余姚市二期围区湖北块造地工程施工组织设计.doc
《余姚市二期围区湖北块造地工程施工组织设计.doc》由会员分享,可在线阅读,更多相关《余姚市二期围区湖北块造地工程施工组织设计.doc(108页珍藏版)》请在三一办公上搜索。
1、ZHEJIANG WATER CONSERVANCY AND HYDROPOWER COLLEGE毕业设计(论文)题 目:余姚市二期围区湖北块造地工程施工组织设计系(部): 水利工程系 专业班级: 水工09-3 姓 名: 执念 学 号: 200901137 指导教师: 周建芬 2012年5月28日the Department during a visit to the camp, a few shells of explosions were heard in the distance. Back to Headquarters, Zhu Xi staff was informed by th
2、e Department to strengthen alert, watch, place to rest, for night operations. Near 9 oclock, attack the elves have on the formation of Zhong Jia DUN encirclement. Southeast corner of sudden intense machine gunfire were heard, energize sent a platoon of Shao and attacked the enemy, fighting more hotl
3、y, gunfire was tight for a while. Troops were the shock seemed a bit out the chain of command. Offensive Zhong Jia DUN elves, planes covered in the air, river patrol boats, with the, to heavily guard the way to the village of only access-a stone bridge and a path. Under heavy fire against the enemy
4、troops has been disrupted, Zhu Xi himself Despite repeated organizing death squads under the, but terrain unfavorable, enemy fire is too strong, paid a very high casualties and tremendous power again, and finally failed. Second head of mission and Deputy Commander Wang Hesong remnants kill one and f
5、ive Fan Chunsheng, head of rates of Hades and survive. Qiu Acai Commander Zhu Xi in local farmers risking death save, Ling bin to swim across the river and escaped alone, Yuhang is in court the headquarters report of Jiangsu Zhong Jia DUN bloody situation. Zhu Xi organized forces to break through at
6、 the same time, Wen Yongzhi instructed to rate the Department staff retreat. But under the enemys army arrives, this tiny place where withdrawal? yellow around the rice fields, and everywhere is the devil, mulberry has nowhere to hide in the Woods in the fall. In desperation, temperature a few peopl
7、e from the Department to the local people, and House of a rich family. Officer Xie Chengji, see the living room hangs a plaque, after hiding105浙江水利水电专科学校毕业论文(设计)摘要施工技术是建筑施工中的一项重要组成部分,是工程建设及施工过程的必备条件。建筑施工员就是专门管理建筑工程技术施工的技术人员,施工员的工作其实是一项贯穿整个建筑物从开始施工到竣工验收的工作。通过2012年进入浙江江南春建设集团有限公司承包的余姚市二期围区湖北块造地工程参加实践活
8、动,作为一名施工员的身份参与工程施工管理实践。在技术人员的指导下,通过现场施工的实践锻炼和学习,参与工程实践的基础上,通过收集和查阅相关数据,根据工程实际特点编写相应的施工组织设计。施工组织设计是根据国家或业主对拟建工程的要求、设计图纸和编制施工组织设计的基本原则,从拟建工程施工全过程的人力、物力和空间等三个要素着手,在人力与物力、主体与辅助、生产与储存、专业与协作、使用与维修和空间布置与时间排列等方面进行科学地、合理地部署,为建筑产品的节奏性、均衡性和连续性提供最优方案,从而以最少的资源消耗取得最大的经济效果,使最终建筑产品的生产在时间上达到速度快和工期短,在质量上达到精度高和功能好,在经济
9、上达到消耗少、成本低和利润高的目的。关键词:实践;组织设计;最优AbstractTechnology of construction is the construction of an important part of engineering construction and construction process, is the essential condition. Building construction is a specialized management of building engineering construction technology, constructio
10、n work is in fact a throughout the building from the beginning of construction to completion and acceptance of work.As a member of the construction status of participation in the project construction management practice. Under the guidance of technical staff, through on-site construction practice an
11、d study, to participate in the project on the basis of practice, through the collection and access to relevant information, according to the actual characteristics of the preparation of the corresponding construction organization design.Construction organization design is according to the national o
12、r the owners of the project requirements, design drawings and construction organization design basic principle, from the entire process of the proposed construction of manpower, material resources and space in three aspects, in manpower and material resources, the main and auxiliary, production and
13、storage, and professional collaboration, use and repair and spatial layout and time arrangement, scientific, reasonable deployment for building products, rhythmic, equilibrium and continuity of optimal scheme, and with minimal consumption of resources to achieve maximum economic efficiency。Key Words
14、: Practice, Organization design, Optimal目录摘要1Abstract2目录3引言51.工程简介61.1工程概况61.2 施工目标62.施工总体布置82.1布置原则82.2交通运输、供水、供电、通讯系统82.3生产(生活)临建设施93.施工准备113.1施工测量113.2施工围堰及排水144.主体施工技术方案174.1土方工程174.2水域工程214.3桥梁工程344.4水闸工程485.组织机构与劳动力计划535.1组织管理机构535.2劳动力供应计划546.施工机械设备617.施工进度计划与保证措施627.1进度承诺与主要工期计划安排627.2进度控制措施
15、638.施工质量保证措施688.1质量目标688.2质量保证措施689.施工安全保证措施749.1安全生产目标749.2安全保证措施7410.文明施工及环保措施8710.1文明施工8710.2环境保护94附表一 拟投入本标段的劳动力计划表102附表二 拟投入主要施工设备表103总结104参考文献105引言施工组织设计是根据国家或业主对拟建工程的要求、设计图纸和编制施工组织设计的基本原则,从拟建工程施工全过程的人力、物力和空间等三个要素着手,在人力与物力、主体与辅助、生产与储存、专业与协作、使用与维修和空间布置与时间排列等方面进行科学地、合理地部署,为建筑产品的节奏性、均衡性和连续性提供最优方案
16、,从而以最少的资源消耗取得最大的经济效果,使最终建筑产品的生产在时间上达到速度快和工期短,在质量上达到精度高和功能好,在经济上达到消耗少、成本低和利润高的目的。施工组织设计是规划和指导拟建工程的施工准备到竣工验收过程的一个综合性的技术经济档。它围绕一个工程项目或某一单项工程,从时间、空间、人力、物力诸方面进行科学、合理的部署和安排,为施工生产的节奏性、均衡性和连续性提供最佳方案。从而以最少的资源消耗获得最大的经济效益施工组织设计的主要内容包括:施工总说明、施工前期准备、施工总体布置、施工导流、施工总进度、主体工程施工、施工资源用量计划、其它各项保证措施。1.工程简介1.1工程概况余姚市二期围区
17、湖北块造地工程位元于新围垦的杭州湾海涂内,现已整治一期造地以西的湖北块区域,北至湖北北顺堤,南至九塘顺堤,西至湖北西直堤,东至湖北东直堤,设计总面积5973.77亩,新增耕地5191.37亩。本工程要求与已整治的一期造地的衔接,将湖北东直堤刨低,通过2#桥、湖北北顺堤、九塘顺堤,与已整治的一期形成同一体系。1.2施工目标一、质量目标:符合水利水电工程合格标准本工程将严格遵守招标文件技术规范、部颁有关施工规范,执行水利工程建设标准强制性条文,精心组织、精心施工,确保工程质量符合水利水电工程合格标准。二、工期目标:365日历天根据我们的施工能力,经认真研究,合理安排,结合工期要求,本工程施工计划于
18、2011年5月9日开工(具体开工日期以监理人发出的开工通知为准),2012年5月8日完工,施工总工期为365日历天。其中土方吹填在2011年8月31日前完工。三、安全目标确保无重大人员伤亡事故,无等级火警事故。四、文明施工目标严格按照文明施工有关要求施工,争创文明施工标化工程。五、环保及水土保持目标严格按环保及水工保持部门有关规定进行施工,控制施工污染,减少粉尘及空气、噪声污染,保持生态平衡,防止水土流失,创造良好的生态环境。六、防汛抢险目标达到安全渡汛,工程无险情。2.施工总体布置2.1布置原则1、按照工程施工总工期、控制性进度、工程实际施工条件进行布置;2、有利于施工管理,做到方便、合理,
19、满足安全、环保等要求进行布置;3、根据现场地形、地貌、环境条件进行布置。2.2交通运输、供水、供电、通讯系统1、交通运输本工程对外交通较为便利,场外材料公路运输主要依靠业主提供的路线行进,即料场(黄家埠回龙村)329国道(或329复线)泗门抢险专用道(或临时抢险专用道)老海塘现场。施工场内交通计划利用已有进场道路(按施工需要加宽加固)进入施工现场,并与对外道路连通,再结合机耕路修建进行运输,并修建下到基坑的施工斜道,施工期间加强道路管理、维修、养护。施工过程中要对运输车辆载重进行控制,避免造成破坏、发生事故。2、施工供水本工程施工用水为可用滩涂水,砼工程用水与生活用水计划采用自来水,铺水管引水
20、到各施工用水处,装表计量付费。3、施工用电本工程施工用电考虑业主提供的网电供电保证率为70%,不足的自备柴油发电机发电解决,网电从业主提供的施工用电的接口引接380V低压施工用电线路,用56m,梢径68cm的木电杆,跨路架线对地高度4m,三相五线制橡胶电线架设到各用电区,100m左右设铁壳开关箱及触电保护装置,各施工点用电一律从开关箱引接。生活用电与施工用电分开。考虑停电及事故,施工自备100KW柴油发电机组二台,作为应急备用电源。4、施工通讯现场施工采用无线通讯系统,施工调度指挥配备对讲机,管理人员、施工队长配备手机,达到通讯及时。2.3生产(生活)临建设施一、生产系统1、砼拌和系统1)施工
21、现场附近空地设4处搅拌场,各配JS1000拌和机(容量大于750)一台。搅拌站储水箱、砂石料场、水泥罐(水泥库房)就近布置,各类骨料堆放场地用砌石隔墙加以隔离,防止混淆,并在场地四周做好排水系统。混凝土生产满足混凝土质量、品种和浇筑等指标要求。2)砼站附近石子、黄砂堆场:按不同规格的骨料和黄砂存放用脚手片隔开,做好四周排水。3)水泥:水泥进场应有质量出厂合格证和复检数据,并接受监理人查库和抽样检测,到货水泥按不同品种、标号、出厂批号,分别贮放在专用的仓库或储罐中,先到先用,防止受潮等引起水泥变质。二、生产(生活)临建设施本工程施工项目部、生活用房、生产临建设施计划布置在施工道路内侧(业主征地范
22、围内),项目部位置设在湖北顺堤节制闸东侧50米塘田里,办公、住宿食堂分开,面积不少于250m2。(详见附表施工总平面图)三、材料准备为保证工程进度,在施工准备期积极做好工程材料的采购、储运,确保施工高峰期不因材料供应而影响工程施工。材料堆场计划设在业主征用的较空旷的场地上。四、其它临设布置1、各生活区设置垃圾坑、厕所,安排工人定期打扫清理。2、发电机房、机修间、油库等设置废油池,防治废油乱倒污染。3、消防设施:在各作业区、仓库、宿舍配备灭火器。4、施工道路夜间设路灯,施工现场及危险地段周围设栏杆或危险警示信号灯。5、工地入口处搭设施工标牌,树立工程形象图表、安全生产三宝、四口、十个不准等图文标
23、牌。3.施工准备3.1施工测量一、施工测量流程图现场初步选点研究、制定测量方案测量控制网建立施工测量原始数据记录测量仪器校核监理工程师技术交底图3-1施工测量流程图二、测量工作程序1、平面(高程)控制:首先对业主提供的测量基准点、基准线和水平点及其基本数据数据与监理一起进行复测和校核其准确性,确认无误后,报监理备案,然后在施工现场选择视野广、通视好、不遭碰动的地方,设置施工测量控制点,包括现有道路、河流轴线坐标点,形成施工平面(高程)控制网,根据施工需要对控制点可适当增设,按本工程等级与相应的平面(高程)控制测量精度要求进行施工测量控制网测量,达到精度要求后,做平差计算,确定控制点坐标值和高程
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 余姚市 二期围区 湖北 工程施工 组织设计

链接地址:https://www.31ppt.com/p-4947696.html