96米跨钢桁梁施工组织设计方案.doc
《96米跨钢桁梁施工组织设计方案.doc》由会员分享,可在线阅读,更多相关《96米跨钢桁梁施工组织设计方案.doc(164页珍藏版)》请在三一办公上搜索。
1、目 录1、编制依据、编制范围及工程概况11.1编制依据11.2编制范围21.3工程概况22、设计概况42.1主要控制因素42.2主要技术标准42.3钢桁梁结构形式42.3.1结构形式42.3.2主体结构52.4重点(关键)和难点63、建设项目所在地特征63.1地质情况63.2水文地质条件73.3地震动参数73.4交通运输情况84、施工组织安排84.1建设总体目标84.2施工组织机构84.3总体施工安排原则和主要阶段工期94.3.1总体施工安排原则94.3.2主要阶段工期104.4施工准备和建设协调方案104.4.1施工准备104.4.2施工协调方案115、临时工程115.1 驻地建设115.2
2、 施工便道115.3 施工用水115.4 施工用电115.5 钢梁施工场115.6 钢桁梁膺架系统126、重难点工程施工方案127、施工方案127.1施工准备127.1.1技术准备127.1.2现场准备137.2总体施工方案137.3钢桁梁拼装施工方法137.3.1钢桁梁的制作137.3.2钢梁杆件进场、预拼147.3.3钢梁杆件预拼177.3.4钢梁杆件拼装187.3.5钢梁拼装预拱度设置247.3.6栓合247.3.7高强度螺栓施拧及检查257.3.8支座安装297.3.9桥面系及附属工程施工307.3.10工地涂装317.4临时支架347.4.1拼梁场地的选择347.4.2临时支架钢管桩
3、基础347.4.3临时支架桩顶膺架357.4.4横移滑道支墩367.4.5滑道支墩沉降控制措施397.4.6钢管桩的制作和连接397.4.7临时支架钢管桩施工注意事项397.5栈桥结构设计417.5.1计算荷载和施工工况427.5.2栈桥钢管桩入土深度计算437.6钢梁横移437.7临时支架拆除477.7.1支架拆除原则477.7.2支架拆除顺序477.7.3支架拆除方法477.7.4支架拆除安全事项488、资源配置方案488.1主要工程材料表488.2施工装备的数量表498.3劳动力计划528.2.1施工劳动力组织安排528.2.2、劳力配置528.3临时施工用电方案528.3.1临时用电管
4、理528.3.2临时用电设备统计538.3.3施工用电线路的防护措施538.3.4安全措施548.3.5现场照明549、管理措施549.1标准化管理549.1.1组织领导549.1.2标准化管理559.2质量管理措施569.2.1组织管理机构569.2.2质量保证体系579.2.3质量管理制度589.2.4质量控制标准649.2.5质量保证措施679.3安全管理措施719.3.1安全控制要点719.3.2主要工序的易发事故及技术保障措施729.3.3营业线施工安全措施789.3.4防设备及车辆侵限安全措施799.3.5大型设备防倾覆预防措施809.3.6吊装安全措施819.3.7施工防护安全措
5、施819.3.8各种用电设备的安全措施829.3.9机械设备安全管理措施839.3.10用电安全保障措施839.3.11临近既有线设备防倒塌措施839.3.12行车防护方法849.3.13高空作业安全措施849.4工期管理措施859.4.1工期保证体系869.4.2组织措施879.4.3计划措施879.4.4经济措施879.4.5工作机制889.4.6特殊季节的保证工期措施889.5环境保护措施899.5.1减少噪声、废气污染899.5.2施工现场的环境保护909.6水土保持措施909.6.1防水排水909.6.2防止冲刷与淤积909.6.3保护水质909.6.4挖、弃方处理919.7文明施工
6、措施919.7.1妥善处理与当地关系919.7.2施工现场管理929.7.3施工现场的料具管理929.7.4施工现场的环境卫生929.8雨季施工措施939.9机械设备验收管理制度9410.应急预案9510.1总 则9510.1.1编制目的9510.1.2编制依据9510.1.3工作原则9610.2组织指挥体系及其职责9610.2.1应急预案体系9610.2.2应急组织体系9610.2.3应急领导指挥机构9610.3 事故报告程序、方式、内容9810.3.1事故上报程序9810.3.2事故上报方式9910.3.4事故救援组织9910.3.5事故救援原则9910.3.6救援设备、物资9910.3.
7、7应急措施10010.4应急队伍10610.5保障措施10610.6事故调查10610.7物资准备10710.8 报警方法和指挥通讯10710.9纪律要求10710.10事故发生时应急工作流程10711附表10811.1各有关单位联系人联系号码表10811.2 检算资料10911.3 附图109支座位置平面图109大明河钢桁梁平面示意图109膺架法钢桁梁拼装架设图109钢桁梁架设结构与既有线位置关系图109岸上滑道支墩结构图(一)109岸上滑道支墩结构图(二)109岸上滑道支墩结构图(三)109岸上滑道支墩结构图(四)109their own conditions to develop the
8、 correct road, the maximum to avoid investment risk, gain profit.(three) vigorously promote the brand. To establish brand awareness, awareness of the use of brand, brand value, brand acquisition performance, enhance the competitive strength. Concentrated manpower, careful planning, packaging and pub
9、licity of a number of unique, market influence and coverage of the brand, the implementation of key breakthroughs, to enhance the competitive strength, walking business road the competition of alienation and characteristics, the pursuit of stability and development of the market.(four) to promote th
10、e integration of resources. To further broaden their horizons, effective integration of resources within the group, the city resources, other industries and regional resources, mutual trust, mutual benefit, seeking win-win principle, in the framework of national policies and regulations, strict insp
11、ection and argumentation, legal consultation, examination and approval procedures, strict regulation of economic activities, attract injection the social investment to the industry group, to achieve leveraging the development, ensure that the value of state-owned assets.(five) to strengthen the cons
12、truction management personnel. Strengthen the management of education and training of cadres and workers of the existing business, firmly establish the concept of the market, enhance the sense of crisis to adapt to market competition, the sense of urgency, improve the ability to respond to market co
13、mpetition, improve management and operation of the market. At the same time, according to the need of industrial development, vigorously the introduction of high-quality management management personnel, and strive to build a high-quality professional management team, hard work, and promote the entir
14、e workforce knowledge structure, age structure, structure optimization and upgrading ability, enhance core competitiveness, adapt to the need of market competition.(six) seriously study the policy for policy. Serious research about social support the development of cultural undertakings in the count
15、ry and the XX policy, especially the policy of industrial development, financial investment policy, financial policy and tax policy, and actively seek policy, projects and funds, enterprise and industry group mission to promote leapfrog development.第 7 页 共4页大明河特大桥1-96m双线有砟钢梁横移法拼装架设施工方案1、编制依据、编制范围及工程
16、概况1.1编制依据1)大明河大桥施工图纸。 双线有砟桥面96m简支下承式钢桁梁施工图。球形钢支座安装图(钢梁) 2)铁道部第32号铁路交通事故应急救援规则等有关规定3)现场勘察及自行调查工地周边环境条件获得的资料。4)施工单位现有机械设备情况、施工技术与管理水平以及多年来工程实践中积累的施工及管理经验。5)铁道部、上海铁路局发布的相关文件。上铁院宁启复线电化工程设计文件及交底资料;上铁运发2012206号关于重新公布上海铁路局营业线施工安全管理实施细则的通知;(上铁运函2009409号)关于进一步加强施工安全管理的通知;上铁运发2010161号上海铁路局营业线施工安全管理补充实施细则;路局最新
17、营业线施工安全管理实施细则(上铁运发2012年206号)建工函2009260号大型机械临近营业线施工管理规定;上铁工发2009111号关于印发上海铁路局营业线施工限速地点防护接车实施办法的通知;铁路工务安全规则;铁道部、上海铁路局下发其他关于营运线施工管理文件;6)规范及标准:铁路桥涵设计基本规范(TB10002.1-2005)铁路桥梁钢结构设计规范(TB10002.5-2005)新建时速200公里客货共线铁路设计暂行规定(铁建设函2005285号)铁路钢桥制造规范(TB10212-2009)铁路钢桥保护涂装(TB/T1527-2004)钢结构用高强度大六角头螺栓、大六角螺母、垫圈及连接副技术
18、条件(GB/T1231-2006)铁路混凝土工程施工质量验收标准(TB10424-2010,J1155-2011)客货共线铁路桥涵工程施工技术指南(TZ203-2008)铁路桥涵工程施工质量验收标准(TB10415-2003,J286-2004)铁路桥涵工程施工安全技术规程(TB10303-2009,J946-2009)铁路钢桥保护涂装(TB/T1527-204)建筑施工高处作业安全技术规范(JGJ 80-1991)施工现场临时用电安全技术规范(JGJ 46-2005)铁路工程基本作业施工安全技术规程(TB10301-2009)铁路桥涵工程施工安全技术规程(TB10303-2009)1.2编制
19、范围大明河特大桥1-96m钢桁梁拼装及架设施工,(不含下部结构),施工范围自35#墩DK226+907.75至36#墩DK227+006.55,全长98.8m。1.3工程概况DK226+650.325大明河特大桥跨度为:(4-32+1-24+7-32+1-24+2-32+1-24+5-32+14-32)m预制后张法预应力混凝土T梁+1-96m钢桁梁+(11-32+2-24+3-32)m预制后张法预应力混凝土T梁,全长1738.94m,采用双线预应力简支T梁和钢桁梁的组合方式。本桥主要为宁启复线跨越大明河规划航道段而设。在DK226+957.65处大明河航道斜交,本桥在此处按采用1-96m有砟钢
20、桁梁跨越,航道与铁路线夹角为25,规划航道净高7.5m,最高水位3.2m,最低水位1.4m,规划航道宽70m。大明河1-96米钢桁梁位于#,跨越大明河,为改建铁路宁启铁路复线电气化改造工程,新线中心和既有线中心之间距离为17.2米。钢梁桁架主体部分重量1400吨,钢梁小件重量约(含支座、人行道桥面、检查设备)41.3吨,钢梁全重约1500吨。钢梁全长为98.5米,计算跨度为96米,主桁上、下弦中心线高度为13.6米,节间长度为9.6米,主桁中心距为11.8米。上下弦杆件均为箱型截面,最大杆件为下弦E4节点重量为20.19吨。现阶段大明河特大桥35#、36#主墩及普通墩台均已全部完成,满足1-9
21、6m双线钢桁梁拼装架设施工需要。既有大明河中桥35#主墩36#主墩35#墩、36#墩现场照片1.4方案选定1.4.1现场条件。经前期调查,大明河水位在1.9m-1.4m水位较浅,河道宽度为20.4m,桥位处河道较窄,若使用浮托等方法均不可行。1.4.2 与既有线关系。大明河特大桥1-96m钢桁梁为双线桥,设计桥梁中心距既有宁启线(单线)中心为17.2m,钢桁梁边缘距既有线路中心10.86m,距既有线较近,若采用高位直接拼装的方法时,对既有线影响较大且时间较长,施工营业线施工手续办理繁琐。根据以上条件考虑,大明河1-96m钢桁梁拼装架设,采用先在桥位外侧搭设膺架拼装钢桁梁,再横移钢桁梁就位的施工
22、方案进行拼装架设。根据宁启复线电化工程建设指挥部安全风险等级、质量风险等级管理办法,结合宁启复线电化工程的实际情况,根据施工项目对营业线造成影响的程度和施工项目质量控制的难易程度,将本工程安全风险等级定为一级,质量风险等级定为一级,进行管理;2、设计概况2.1主要控制因素全桥跨越航道为桥跨设置的主控因素,具体见下表1。 大明河跨越河流航道情况-表1序号河流中心里程跨越河名设计水位通航水位通航等级通航净空交叉夹角设计采用孔跨1DK226+650.325大明河3.873.2707.5m2596m有砟钢梁2.2主要技术标准本桥平面位于直线上,立面位于平坡上,桥上为双线有砟轨道,线间距为4.4m,设计
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 96 米跨钢桁梁 施工组织设计 方案

链接地址:https://www.31ppt.com/p-5022671.html