甘肃省省外勘察设计单位在甘承揽工程勘察设计业务管理规定.doc
《甘肃省省外勘察设计单位在甘承揽工程勘察设计业务管理规定.doc》由会员分享,可在线阅读,更多相关《甘肃省省外勘察设计单位在甘承揽工程勘察设计业务管理规定.doc(12页珍藏版)》请在三一办公上搜索。
1、blind Board operational security requirements 1. blocking blind Board operations required to handle blocking blind Board operating license, no blocking blind Board operating license are not allowed to smoke blocking blind Board operations. 2. it is strictly prohibited to alter, lent the blocking bli
2、nd Board operating license. Content conversion and expansion of operations or transfer jobs site, again for blocking blind Board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the right
3、 to refuse to work. 4. toxic gas piping, equipment blocking blind Board, non-irritant gas pressure should be less than 200 mm Hg; irritant gas pressure should be less than 50 mm Hg; gas temperature should be less than 60 degrees. 5. Technical Department responsible for drawing blind location map, nu
4、mbers the blind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind Board work, and to designate a person respons
5、ible for monitoring. Guardians are advised by experienced officers. , Guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. Guardians must adhere to the scene, and emergency treatment. Job guardian sha
6、ll not leave the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and Environment Department, is responsible for personnel. Involving the entire production system, head of the technical department must be present. 8. in place
7、s where inflammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind Board operation shall follow the provisio
8、ns of license for working at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out. 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind Board
9、 operations. When plugging multiple blind, blind to blind location map and plates number by construction General Manager, unity of command assignments. 12. signs in each blocking blind Board shows that blind location. (C) the blocking blind Board permits the management of 1. . Blind location map, im
10、plement security measures, after the approval of the technical department, assignment units (staff) to confirm. Job complex, dangerous places required security audits of the Department of environmental protection, the company in charge of safety Vice President for approval. 4. approve a good blockin
11、g blind Board operating license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technicalBuilding industry opens up new world of entrepreneurial struggle to build a three provinces of regional central cities-in the Communist x
12、 counties the six plenary session members and comrades: today, I was commissioned by the County party Committee Standing Committee, reports to the General Assembly. Consideration of all members and alternates, and comrades attending advice. A, and this year yilai of work recalled this year yilai, in
13、 municipal of right led Xia, County solidarity led County people, to science development views for guide, to good activities for mainline, according to a city four modernizations three more of development thought, concentrated poly force, work hard, political, and economic, and culture, and social a
14、nd party of construction are made has new progress, County rendering out wind fresh are, and career prosperity, and social settled, and people mind into of good situation. (A) facilitating the construction of the project. Firmly establish the scratch project is economic, grasping development project
15、 is to hold philosophy, to extraordinary efforts to promoting the construction of key projects. Plot 108 key projects for the year, with a total investment of 29.3 billion yuan, iron plate, Josh stone cement waste heat power generation and 13 projects completed, worship of 1.2 million tons of pellet
16、s, Hua Yu 80,000 sets of grandparent chicken farming, 47 projects under construction, completed investment of 3.95 billion yuan, annual plan of 69.3%. The first half of the Countys gross domestic product is expected to reached 8.5 billion yuan, and total revenue of 943 million Yuan. (B) structural a
17、djustment achieved remarkable results. Actively transforming the pattern of economic development, industrial ecology, and agricultural modernization and industrialization of services. High x-County • Tin iron circular economy demonstration area, and further expand economic development zone Jin
18、g Dian recycle economy ecology industry Park, Park, circular economy and rapid economic development. Focus more on the dialectical relationship between development and environmental protection, energy saving and emission reduction projects play an important role. Vigorously developing agriculture, e
19、cological agriculture, agriculture, modern agricultural clearing along the River Promenade begins to take shape. Key tourism projects is going well, WA Palace area was named top ten most influential cultural relics in Hebei province landscape. Develop new services, and services with new developments
20、. (C) urban-rural integration process. Promoting three-year difference campaign, battle of two large demolition completed 32 days of 530,000 square meters, exceeded the annual Task 7 months in advance. General big building jiangjun road, bridge and highway bridges, the green heart of the city and ot
21、her urban construction projects, and focus on building new countryside and new housing model villages, urban and rural areas improve. Highway opened to traffic, Liu Zhang, Qing LAN high-speed x-County section completed by the end of August. Urban and rural甘肃省省外勘察设计单位在甘承揽工程勘察设计业务管理规定第一条 为了加强全省勘察设计市场管
22、理,维护勘察设计市场秩序,规范省外勘察设计单位在甘勘察、设计经营行为,确保建设工程勘察设计质量,根据建设工程勘察设计管理条例、甘肃省建设工程勘察设计管理条例等法规,制定本规定。第二条 凡省外勘察、设计单位在本省行政区域内从事工程勘察、设计活动,均应遵守本规定。第三条 本规定所称省外勘察、设计单位是指工商注册地不在本省行政区域内,具有独立法人资格并已取得国务院建设行政主管部门或省级建设行政主管部门颁发的工程勘察资质证书、工程设计资质证书的工程勘察、设计单位。第四条 省外勘察、设计单位在甘从事勘察、设计活动,应遵守法律、法规、规章及有关规定,并应在省建设行政主管部门办理所承担勘察或设计项目的备案手
23、续。第五条 省建设行政主管部门对省外勘察、设计单位在甘勘察、设计活动的备案实施统一管理。各市(州)建设行政主管部门负责对承担本行政区域内建设工程勘察、设计业务的省外勘察、设计单位的日常监督管理工作。第六条 省外勘察、设计单位在甘从事勘察、设计活动,须按项目办理省外勘察设计单位在甘勘察设计项目备案书(以下简称备案书)。取得备案书后,方可对外发送和报审勘察报告、初步设计和施工图设计等文件。第七条 省外勘察、设计单位在甘承揽工程勘察、设计项目后,应在合同签订之日起30日内到省建设行政主管部门办理备案书。第八条 省外勘察、设计单位办理项目备案手续需提交省外勘察设计单位进甘承揽勘察设计项目备案申报表及其
24、相关附件。附件包括以下材料:1、省级及以上建设行政主管部门颁发的工程勘察、设计资质证书副本原件及其复印件;2、单位所在省、市、自治区建设行政主管部门出具的介绍信函(或行政处罚记录查询报告);3、建设行业管理信息系统(勘察设计企业版)生成的备案人员名单(系统开通该功能时提供);4、参加备案项目的勘察设计人员中注册人员应提供身份证复印件、注册证书复印件(加盖执业印章)。非注册技术人员应提供职称证、身份证、毕业证、劳动合同的复印件(事业单位的勘察设计人员,可提供其上级人事主管部门的人事证明材料);5、勘察、设计单位所在地工商行政管理部门颁发的企业法人营业执照副本复印件;6、工程建设项目的立项文件 (
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 甘肃省 省外 勘察 设计 单位 承揽 工程 业务 管理 规定

链接地址:https://www.31ppt.com/p-5060503.html