钢筋混凝土挡墙施工方案.doc
《钢筋混凝土挡墙施工方案.doc》由会员分享,可在线阅读,更多相关《钢筋混凝土挡墙施工方案.doc(10页珍藏版)》请在三一办公上搜索。
1、staff, the successful completion of various tasks assigned by the superior, will now work are summarized below. 1 first, honest work, a sound mechanism. Strengthening organization and leadership. To carry out clean government and the anti-corruption work, the Centre attended the regional animal husb
2、andry and veterinary Bureau is honest work leading group, and according to the district, the District Government, the discipline Inspection Commission with regard to the requirements of the clean, practical, involved in the development of the animal husbandry and veterinary Bureau of XX district 201
3、5 construction work and Division of labour programme, clear clean of responsibility, in accordance with the requirements of layers implement work. Second, accountability. Superior level management of global clean government work, the number one responsibility, team accountability, anti-corruption wo
4、rk mechanism requires, animal husbandry and veterinary Bureau and signed a clean government responsibility centre, centers signed with the workers honest responsibility, tasks, responsibilities, broken, for good honest work has laid a solid foundation. 2, prevention first, intensify the supervision
5、and constraint. To do a clean government and anti-corruption work, and effectively prevent and reduce the incidence of crime, Centre for learning method of combining education and focused on exploring the root; one is to carry out the anti-corruption study, build a strong ideological defense line, f
6、urther study and implement the improved style, close ties with the eight provisions of Yunnan province, and six prohibitions. Second, focus on preventing job-related crimes warning education, organize workers to focus on watching the warning education documentaries, organize cadres and workers to XX
7、 prisons involved in the warning education; third, to establish a sound system of internal financial control. Through mechanisms, activities to further promote the de Chang Xiu as Chief of staff, Chang Si greed of victims, often sets the heart into concrete action in the thought really solve the ini
8、tiative to accept supervision and constraint problems, and consciously abide by honesty and self-discipline regulations. 3, seriously carry out three-three education. In the form of concentrated study and group discussion, learning and practicing the three-three primary content. All cadres and worke
9、rs to strengthen party spirit, belief and faith, enhance the moral realm, the pursuit of noble sentiments and consciously stay away from vulgar, and consciously to combat evil. Practical planning and work, the ideas, policies and programmes in line with the actual situation . System management, Syst
10、em Manager, system management mechanism, strengthen the supervision and management of cadres and workers, so as to increase the strength of honest work. Seriously implementation Central Commission for discipline inspection on strictly ban using positions Shang of convenience seek not due interests o
11、f several provides in the of provides; seriously implementation party supervision Ordinance (pilot) and the supporting system in the of provides; a years to no leaders violations received cash, and securities and paid voucher of phenomenon; no occurred eat, and took, and card, and to of phenomenon;
12、no occurred leaders weddings dacaodaban, and participation gambling, and bus private, and bus tourism of situation; seriously implementation payments two article line Provides that no small coffer exist without violating the self-discipline钢筋混凝土挡土墙施工方案一、工程概况本次钢筋混凝土挡土墙设计型式为悬臂式挡土墙和扶壁式挡土墙,当挡土墙的墙身高度在小于4
13、.5m时,采用悬臂式挡土墙,当挡土墙的墙身高度在大于4.5时,采用扶壁式挡土墙,挡土墙的泄水孔水平间距2m,纵向间距3m,挡墙的墙身高度大于3m时设置泄水孔。墙身高度H3.5m时,不设倒角;墙后1:4灰土分层回填夯实,压实度95%(轻型击实),基础3:7灰土压实度95%(重型击实);挡墙沉降缝按纵断面设计分段予留,缝宽2cm,墙背一侧2cm嵌橡胶沥青防水密封膏,余填L-600低发泡聚乙烯沫塑料;挡墙墙背后先喷HUG-3防水材料两遍,待干后再喷HUT-1防水材料两遍。挡墙顶设置防撞护栏及栏杆,施工时应注意防撞护栏预埋钢筋的设置,挡墙施工应严格按涉及放样,确保墙位、标高及强度等符合要求。本标段挡墙
14、为悬臂式挡墙。本标段挡土墙分布如下表序号桩 号位置长度(m)墙高(m)形式备注1K0+260-K0+270OP辅道挡墙101.0悬臂式2K0+270-K0+290OP辅道挡墙201.5悬臂式3K0+290-K0+310OP辅道挡墙202.0悬臂式4K0+310-K0+330OP辅道挡墙202.5悬臂式5K0+330-K0+350OP辅道挡墙203.0悬臂式6K0+350-K0+360OP辅道挡墙103.5悬臂式7K0+360-K0+366.112OP辅道挡墙6.1124.0悬臂式8K0+270-K0+280QR辅道挡墙101.0悬臂式9K0+280-K0+300QR辅道挡墙201.5悬臂式10
15、K0+300-K0+310QR辅道挡墙102.0悬臂式11K0+310-K0+330QR辅道挡墙202.5悬臂式12K0+330-K0+340QR辅道挡墙103.0悬臂式13K0+340-K0+350QR辅道挡墙103.5悬臂式14K0+350-K0+366.112QR辅道挡墙16.1124.0悬臂式二、主要工艺及施工方法1工艺标准挡墙混凝土强度等级采用C30,现场浇筑。其砼的强度要满足设计要求。钢筋采用HRB335。挡墙的外观要求其非应力裂缝不得大于0.2mm,各部分的结构尺寸不得小于设计值,基础埋深不小于1m。挡墙采用两次浇筑,基础和墙身分开浇筑,并预埋好连接钢筋,且连接处混凝土应凿毛,并
16、清洗干净。挡墙的墙身几何尺寸要符合设计要求。挡墙的钢筋保护层厚度要满足设计图纸要求。挡墙内的预留泄水孔横向间距2.0m,其位置允许的偏差为15mm。泄水孔出口宜高于地面30cm,并设3%向外倾斜坡度。挡墙的墙顶标高要满足设计要求,允许偏差为20mm。混凝土灌注完毕后,应按有关规定进行养护。墙背回填应该在挡墙砼的强度达到设计强度的75%才能够进行填土。挡墙混凝土浇注应均质密实、平整,无蜂窝麻面,不漏筋、无缺损、不露筋骨,强度符合设计要求。挡墙模板加固采用拉筋联合钢管扣件双重保证措施,保证混凝土在浇注过程中不发生跑模。施工时挡墙墙高随路线纵坡变化,但基础应保持水平,同时保证外墙面在同一竖直面上。地
17、基承载力满足设计要求120kpa。若达不到设计所要求的地基承载力,应通知监理及设计单位进行地基处理,待达到设计要求方可进行挡土墙施工。挡土墙的墙体达到设计强度的75%以上时,方可进行墙后填料施工。墙后必须回填均匀、摊铺平整,填料顶面横坡符合设计要求。墙后1.0m范围内,不得有大型机械行驶或作业,为防止碰坏墙体,应用小型压实机械碾压,分层厚度不得超过20cm。压实度要求95%。其具体质量指标及实测项目见下页表。2施工方法由项目部测量人员放线,确定挡土墙准确位置及标高,然后进行基坑开挖,开挖宽度根据基础宽度按照1:1放坡确定。并由项目部组织人员进行现场收方。基坑完成后,按基底纵轴线结合横断面放线复
18、验,确认位置、标高无误并经监理确认后,方可进行随时垫层施工。施工时先将3:7灰土垫层夯实整平至设计标高,为钢筋绑扎提供作业面。测量放线确定基础尺寸后,进行钢筋绑扎、立模,同时预埋墙身钢筋和墙肋钢筋。挡墙基础的施工按跳槽施工,几个作业面可同时施工,为挡墙的墙身施工提供较多的作业面。基础施工完成后应立即回填,以小型压实机械进行分层夯实,并在表面预留3%的向外斜坡,防止积水渗入基底。基础钢筋的绑扎要注意钢筋的保护层的厚度,垫块采用和基础同强度的砼垫块,以保证砼的质量。浇筑基础砼,在基础砼施工完成后及时对墙身处的砼凿毛,保证浇筑挡墙的墙身时新浇砼与已浇砼的连接。待基础砼达到设计强度的80%后方可进行墙
19、身施工。首先绑扎墙身钢筋和墙肋钢筋,钢筋安装完成经监理检查合格后,开始关模,并进行沉降缝、接缝及防水处理。施工中特别注意模板的垂直度、平整度及稳定性。施工挡墙墙身时其支架要一同搭建,而墙身的斜支撑不得与支架进行连接,避免在施工中因支架的移动引起模板不稳定。砼的浇筑主要采用泵车进行输送,砼搅拌运输车运送。在浇筑中采用插入式振捣棒进行振捣,不得过振及漏振。砼养护主要是保证砼表面的湿润,防止砼水化反应的各种影响。定期测定砼内部温度、环境温度,控制砼内外温差,防止砼表面产生裂缝。砼强度达到2.5MPa以上,且其表面及棱角不因拆模而受损时,可进行拆模施工,在拆模时不要损坏砼,正面模板主要采用整体移动,在
20、移动过程中注意模板的稳定性、安全性,保证施工安全。3钢筋加工钢筋的表面应洁净,使用前应将表面油渍、漆皮、鳞锈等清除干净。钢筋应平直、无局部弯折、成盘的钢筋和弯曲的钢筋均应调直。钢筋的弯制和末端的弯钩应符合规范和设计要求。用I级钢筋制作箍筋其末端应做弯钩,弯钩的弯曲直径应大于主筋的直径、且不小于箍筋直径的2.5倍,弯钩的平直部分不宜小于箍筋直径的5倍。钢筋焊接采用单面电弧焊,单面电弧焊焊缝的长度不小于10倍钢筋直径。受力钢筋焊接应设在内力较小处,并错开布置。焊接接头在接头长度区段内,同一根钢筋不得有两个接头。配置在接头长度区段内的受力钢筋其接头的截面积应小于总截面积的0.5倍(受拉区),受压区不
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 钢筋混凝土 挡墙 施工 方案
链接地址:https://www.31ppt.com/p-5059261.html