a挂网喷射混凝土工程.doc
《a挂网喷射混凝土工程.doc》由会员分享,可在线阅读,更多相关《a挂网喷射混凝土工程.doc(9页珍藏版)》请在三一办公上搜索。
1、living standards, poor farmers in less than complete elimination of 4600 Yuan, 8949, 19008. Five waters rule: the County invested 2.169 billion yuan, similar counties line the citys first complete the 42 km of sewage pipe network construction, completion rate ranked first in the city, won the provin
2、cial rural sewage treatment work better; key pollution sources such as electroplating, papermaking, chemical industry management through verification and acceptance of the municipal government, the County removed Black and odorous River, River waste, beginning of river ecological restoration effects
3、. Three modified a split aspects: County total demolition illegal area up 2.759 million square meters, completed City issued annual task of 153%, split against area ranking city second; completed three modified area 4.846 million square meters, completed City issued annual task of 403%, ranking city
4、 third, which village in the a target completed total city ranking first; County Government was named city level three modified a split work advanced. These achievements are hard won and should be appreciated. However, we are fully aware, the new period, and work in the countryside and the environme
5、nt facing higher standards and requirements, provincial party Committee offered to high level build a comprehensive well-off society goal requires no filth, dirty environment illegal buildings, into a well-off; municipal party Committee also proposes to build into the well-off benchmark goals of the
6、 city. Compared with the superior claim, South Gate of XX beautiful goal, my County San Nong and environment there are a number of weaknesses and gaps, highlighted in the following five aspects: first, agriculture remained low pattern. Low is reflected in the quality and low; short, value added of t
7、he industry chain is low; 123 fusion yield low employee age, low quality. Small is reflected in smaller, specialized cooperatives throughout the County there were 3,396, but on the scale of too little. San is reflected in production, management, services, decentralized, centralized, standardized, br
8、and, information and organizational level is not high. Second, the countryside is still in dirty phase. Dirty is dirty of rural sanitation situation has not changed. Chaos is a village in rural housing construction planning, construction of disorder, no drawings, no construction, no vetting four no
9、phenomenon, heap lying there. Bad is the weak rural base, village governance is poor. Thirdly, farmers continued to be persistent look. Old is aging, rural labor force accounted for 70% over the age of 50. Big is that the reform measures ground resistance, such as the transactions of property rights
10、, land replacement; public service supply gap, rural education, health care, pensions and other services can not meet the demand still difficult for poverty alleviation, with emphasis on poverty alleviation and 191. Hard is a peasants, peasants. Four water effects still lacks挂网喷射混凝土工程施工方案编制单位:*编制日期:
11、2012年9月挂网喷射混凝土工程施工方案第一章 挂网喷射砼施工方案(一)本工程挂网支护喷砼厚10cm,砼强度等级为C20。(二)钢筋挂网施工 本边坡根据现场实际情况,设单层双向钢筋网片,钢筋间距200mm200mm,采用8钢筋。可适当加设锚钉,固定钢筋网片。(三)喷射砼原材料要求喷射混凝土的原材料应满足下列规定:1、应优先选用普通硅酸盐水泥,也可选用矿碴硅酸盐水泥或火山灰质硅酸盐水泥,必要时,采用特种水泥;2、应采用坚硬耐久的中砂或粗砂,细度模数宜大于2.5,含水率宜控制在57%。3、应采用坚硬耐久的卵石或碎石,粒径不宜大于15mm;当使用碱性速凝剂时,不得使用含有活性二氧化硅的石材;4、喷射
12、混凝土用的骨料级配宜挖控制在下表所给范围内:喷射混凝土骨料通过各筛径的累计重百分数(%)项目骨料粒径(mm)0.150.300.601.202.505.010.015.0优57101517222331354350607382100良48522133118412654407062901005、应采用符合质量要求的外加剂,掺外加剂后的喷射混凝土性能必须满足设计要求;在使用速凝剂前,应做与水泥的相容性试验及水泥净浆凝结效果试验,初凝不应大于5分钟,终凝不应大于10分钟;6、混合水中不应含有影响水泥正常凝结与硬化的有害物质,不得使用污水以及PH值小于4的酸性水和含硫酸盐量按SO42-计算起过水重1%的
13、水。(三)施工机具1、选用的喷射机应符合下列规定:(1)密封性能良好;(2)输料连续、均匀;(3)生产能力(干混合料)为35m3/小时;(4)允许输送的骨料最大粒径为25mm;(5)输料距离(干混凝土合料)水平不小于100 m,垂直不小于30m;2、选取用的空压机应满足喷射机工作风压和耗风量的要求。压风进入喷射机前,必须进行油水分离。3、混合料的搅拌宜采用强制式搅拌机。4、输料管应能0.8兆帕以上的压力,并应有良好的耐磨性能。5、供水设施应保证喷头处的水压力为0.150.2兆帕。(四)混合料的配合比与拌制1、混合料的配合比应符合下列规定:(1)水泥与砂石之重比宜为:41:4.5;(2)砂率宜为
14、4555%;(3)水灰比宜为0.40.45(4)速凝剂掺量应通过试验确定。2、原材料按重计,称量的允许偏差应符合下列规定:(1)水泥和速凝剂均匀2%(2)砂、石均为3%;3、混合料搅拌时间应遵守下列规定:(1)采用容量小于400公斤的强制式搅拌机,搅拌时间不得少于1分钟;(2)采用自落式搅拌机时,搅拌时间不得少于2分钟;(3)采用人工搅拌时,搅拌次数不得少于三次;(4)混合料掺有外加剂时,搅拌时间应适当延长。4、混合料在运输、存放过程中,应严防雨淋、滴水及大块石等杂物混入,装入喷射机前应过筛;5、混合料宜随拌随用。不掺速成凝剂时,存放时间不应超过2小时;掺速成凝剂时,存放时间不应超过20分钟。
15、(五)喷射前的准备工作1、喷射施工现场,应作好下列准备工作:(1)平整基坑支护面。(2)埋设控制喷射混凝土厚度的标志;(3)喷射机司机与喷射手不能直接联系时,应配备联络装置;(4)作业区应用良好的通风和足够的照明装置。2、喷射作业前,应对机械设备、风、水管路和电线等进行全面检查及试运转。3、受喷面有滴水、淋水时,喷射前应按下列方法做好治水工作。(1)有明显出水点时,可埋设导管排水;(2)渗透系数小、导水效果不好的含水岩层,可设盲沟排水;(六)喷射作业1、喷射作业应遵守下列规定:(1)喷射作业应分段分片进行,喷射顺序应自上而下;(2)一次喷射厚度应按下表选用;一次喷射厚度(mm)部位掺外加剂不掺
16、外加剂边墙701005070拱部50603040坡面1020810(3)分层喷射时,后一层喷射应在前一层混凝土终凝后进行,若终凝1小时后再进行喷射时,应先用风水清洗层表面;(4)喷射作业紧跟工作面时,混凝土终凝到下一循环放炮时间,不应少于3小时。2、喷射机司机的操作应遵守下列规定:(1)作业开始时,应先送风,再开机、再给料;结束时,应待料喷完后,再停风;(2)向喷射机供料应稳定均匀;机器正常运转时,料斗内应保持足够的存料;(3)喷射机的工作台风压,应满足喷头外的压力在0.1兆帕左右;(4)喷射作业完毕或因故中断喷射时,必须将喷射机和输料管内的积料清除干净。3、喷射手的操作遵守下列规定:(1)喷
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 喷射 混凝土 工程
链接地址:https://www.31ppt.com/p-4929703.html