1、水利水电工程专业毕业设计完整设计图纸请联系本人,参见豆丁备注。目 录摘 要- 3 -ABSTRACT- 4 -第一章 综合说明- 5 -1.1 概述- 5 -1.1.1 枢纽概述- 5 -1.1.2 设计要求- 5 -1.2 工程特性表- 6 -第二章 设计资料- 7 -2.1 枢纽任务- 7 -2.2 基本资料- 7 -2.2.1 自然地理- 7 -2.2.2 工程地质- 9 -2.2.3 筑坝材料- 10 -2.2.4 库区经济及其它- 11 -第三章 枢纽主要建筑物的型式与总体布置- 12 -3.1 工程等级及技术规范设计标准- 12 -3.1.1 工程等级- 12 -3.1.2 技术规
2、范- 12 -3.1.3 洪水标准- 12 -3.2 调洪演算及设计基本数据- 12 -3.2.1 调洪演算的目的- 12 -3.2.2 调洪演算的原理- 12 -3.2.3 计算方法- 14 -3.2.4泄洪方案的选择- 14 -3.3 枢纽组成建筑物- 17 -3.4 坝型选择- 17 -3.4.1 坝型初选- 17 -3.4.2方案比较- 19 -3.4.3 坝体形态选择- 20 -3.5 泄水建筑物型式选择- 20 -3.6 厂房及引水系统布置- 21 -3.7 枢纽总体布置- 21 -第四章 拱坝设计- 21 -4.1拱坝型式及布置- 21 -4.1.1拱坝剖面设计- 21 -4.1
3、.2拱坝的布置- 22 -4.2 荷载及其组合- 23 -4.2.1 荷载及计算- 23 -4.2.2 荷载组合- 28 -4.3 计算原理和计算方法- 28 -4.3.1 计算原理- 28 -4.3.2 计算方法- 29 -4.4 应力与强度分析(电算,手算)- 29 -4.4.1 应力控制指标- 29 -4.4.2 电算- 30 -4.4.3 手算- 31 -4.5 坝肩稳定验算- 33 -4.5.1 验算原理- 33 -4.5.2 验算工况- 36 -4.5.3 验算结果- 36 -第五章 泄水建筑物设计- 36 -5.1 基本资料- 36 -5.2 泄水建筑物组成与布置- 36 -5.
4、3 泄槽设计- 37 -5.3.1 泄槽尺寸- 37 -5.4 消能与防冲- 39 -5.4.1 挑距计算- 39 -5.4.2冲坑计算- 39 -5.4.3防冲评价- 39 -5.4.4 消能率计算- 39 -5.4.5消能防冲计算成果- 40 -5.5泄水孔口应力及配筋- 40 -5.5.1计算原理- 40 -5.5.2孔口作用力- 40 -第六章 坝体细部构造及地基处理- 43 -6.1 坝体构造与细部结构设计- 43 -6.1.1 坝体与坝面- 43 -6.1.2 坝体分缝- 43 -6.1.3 坝内廊道和坝后工作桥- 43 -6.2 坝基处理- 44 -6.2.1 坝基处理的一般要求
5、- 44 -6.2.2 地基的处理和开挖- 44 -6.2.3 坝基排水孔- 46 -结束语- 47 -参考文献- 48 -摘 要A江水利枢纽同时兼有防洪,发电,灌溉,渔业等综合作用,水库正常蓄水位184.0m,设计洪水位186.9m,校核洪水位189.8m,汛前限制水位182m,死水位164m,尾水位103.5m。水库死库容9.3亿m3,总库容12亿m3。A江水利枢纽工程等别为一等,工程规模为大(1)型工程,主要建筑物级别为1级,次要建筑物级别为3级,临时性建筑物级别为4级。A江水利枢纽的主要组成建筑物有挡水建筑物,主副厂房,泄水建筑物,过木筏道等。挡水建筑物是一变圆心变外半径的双曲拱坝,坝
6、顶弧长353.32m,最大坝高100.3m,坝底厚26m,坝顶宽8.5m。泄水建筑物由两个浅孔和两个中孔组成:浅孔位于两岸,孔口宽8.5m,高8m,进口底高程为164m,出口底高程为154m;中孔位于水电站进水口两侧,孔口宽7.4m,高7.4m,进口底高程为135m,出口底高程为130m。在坝身泄水孔的上下游侧分别布置检修闸门和工作闸门,检修闸门采用平板门,工作闸门采用弧形闸门,在每一个工作闸门的上方有启闭机房,浅孔启闭机房高程为170m,中孔启闭机房高程为150m。泄槽支撑结构采用框架式结构。坎顶高程为118m,浅孔反弧半径为35m,中孔反弧半径为50m。泄槽直线段的坡度与孔身底部坡度一致,
7、挑射角=20o,导墙厚度为1m, 浅孔导墙高度为8.5m,中孔导墙高度为12m。坝后式厂房装有4台5万kw的发电机组,主厂房长81m,宽18m,副厂房长66m,宽10m,安装场长21m,宽18m。压力管道的直径为4.5m,进水口底高程为152.3m。发电机层高程为114.8m,尾水管底高程为90.8m,厂房进水口底高程为152.3m。为防止坝基渗漏,在坝基靠近上游侧进行帷幕灌浆,并且为了减少坝基的扬压力,在灌浆帷幕之后设置排水孔。为了防止混凝土产生裂缝,拱坝坝体设置横缝,横缝面上需设置键槽,以咬合加固,增强坝体的抗剪能力。当底宽在4050m以上的拱坝,才考虑设置纵横缝,而本设计中,拱坝坝底宽为
8、26m,小于40m,故可不设置纵缝。Abstract Ajiang hydrocomplex play parts in flood control,water power,irrigation,water conservancy related fisheries,and so on.The reservoir normal water level is 184.0m,design flood level is 186.9m,maximum flood level is 189.8m,flood control level is 182m,dead water level is 164m,a
9、nd tailwater level of hydropower station is 103.5m.The dead reservoir capacity is 930,000,000m3,and the total reservoir capacity is 1,200,000,000 m3. The hydraulic engineering grade is Grade I. The hydroproject is consist of water retaining structure,power house,auxiliary room,sluice structure,raft
10、sluice,and so on. The water retaining structure is a double curvature arch dam.The length of the axis of crest dam is about 353.32m.Maximum height of the dam is 100.3m,the thickness of the bottom of the dam is 26m,and the width of the top of the dam is 8.5m. The release structure is comprised of 2 m
11、id-level outlet and 2 short-level outlet.The width of the mid-level outlet is 7.4m,and the height is 7.4m;the width of the short-level outlet is 8.5m,and the height is8m.The upstream and the downstream side of every outlet are a bulkhead gate and a operating gate which is a radial gate.There is a ro
12、om where a gate hoist is put above every service gate.The two rooms which are above the mid-level outlet service gate are at an elevation of 150 metres,and the other two rooms are at an elevation of 170 metres.The intake of the mid-level outlet is at an elevation of 135 metres,and the intake of the
13、short-level outlet is at an elevation of 164 metres. The type of the power house is at damtoe.The dimensions of the power house and the auxiliary room are 81m18m and 66m10m.The generator floor is at an elevation of 114.8 metres,and the bottom of the draft tube is at an elevation of 90.8 metres,and t
14、he intake of hydropower station is at an elevation of 152.3 metres. In case of leakage of the dam foundation,there is grouting curtain at the base of the dam,behind which there are drainage holes which decrease the uplift pressure of the dam foundation. In radial directions there are transverse join
15、ts in which there are keys,and because the thickness of the bottom of the dam is smaller than 4050 metres,there is no longitudinal joint.第一章 综合说明1.1 概述1.1.1 枢纽概述 A江是我国东南地区的一条河流, 流向自西向东,流经A省南部地区,汇入东海,干流全长153km,流域面积4860平方公里。根椐流域规划拟建一水电站。本设计任务是对A江水利枢纽进行设计。A江水利枢纽是一项同时兼顾防洪,发电,灌溉,渔业等综合作用的水利工程。坝址以上流域面积2761
16、平方公里, 水库正常蓄水位为184.0m,汛前限制水位为182m,死水位为164m,设计水位为186.9m,校核水位为189.8m。 电站多年平均发电量为5.08亿度,正常蓄水位时,水库面积为35.60平方公里,为发展养殖创造了有利条件,同时增加保灌面积50万亩。A江水利枢纽的主要组成建筑物有拦河大坝,坝后式厂房,泄水建筑物,过木筏道,开关站以及上坝公路等。拦河大坝为双曲拱坝,最大坝高为100.3m,主体工程量约为34.1万方左右,坝顶宽8.5m,坝顶长约353.32 m,坝底宽26m。坝后式厂房装有4台5万kw的发电机组,主厂房长81m,宽18m,副厂房长66m,宽10m,安装场长21m,宽
17、18m。压力管道的直径为4.5m,进水口底高程为152.3m。泄水建筑物采用两个浅孔和两个中孔相结合的方案:浅孔位于两岸,孔口宽8.5m,高8m,进口底高程为164m,出口底高程为154m;中孔位于水电站进水口两侧,孔口宽7.4m,高7.4m,进口底高程为135m,出口底高程为130m。泄槽支撑结构采用框架式结构。坎顶高程为118m,浅孔反弧半径为35m,中孔反弧半径为50m。泄槽直线段的坡度与孔身底部坡度一致,挑射角=20o,导墙厚度为1m, 浅孔导墙高度为8.5m,中孔导墙高度为12.0m。过木筏道位于右岸。根据林业部的要求,每年木材过坝量为33.3万立方米,其木材最大长度为10m,大头直
18、径为100cm。开关站长20m,宽75m,位于左岸。1.1.2 设计要求在明确设计任务及对原始资料进行综合分析的基础上,要求:1.根据防洪要求,对水库进行洪水调节计算,确定坝顶的高程和泄水建筑物孔口尺寸。2.通过分析,对可能的方案进行比较,确定枢纽组成建筑物的形式,轮廓尺寸及水利枢纽布置方案。3.详细做出大坝设计,并通过比较确定坝的基本剖面和轮廓尺寸,拟定地基处理方案和坝身构造,进行水利计算、静力计算。4.对泄水建筑物进行设计,选择泄水建筑物的形式与轮廓尺寸,确定布置方案,拟订细部构造,进行水利计算、静力计算。5.对A江水利枢纽各组成建筑物进行总体布置以及细部构造设计。1.2 工程特性表表1-
19、1 工程特性表水 库 特 性水库水位死水位高程164.00米汛前限制水位高程182.00米正常蓄水位高程184.00米设计洪水位高程186.90米校核洪水位高程189.80米主要建筑物大坝资料大坝级别级大坝型式变半径变中心角双曲拱坝坝顶高程192.3米坝底高程 92.0米最大坝高 100.3米坝顶弦长306米坝顶厚度 8.5米坝底厚度 26.0米混凝土方量341000立方米泄水建筑物泄洪方式/孔口尺寸进口高程出口高程两浅孔8.58.0164.0m154.0m两中孔7.47.4m2135.0m130.0m闸门形式检修闸门平板闸门,设在进口处工作闸门弧形闸门,设在出口处消能方式滑雪道式泄槽挑流对撞
20、消能P=1下泄流量6520m3/sP=0.2下泄流量7000m3/s厂房最大引用流量338 m3/s装机容量45.0万千瓦引水道型式钢管数量4条内径4.5米第二章 设计资料A江是我国东南地区的一条河流,根据流域规划拟建一水电站。本设计的任务是对A江水利枢纽进行设计,其基本设计要求如下。2.1 枢纽任务本工程同时兼有防洪,发电,灌溉,渔业等综合利用。水电站装机容量为20 万kW,多年平均发电量5.08亿度。正常蓄水位184.0m,汛前限制水位182m,死水位164m,4台机满载时的流量338m3/s,尾水位103.5m,厂房形式为坝后式。本工程建成后,可增加保灌面积50万亩,减轻洪水对A江A市和
21、A平原的威胁,在遇到P=0.02%和P=0.1%频率的洪水时,经水库调洪后,洪峰流量由原来的14900m3/s、11700m3/s分别削减为7550m3/s、6550m3/s,要求设计洪水时最大下泄流量限制为6550m3/s,正常蓄水位时,水库面积为35.60平方公里,可为发展养殖创造有利条件。此外,根据林业部的要求,每年木材过坝量为33.3万立方米,其木材最大长度为10m,大头直径为100cm。2.2 基本资料2.2.1 自然地理2.2.1.1 流域概况 A江是我国东南部的一条河流,流向自西向东,流经A省南部地区,汇入东海,干流全长153km,流域面积4860平方公里。坝址以上流域面积276
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- A江水利枢纽复杂地基上双曲拱坝设计 说明书 江水 枢纽 复杂 地基 上双曲 拱坝 设计
链接地址:https://www.31ppt.com/p-5026867.html