1、1, and prepared according to 1.1, and thermal power engineering started debugging work provides 1.2, and thermal power power plant construction engineering started and the completed acceptance procedures 1.3, and thermal power unit started steam Blowpipe guide is 1.4, and thermal power engineering a
2、djustment try shipped quality test and the evaluation standard 2, and #1 furnace started debugging organization measures and the related provides 2.1, and organization Division: for guarantee wide up thermal power plant #1 furnace started debugging and the part steam machine system of smooth voted s
3、hipped, special established #1 furnace try shipped professional group, members following: leader: Deputy Leader: supervision: crew: wide up try shipped personnel: wide up acceptance personnel: 2.2, and debugging, and try shipped content: boiler auxiliary machine Division debugging electric dust of D
4、ivision try turned and the debugging baking furnace Cook furnace boiler rushed tube, and blow sweep security door check 2.3, and operation provides and the Division: #1 furnace debugging, and try shipped by #1 furnace try shipped professional group requirements for, which single try turned and Divis
5、ion try shipped by xD three company led is responsible for. all moving operation operation must be in strict accordance with the prior authorization of the #1 boiler commissioning professional working group, and after starting, the test command-approved #1 furnace steps in the test programme, event
6、of temporary changes be reported to headquarters approval. commissioning, trial operation process is required for each project by Northwest electric power construction company ready equipment installation records, and fill in the test application form, the a and b sides after passing the checks, fil
7、l in partial commissioning checking before a visa, reported head of the approval, carried out by the leader of unified command. About each action are made by the leader of a unified command, operation after the report to the team leader. Without the Directors consent shall not unilaterally make any
8、startup operation, such as single operations, who is responsible for all security responsibilities, with no ties to the other side. all before the first turn of the motor, must be approved by both parties a common roll insulation measurement can be carried out properly. After the end of each project
9、 commissioning, fill in partial acceptance visa trial shipments. As motor in rotating equipment commissioning test switch and mechanical part of their trial cannot continuously, this is considered two test projects shall be carried out according to the above four steps. 2.4, and attached work votes
10、issued people, and license people, and work head list: party electrical first species, and second species work votes license people list: party engine work votes license people list: b electrical first species, and second species work votes issued people: b hot control professional issued people lis
11、t: b hot control professional work head: b steam machine professional work votes issued people: b steam machine professional work votes head: b boiler professional work votes issued people: b boiler professional work votes head: attached: about personnel of contact phone party b Division 3, boiler a
12、uxiliary equipment debugging scenarios 3.1, send, induced draft fan try turned 3.1.1, try turning the former requirements of: 3.1.1.1, fan body and motor installed, based the second Grouting ends, and the concrete strength is up. 3.1.1.2, coupling the Centre has finished aligning standards, approved
13、 visa. 3.1.1.3, bearing clearance normal outer rims and bearing clearance is up to standard. 3.1.1.4, Benton 表C12施 工 日 志工程名称林都玉苑小区17#住宅楼施工单位朔州市中宇建安工程有限公司分部(项)工程工程定位放线施工班组壮工日期2013年9月15日星期星期日全 天 气 象气 温施工部位地面出勤数3晴白 天夜 间当日施工内容质量检查情况操作负责质检员工程定位放线合格王亮文李金存在问题及处理办法无设计变更、技术交底隐蔽工程验收部位材料使用情况材料设备进场情况材料设备进场情况材料检
14、验、试块留置工序交接检查情况正常安全正常其他专业施工工长赵健美 编号:表C12施 工 日 志工程名称林都玉苑小区17#住宅楼施工单位朔州市中宇建安工程有限公司分部(项)工程地基与基础施工班组日期2013年9月16日星期星期一全 天 气 象气 温施工部位出勤数中雨白 天夜 间当日施工内容质量检查情况操作负责质检员下雨停工存在问题及处理办法无设计变更、技术交底隐蔽工程验收部位材料使用情况材料设备进场情况材料设备进场情况材料检验、试块留置工序交接检查情况安全正常其他专业施工工长赵健美 编号:表C12施 工 日 志工程名称林都玉苑小区17#住宅楼施工单位朔州市中宇建安工程有限公司分部(项)工程地基与基
15、础施工班组壮工日期2013年9月17日星期星期二全 天 气 象气 温施工部位基槽出勤数7晴白 天夜 间当日施工内容质量检查情况操作负责质检员基槽开挖合格刘建志李金存在问题及处理办法无设计变更、技术交底隐蔽工程验收部位材料使用情况材料设备进场情况材料设备进场情况材料检验、试块留置去开挖的原土样进行土工击实试验工序交接检查情况正常安全正常其他专业施工工长赵健美 编号:表C12施 工 日 志工程名称林都玉苑小区17#住宅楼施工单位朔州市中宇建安工程有限公司分部(项)工程地基与基础施工班组壮工日期2013年9月18日星期星期三全 天 气 象气 温施工部位基槽出勤数5多云白 天夜 间当日施工内容质量检查
16、情况操作负责质检员基槽开挖合格刘建志李金存在问题及处理办法无设计变更、技术交底隐蔽工程验收部位材料使用情况材料设备进场情况材料设备进场情况材料检验、试块留置工序交接检查情况正常安全正常其他专业施工工长赵健美 编号:表C12施 工 日 志工程名称林都玉苑小区17#住宅楼施工单位朔州市中宇建安工程有限公司分部(项)工程地基与基础施工班组壮工日期2013年9月19日星期星期四全 天 气 象气 温施工部位基槽出勤数5晴白 天夜 间当日施工内容质量检查情况操作负责质检员进行钎探并做好钎探记录合格刘建志李金存在问题及处理办法无设计变更、技术交底隐蔽工程验收部位材料使用情况材料设备进场情况材料设备进场情况材
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- f17 住宅楼施工日志 住宅楼 施工 日志
链接地址:https://www.31ppt.com/p-4997984.html