153748剪力墙结构(高层住宅)施工组织设计.doc
《153748剪力墙结构(高层住宅)施工组织设计.doc》由会员分享,可在线阅读,更多相关《153748剪力墙结构(高层住宅)施工组织设计.doc(157页珍藏版)》请在三一办公上搜索。
1、deployment requirements, vigorously strengthen the partys ideological and political construction, strong regulation four winds , the ideological and political quality of party members and cadres has a new improved. But also to see, some members cadres belief not really letter, and slim not really re
2、pair, not understand Marx doctrine principle, not learning party of innovation theory, not believes in party of political advocates; some members cadres party of consciousness and members consciousness desalination, in party not statements party, and not love party, and not nursing party, and not fo
3、r party; some members cadres political discipline, and political rules relaxation, mouth no shoot, mess assessment jump on the party of policies and so on. Solve the problem of party members and cadres ideologically, must start with the ideological and political construction, through the two learnin
4、g education into ideological and political work in day-to-day political life of the party, do fine catch, catch, catch a long, continuous force for a long time to work. 3. two education is condensed power development needs. With the deepening of reform and the full implementation of the rule of law,
5、 we are building Qiang Fu MGM an important task of the new XXX, which we need to rally the wisdom in all aspects, form a partnership to promote the development of a strong force. So, grass-roots party and general members to deep awareness two learn a do learning education of important meaning, effec
6、tive activated grass-roots party fighting fortress role, full play members pioneer model role, in full district development strategy practice in the dang good vanguard, and led bar-headed geese, build a support has iron general belief, and iron general faith, and iron general discipline, and iron Ge
7、neral play of members cadres team, for full district work provides strong political, and thought and organization based. 4. two learning education is to enhance the ability of party members and cadres needed. The current, complex and volatile state of the world of the party, our party is facing unpr
8、ecedented difficulties and challenges since the ruling, but also shoulders an important responsibility of politics, society, history, more urgent goal of realizing the great rejuvenation of the Chinese nation. Specific to our personal, minority party members love to party, party, party, retaining th
9、e consciousness of the party still needs to be strengthened to work and conscientiousness, initiatives still need to be enhanced, capacity level needs to be further enhanced. Our party . Create two learn a do learning education of strong atmosphere on how carried out two learn a do learning educatio
10、n, central programme and also issued has learning education programme, Central Organization Department issued has learning education of programme, province, and municipal issued has implementation programme, for all members and at level above leaders of learning education, respectively proposed has
11、different requirements, district also specifically developed has 1+2+4+1 of implementation programme, respectively clear has learning of main content, and Focus on ways and means of solving problems and learning. We want to seriously implement the Central and provincial, city and district of deploym
12、ent requirements, as more strict and more practical spirit grasp this work. Innovative ways of learning, and earnestly study and understand. To always put learn Constitution Party rules, and learn series speech as two learn a do learning education of heavy in the of heavy,剪力墙结构(高层住宅)编制日期:2011年4月27日编
13、制单位:目录第一卷 编制依据6第二卷 工程概况8第一章 2.1工程简介:8第二章 2.2建筑设计概况:8第三章 2.3结构设计概况:9第四章 2.4水暖专业设计概况:9第五章 2.5电气专业设计概况:10第三卷 本工程施工重点、难点和对策12第一章 3.1施工重点、难点:12第二章 3.2施工重点、难点对策:12第四卷 施工部署17第一章 4.1工程目标:17第二章 4.2管理组织机构:18第三章 4.3施工部署:21第四章 4.4施工准备工作:23第五章 4.5施工现场平面布置:24第五卷 主要分部分项工程、施工技术方案31第一章 5.1施工测量:31第一节 5.1.1工程概况:31第二节
14、5.1.2施工测量的准备工作:31第三节 5.1.3建筑物定位放线:31第四节 5.1.4基础开挖放线:33第五节 5.1.5结构施工测量:33第六节 5.1.6装修工程施工测量:35第七节 5.1.7电梯安装施工测量:36第八节 5.1.8沉降观测:37第二章 5.2土方开挖38第一节 5.2.1工程概况:38第二节 5.2.2施工准备:38第三节 5.2.3开挖方案:39第三章 5.3钢筋工程:41第一节 5.3.1钢筋41第二节 5.3.2钢筋接头、钢筋锚固、搭接长度:41第三节 5.3.3基础钢筋绑扎:42第四节 5.3.4地下室墙体钢筋的绑扎:45第五节 5.3.5顶板钢筋绑扎46第
15、六节 5.3.6 地下室柱子钢筋绑扎47第七节 5.3.7主体钢筋的绑扎48第八节 5.3.8钢筋保护层的要求:51第九节 5.3.9质量要求:51第四章 5.4模板工程:52第一节 5.4.1模板体系52第二节 5.4.2支、拆模工艺流程:55第三节 5.4.3支模质量要求:56第四节 5.4.4技术措施:57第五节 5.4.5模板拆除:57第五章 5.5混凝土工程:58第一节 5.5.1底板混凝土:58第二节 5.5.2剪力墙混凝土施工:60第三节 5.5.3楼板混凝土施工:61第四节 5.5.4施工缝的留置要求:61第五节 5.5.5混凝土试块的留置62第六节 5.5.6质量验收标准;6
16、2第六章 5.6防水工程:63第一节 5.6.1防水概况:63第二节 5.6.2施工要求:64第三节 5.6.3地下室防水:64第四节 5.6.4屋面防水施工:65第五节 5.6.5室内有防水要求的部位防水施工:66第七章 5.7土方回填:67第八章 5.8脚手架工程:68第一节 5.8.1双排脚手架的构造:68第二节 5.8.2外脚手架的验算:69第三节 5.8.3满堂红脚手架:73第九章 5.9砌筑工程73第一节 5.9.1施工准备:74第二节 5.9.2施工工艺:74第三节 5.9.3 GRC隔墙安装:75第十章 5.10楼地面工程:77第一节 5.10.1地砖楼(地)面:77第二节 5
17、.10.2水泥地面:78第三节 5.10.3细石混凝土地面:78第十一章 5.11外装修工程:79第一节 5.11.1外墙面砖:79第二节 5.11.2 干挂花岗岩81第十二章 5.12 内装修工程:82第一节 5.12.1内隔墙抹灰:82第二节 5.12.2 墙顶刮腻子及涂料粉刷:83第十三章 5.13门窗工程:84第一节 5.13.1塑钢窗:85第二节 5.13.2防火门安装:85第十四章 5.14电气工程:86第一节 5.14.1施工依据:86第二节 5.14.2电气工程施工范围:87第三节 5.14.3电源引入及配电系统:87第四节 5.14.4穿墙套管的做法如下:88第五节 5.14
18、.5钢管敷设:89第六节 5.14.6管内穿线:91第七节 5.14.7桥架安装:92第八节 5.14.8电缆敷设:93第九节 5.14.9配电箱(柜)安装:93第十节 5.14.10开关、插座安装:94第十一节 5.14.11防雷接地及保护接地系统:95第十二节 5.14.12灯具安装:97第十三节 5.14.13消防系统:98第十四节 5.14.14智能布线系统:98第十五章 5.15暖卫、通风工程:99第一节 5.15.1工程基本概况99第二节 5.15.2劳动力配备:100第三节 5.15.3施工方法:100第四节 5.15.4基本操作方法:100第五节 5.15.5施工技术措施:10
19、4第六节 5.15.6施工要点:110第六卷 施工进度计划114第一章 6.1总工期控制114第二章 6.2主要分部工程工期安排114第七卷 工期保证措施115第一章 7.1工期目标:115第二章 7.2工期保证措施:115第八卷 季节施工措施118第一章 8.1雨期施工措施118第二章 8.2冬季施工118第一节 8.2.1混凝土工程:118第二节 8.2.2装修工程:119第三节 8.2.3水暖工程:119第九卷 9.主要材料用量计划121第十卷 主要机具设备配备122第一章 10.1设备配置说明122第二章 10.2本工程所采用的主要机械设备表122第三章 10.3拟投入本工程的试验和检
20、测、测量仪器设备表:123第十一卷123第十二卷 质量保证措施125第一章 11.1质量目标:125第二章 11.2质量保证体系125第三章 11.3组织保证措施125第四章 11.4质量管理制度126第一节 11.4.1技术交底制度126第二节 11.4.2工序交接检制度126第三节 11.4.3隐蔽工程签证检查制度127第四节 11.4.4施工测量复核制度127第五节 11.4.5施工过程的质量三检制127第六节 11.4.6严格执行材料半成品、成品采购及验收制度127第七节 11.4.7仪器设备的标定制度128第八节 11.4.8质量奖惩制度128第九节 11.4.9坚持持证上岗制度12
21、8第十节 11.4.10实行质量否决制度128第十一节 11.4.11认真执行“样板制”,129第十二节 11.4.12做好施工中的协作配合工作129第五章 11.5技术保证措施129第一节 11.5.1技术资料管理:129第二节 11.5.2工程测量130第三节 11.5.3钢筋工程130第四节 11.5.4模板工程:131第五节 11.5.5混凝土工程:132第六节 11.5.6防水工程:134第七节 11.5.7暖卫工程:135第八节 11.5.8电气工程:136第六章 11.6运用新技术、新工艺,确保工程质量136第七章 11.7加强对分包队伍的管理及质量控制138第十三卷 安全技术措
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 153748 剪力 结构 高层住宅 施工组织设计
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4983999.html