基材PH值必须小于10。施工前密切关注天气预报,确保施工前后没有降水。 5.1.7质感涂料和石头漆施工宜采用吊篮,墙体不得有预留孔洞及其它有碍于施工的杂物。5.2施工工艺5.2.1工艺流程清扫墙面刮边角腻子用靠尺靠直刮两遍腻子打磨砂纸涂刷底漆拉水平及垂直钢丝 弹分格线贴分格美纹纸批刮面层涂料撕掉美纹纸修理打磨边角分格部位辊涂罩面漆边角分色刷分格线条检查验收5.3施工要点5.3.1基层处理:对基面进行全面检查,如抹刀痕迹,粗糙的拐角和边沿,露网等现象,进行修补;墙面不平,刮补找平腻子,待腻子干透后用砂纸将凸出处磨掉,然后将基层扫净,方可施工。 连接基层的金属件、木螺钉、
16、钉子等进行镀锌等防锈处理。观测外墙阴阳角垂直度和门窗口方正,检查基层平整度,大于5mm处提前处理。雨后施工要检查基层含水率,含水率小于10%,检验方法将一块正方形的塑料布用胶带沿塑料布四周粘贴在墙面上,阳光照射1小时左右,观察塑料布上是否有水珠出现,若无水珠出现,可以施工,否则不能进行施工。5.3.2满刮柔性腻子外墙柔性腻子为双组份产品,粉:胶=2:1,搅拌方法为:将腻子粉倒入胶液中,用搅拌枪进行搅拌,静置10min左右,再进行搅拌,搅拌均匀,保证浆体中无结块。腻子搅拌的粘稠度以工人能达到良好的施工性为标准。一次搅拌的腻子2小时内用完。凝固变稠的腻子浆体不能再加水使用。柔性腻子施工二遍成活,腻
17、子层总厚度控制在1.5-2mm之间,且每一遍腻子的厚度不得超过1mm。待第一遍腻子干后,方可进行第二遍腻子的施工。第二遍腻子施工同时把阴阳角找直。5.3.3涂刷底漆:底漆施工必须满涂,不得露出基底,不得透底,涂刷效果均匀,无流坠,疙瘩现象。5.3.4进行弹线,分隔。弹分格线时注意在单层间均匀分格,层高因施工原因略有误差时微调分格高度,将差值平均在每一层分格中。5.3.5粘贴美纹纸:美纹纸宽10mm,必须粘贴牢固,不得起翘不实,避免面层漆渗入,减少分格缝描修工作量,粘贴时先横后竖。粘贴竖向美纹纸时,从上到下通长粘贴,然后用壁纸刀截断,从而避免竖缝有偏差、错位现象。5.3.6质感涂料面漆施工:批刮
18、面层涂料时厚度均匀,一次批刮面积不得过多,避免涂料干燥后美纹纸撕不下来,一次批刮面积可控制在10-15。此外,质感涂料施工过程中严禁加水稀释由于该工程为质感涂料,因而在施工时极易出现接茬等弊病,连续迅速操作。施涂时从一头开始,逐渐向另一头刮涂,使用相同涂刷工具,涂抹的纹路要左右前后相同,颜色一致。必须以阴、阳角、落水管或自然分隔缝为分界,流水作业,一气呵成。对于没有自然分隔缝等的大墙面,需几个人流水作业,一气呵成。尽量延长湿边时间,缩短间隔时间,避免接茬。同一面墙必须采用同一批号的产品,避免色差的出现。为了保证涂料颜色花色一致,一面墙特别山墙最好一次刮涂完成,不得已间断时,间断在阴阳角、分割线
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外墙 涂料 施工 方案 质感 真石漆 岩片漆

链接地址:https://www.31ppt.com/p-5208756.html