1、permeable rate reduced has 80.16Lu; III sequence hole than II sequence hole of cumulative average permeable rate reduced has 33.07, and curtain check hole pressure water test Lv Rong value are is less than 3.0 Lu (design standard), Maximum value of 2.75 Lu, the minimum value of 0.0 Lu, Lv Rong on av
2、erage value of 1.34 Lu, fully meet the design requirements; 2) left bank curtain Grouting unit: sequence hole maximum value for 66.25Lu, minimum value for 4.82Lu, average for 18.05Lu; II sequence hole maximum value for 94.3Lu, minimum value for 2.29Lu, average for 17.76Lu; analysis sequence, and II
3、sequence curtain irrigation Qian average permeable rate can see: due to formation fractured distribution and to reasons, caused individual II sequence hole in minority long within of permeable rate value larger, led II sequence hole average permeable rate increases, sequence sequence holes and holes
4、 and the average permeability through Grouting treatment, check the permeability of curtain Grouting d unit maximum value is 2.5Lu, the youngest only 0.0 Lu, the mean value is 0.99Lu; after grouting, check the porosity and permeability are less than the curtain on the right bank check for pore water
5、 pressure test of Lv Rong 3.0Lu (design criteria), fully meet the design requirements; From the data presented above the right bank of sequence, sequence holes through the sequence of curtain Grouting in , Grouting effect due to fracture bedrock on the left bank and to, which causes the . Through ab
6、ove permeable rate frequency cumulative graphs, analysis left bank curtain Grouting irrigation Qian permeable rate: in permeable rate relative concentrated of 550 Lu paragraph, sequence hole cumulative frequency for 90.91%, II sequence hole for 91.66%; sequence hole, and II sequence hole in permeabl
7、e rate of cumulative frequency compared close, analysis its reasons for formation in the of fractured, and section acting distribution and the to reasons caused, combined civil excavation revealed of bedrock section acting situation, cumulative frequency close reasons for rock section acting to and
8、curtain Grouting axis almost into 90 angle intersect, As the joint distribution, trends, coupled with the impermeability of the rock, causing liquid coefficient of lateral piercing small, vertical grout is stronger. Although in grouting in horizontal Shang results smaller, but also is difference, fr
9、om figure in the known, in 510 Lu permeable rate paragraph, II sequence hole single paragraph cumulative frequency above sequence hole, and in 1050 Lu permeable rate paragraph, II sequence hole single paragraph cumulative frequency below sequence hole, description sequence hole Grouting construction
10、 although by bedrock section acting role, but still made ideal effect. Comprehensive analysis of the above data: through the sequence of left and right bank of curtain Grouting effect, filling effect, shows the curtain Grouting construction sequence is reasonable. Before the actual construction of i
11、rrigation the largest hole of Lv Rong orderings I ordered are slightly larger, but 南 京 工 程 学 院毕业设计说明书(论文)作 者: 丁 祎 学 号: 209091017 院 系: 经济与管理学院 专 业: 工程管理(工程造价管理方向) 题 目: 京龙电气设备有限责任公司办公楼工程 投标文件商务标编制 指导者: 讲 师 (姓 名) (专业技术职务)评阅者: (姓 名) (专业技术职务) 2014 年 05月 南 京this just means subsequent construction individu
12、al holes permeability of a larger phenomenon. Comprehensive analysis of cumulative frequency curve, permeability distribution as a whole, meets general law of curtain Grouting in permeability of cumulative frequency distribution. According to the above volume frequency cumulative curves analysis of
13、curtain Grouting in the right bank of interval distribution of unit volume, can be seen on the right bank of curtain Grouting injection interval distribution is fully consistent with the general law. Absorption of slurry in smaller 0100 Kg/m, I ordered-hole cumulative frequency of 0% II sequence-hol
14、e cumulative frequency of 0%, sequence hole cumulative frequency of 20% sequence holes , -order hole cumulative frequency 20%. In cumulative frequency relative more concentrated of 1001000Kg/m interval in the, sequence hole interval frequency for 66.67%, II sequence hole interval frequency for 70%,
15、III sequence hole interval frequency for 80%, III sequence hole more , and II sequence hole interval frequency increased has 10%; in sucking pulp volume larger of 1000Kg/m interval in the, sequence hole interval frequency for 33.33%, II sequence hole interval frequency for 30%, III sequence hole int
16、erval frequency for 0%, III sequence hole more , and -order hole interval frequency reduces 30% from grey injection frequency plan of the unit intuitive right bank of curtain Grouting in sequence before the subsequent hole hole injection significantly decreased. Under the above three units into the
17、cumulative frequency graph, analysis of curtain Grouting in left bank units into the interval distribution of can see unit volume range of curtain Grouting in left bank distribution is fully consistent with the general law. In frequency cumulative relative more concentrated sucking pulp volume small
18、er of 0100 Kg/m interval in the, sequence hole cumulative frequency for 25%, II sequence hole cumulative frequency for 47.22%, II sequence hole more sequence hole cumulative frequency increased has 22.22%; in sucking pulp volume larger frequency cumulative relative more concentrated of 1001000Kg/m i
19、nterval in the, sequence hole interval frequency for 70.45%, II sequence hole cumulative frequency for 52.78%, II sequence hole more sequence hole interval frequency reduced has 17.67%. By unit volume interval frequency cumulative data we can see that second hole of sequence I ordered unit volume de
20、creased significantly; intuitive from the cement injection frequency plan of the unit earlier ordered the subsequent hole of curtain Grouting in left bank hole unit volume decreased significantly. Based on the above analysis, it tells you the curtain Grouting construction sequence can be reasonable,
21、 and construction parameters to meet the design requirements, construction plans meet the specifications and quality requirements, and the effect of curtain Grouting. Inspection holes in the left and right bank a check hole core segment of pressurized water, left and right Bank Water permeability of
22、 each paragraph subparagraph Lu value毕业设计说明书(论文)中文摘要本次毕业设计的选题是京龙电气设备有限责任公司办公楼工程投标文件商务标的编制。设计图纸包括土建施工图和结构施工图两部分。本设计是一套框架结构的施工图纸。按照国家颁布的现行规范、规程、标准、规定及本工程图纸、说明,遵循工程量计算规则,而编制出来的一套完整的商务标。在编制商务标过程中,各分部分项工程都严格遵循图纸和工程量清单计价规范(GB50500-2008)对清单工程量进行复核,并查阅了大量相关书籍,根据江苏省建筑与装饰工程计价表(2004)对定额工程量进行计算。最后通过未来软件进行报价,进行一
23、套完整的商务标。对设计结果进行了汇总和分析,根据整个设计过程中的心得,形成了设计说明书。投标报价根据企业定额、类似工程的成本核算资料、及有关的设计说明书、规定等进行编制。贯彻执行了国家及地方有关工程建设的政策和法规,符合国家现行的计价办法和费用标准的规定。由于经验的不足,在细节处理上,还存在着很多缺陷。关键词:工程量清单 综合单价 投标报价 毕业设计说明书(论文)外文摘要Title The commercial offer sign book of the bidding for the project of business office building Jinglong electric
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- cz毕业设计说明书 丁祎 cz 毕业设计 说明书

链接地址:https://www.31ppt.com/p-5034204.html