4 混凝土挡土墙施工方案正式版.doc
《4 混凝土挡土墙施工方案正式版.doc》由会员分享,可在线阅读,更多相关《4 混凝土挡土墙施工方案正式版.doc(22页珍藏版)》请在三一办公上搜索。
1、Last week, our economic work Conference held today, held the Countys rural areas for work and five water treatment, three to split Conference, which this year was a matter of Thirteen-Five important meeting of our Countys economic and social development. The main task of the meeting was, on rural wo
2、rk and conscientiously implement the Central, provincial and municipal five water treatment, three to split series of important conferences, learn from the past, study deployment priority tasks this year. Just now, the XXX Deputy head and Deputy County magistrate, respectively, on the work of the XX
3、 was fully deployed, and put forward specific measures and requirements about is in place. County Environmental Protection Bureau, the XX town, town of XX 3 units for a position statement, resounding, demonstrated determination and confidence. Conference also recognition has advanced representative,
4、 this, I also representative County, and County Government, to by recognition of advanced said warm of congratulated! to rural, and water and three modified a split front General cadres workers extend sincere of greeting! following, I again told five points views: a, and deepening awareness, further
5、 enhanced work of sense and urgency since party of 18 session v plenary proposed has innovation, and coordination, and green, and open, and shared five big development concept Hou, rural and environment governance work can said was upgrade to has more high of strategy level, is Thirteen-Five build w
6、ell-off a top priority task. XX, County besides lingxi, Longgang, jinxiang, the Treasury, the hills, several industrial town outside the city centre, is basically belong to other rural areas, area, the vast rural population. Same time, the current and coming period, is the County into a crucial peri
7、od of the South Gate of XX beautiful, environmental regulation directly affects the effectiveness of the strategic objectives can not be achieved. Therefore, the focus on rural work and five water treatment, three to split, the XX economic and social development has an important role. Last year, thr
8、ough the joint efforts of the County, reform of the agricultural and rural development has made great progress in our County, environmental remediation and achieved initial results. Three agriculture agricultural modernization level continues to increase, new 4-level modern agriculture Park, release
9、d 20 agricultural leading enterprises above the county level, the County area of 200 acres of land more than eco-leisure, investments of more than 5 million Yuan reached more than more than 100 agricultural projects. Rural development has improved continuously, boutique line 1 completed the beautifu
10、l countryside, fine village 17, beautiful rural development conference was held in lingxi peach Lake in the city. Promote comprehensive rural reform, included in the provinces building three in one system of farmers cooperative economic organization first promoting the County. Improvement of farmers
11、D64-D65段公路路基挡土墙工程公路路基挡墙施工方案编 制: 审 核: 审 批: 河南黄金建筑安装公司二零一四年十二月五日methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its
12、 alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mecha
13、nical properties test of welded plate II, mechanical equipment installation engineering 1 GB150-98 2 GB50128-2005 vertical cylindrical steel pressure vessel steel welded specification for construction and acceptance of oil tank 3 JB/ T4735-1997 steel welded atmospheric pressure vessel 4 GB50231-2009
14、 mechanical equipment installation engineering construction and acceptance specification for 5 GB50275-98 compressor, fan and pump installation engineering construction and acceptance specification for lifting 6 HG20201-2000 construction installation engineering construction standard 7, HG . Pressur
15、e gauges, using an installed spark arrestor for acetylene cylinders, illegal carrying, using gas cylinders, each operator fined 20 Yuan. Gas bottle without the hot sun exposure measures, responsibilities of team a fine of 50 Yuan. (7) at height and the opening and provisional protective measures hav
16、e been taken,living standards, poor farmers in less than complete elimination of 4600 Yuan, 8949, 19008. Five waters rule: the County invested 2.169 billion yuan, similar counties line the citys first complete the 42 km of sewage pipe network construction, completion rate ranked first in the city, w
17、on the provincial rural sewage treatment work better; key pollution sources such as electroplating, papermaking, chemical industry management through verification and acceptance of the municipal government, the County removed Black and odorous River, River waste, beginning of river ecological restor
18、ation effects. Three modified a split aspects: County total demolition illegal area up 2.759 million square meters, completed City issued annual task of 153%, split against area ranking city second; completed three modified area 4.846 million square meters, completed City issued annual task of 403%,
19、 ranking city third, which village in the a target completed total city ranking first; County Government was named city level three modified a split work advanced. These achievements are hard won and should be appreciated. However, we are fully aware, the new period, and work in the countryside and
20、the environment facing higher standards and requirements, provincial party Committee offered to high level build a comprehensive well-off society goal requires no filth, dirty environment illegal buildings, into a well-off; municipal party Committee also proposes to build into the well-off benchmark
21、 goals of the city. Compared with the superior claim, South Gate of XX beautiful goal, my County San Nong and environment there are a number of weaknesses and gaps, highlighted in the following five aspects: first, agriculture remained low pattern. Low is reflected in the quality and low; short, val
22、ue added of the industry chain is low; 123 fusion yield low employee age, low quality. Small is reflected in smaller, specialized cooperatives throughout the County there were 3,396, but on the scale of too little. San is reflected in production, management, services, decentralized, centralized, sta
23、ndardized, brand, information and organizational level is not high. Second, the countryside is still in dirty phase. Dirty is dirty of rural sanitation situation has not changed. Chaos is a village in rural housing construction planning, construction of disorder, no drawings, no construction, no vet
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 混凝土挡土墙施工方案正式版 混凝土 挡土墙 施工 方案 正式版
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-5208643.html