1、 2660 MW SUPER CRITICAL COAL FIRED THERMAL POWER PROJECTNCCPPL, NELLORE, ANDHRA PRADESH (INDIA)印度纳佳2660 MW 超临界燃煤热电项目Boiler Steam Blowing Commissioning Procedure锅炉蒸汽吹管调试措施NO.: CNTIC-TEPC-TS-JWZ009-2015 RAV:APROJECT: 2660 MW SUPER CRITICAL COAL FIRED THERMAL POWER PROJECT DOCUMENT TITLE: Boiler Steam
2、Blowing Commissioning ProcedureDOCUMENT NO.: CNTIC-TEPC-TS-JWZ009-2015 REV. NO. : A ENDORSEMENTSLiu YunqianREV. NO.DATEDESCRIPTIONPREP. BYSIGN.(INITIAL)REVW. BY SIGN.(INITIAL)APPD BY SIGN.(INITIAL)Indian NCC 2660MW Super-critical Coal-fired Power Plant目录Content1 工程概况 Project description11.1工程概况Proje
3、ct description11.2锅炉主要设计参数 Boiler design capacity and parameter11.3锅炉给水及蒸汽流程 Boiler feed-water and steam flow21.4蒸汽(水冲洗)吹扫范围the range of steam blowing(water flushing)22编制依据 Basis of Compilation33编制目的 purpose of compilation33组织与分工Organization division34调试前应具备的条件和准备工作Preparations and Conditions before
4、 commissioning54.1机务应具备的条件 the condition of mechanical54.2电气、热控应具备的条件the condition of electrical, C&I104.3土建应具备的条件 the required condition of civil engineering114.4 其它应具备的条件 the other required conditions124.5作业人员配置、资质The allocation, qualification of commissioning personnel124.6调试所需仪器和设备The equipments
5、 and instruments required125调试程序和方法commissioning Procedure and Method125.1吹管方法 steam blowing method125.2吹管系统流程 steam blowing system flow135.3吹管蒸汽参数及吹管系数计算Steam blowing coefficient and calculation of the coefficient155.4吹扫的临时设施 temporary facilities of steam blowing165.5吹管操作步骤 operation step for steam
6、 blowing196蒸汽吹管质量标准 the quality standard for steam blowing257安全注意事项 safety caution261 工程概况 Project description 1.1工程概况Project description印度纳佳2660MW电站项目工程所采用的锅炉设备是由哈尔滨锅炉厂有限公司制造的型号为HG2000/25.9-YM19超临界锅炉。该锅炉为变压运行、一次中间再热、单炉膛、平衡通风、固态排渣、全钢架悬吊结构、露天布置的型超临界锅炉,采用不带再循环泵的大气扩容式启动系统,采用四角切圆燃烧方式、低NOx燃烧器,32只燃烧器分8层布置
7、。采用中速磨直吹式制粉系统,配北京电力设备总厂制造的8台ZGM133N-II型中速磨煤机。在锅炉BMCR工况下,6台运行2台备用。The boiler for 2x660 MW super critical coal fired thermal power project, the type of boiler for NCC project is HG2000/25.9-YM19, made by Harbin Boiler Works, LTD. The boiler is type outdoor arrangement supercritical boiler with variabl
8、e pressure operation, single intermediate reheat, single furnace, balanced draft, dry ash removal and total steel frame suspending structure. It has atmospheric flash type startup system without re-circulating pump and adopts tangential firing, low NOx combustion burners, 32 burners are arranged in
9、8 layers. The boiler is equipped with 8 units ZGM133N-II medium speed mills direct-fired system of Beijing Power Equipment Group, under BMCR condition, 6 mills are in operation 2 mill is standby.锅炉以最大连续出力工况(BMCR)为设计参数。在任何6台磨煤机运行时,锅炉能长期带BMCR负荷运行。Boiler takes maximum continuous rating (BMCR) as design
10、 parameter. When any 6 mills are operating the boiler can operate with BMCR load for long time.机组设高、低压两级串连旁路系统,汽轮机旁路系统的容量暂按锅炉BMCR工况的60设置;高低压旁路包括蒸汽控制阀、减温水控制阀和关断阀以及控制装置。The unit has high pressure and low pressure two-stage series bypass system, and capacity of bypass system of the turbine will be set
11、temporarily based on 60% of BMCR working condition of boiler; High pressure and low pressure bypass system includes steam control valve, de-superheated water control valve, shut off valve and control devices.1.2锅炉主要设计参数 Boiler design capacity and parameter单位UnitBMCR工况BMCR LoadTMCR工况TMCR Load过热蒸汽:Sup
12、erheated steam过热蒸汽流量Superheated steam flowt/h20001884.33过热器出口蒸汽压力SH outlet steam pressureMPa.g25.925.76过热器出口蒸汽温度SH outlet steam temperature571571再热蒸汽:Reheat steam再热蒸汽流量Reheat steam flowt/h1651.611561.55再热蒸汽进口压力Reheat steam inlet pressureMPa.g4.9504.680再热蒸汽出口压力Reheat steam outlet pressureMPa.g4.7004.
13、444再热蒸汽进口温度Reheat steam inlet temperature325.8320.3再热蒸汽出口温度Reheat steam outlet temperature603603主给水压力Main feedwater pressureMPa.g29.529.5给水温度Feedwater temperature284.8280.91.3锅炉给水及蒸汽流程 Boiler feed-water and steam flow 给水及过热蒸汽系统:给水管路省煤器水冷壁入口集箱水冷壁中间混合集箱水冷壁出口集箱混合集箱汽水分离器,水至储水罐疏水扩容器凝汽器;蒸汽至顶棚管过热器后竖井/水平烟道包
14、墙低温过热器屏式过热器高温过热器。 Feed-water and superheat steam system: feed-water pipe economizer the inlet header of water-wall the middle mix header of water-wall the outlet header of water-wall mix header separator, the water to storage water tank drain flashing tank/condenser/; the steam to roof superheater b
15、ackpass/ horizontal flue gas duct steam cooled wall low temperature superheater platen superheater high temperature superheater.再热蒸汽系统:高压缸排汽竖井前烟道的低温再热器水平烟道内的高温再热器。Reheat steam system: exhaust of high pressure cylinder low temperature reheater in front flue gas duct of backpass high temperature rehea
16、ter in the horizontal flue gas duct.1.4蒸汽(水冲洗)吹扫范围the range of steam blowing(water flushing)1、锅炉过热器系统,主蒸汽管道; Boiler superheater system, main steam piping;2、锅炉再热器系统,冷段再热管道,热段再热管道;Boiler reheater system, cold reheat piping, hot reheat piping;3、机组高压旁路系统管道;The high pressure bypass piping of unit;4、锅炉吹灰器
17、主汽汽源管道;The sootblower steam source piping of main steam;5、锅炉主蒸汽减温水系统的水冲洗; The water flushing of boiler main steam desuperheater system;6、锅炉再热蒸汽事故喷水系统的冲洗; The water flushing of boiler reheat steam emergency desuperheater system2编制依据 Basis of Compilation 1)厂家资料及设计院图纸Manufacturers document, designing i
18、nstitute drawings2)调试大纲The Outline of Unit Commissioning3编制目的 purpose of compilationl 新安装机组,在锅炉过热器、再热器及其蒸汽系统等系统中,不可避免会有焊渣、锈垢和其它杂物。在锅炉正式向汽机送汽前,用蒸汽吹扫的方法将这些杂物清除,以确保机组的安全、经济运行。In the supereheater, reheater and the relative steam system of new erection boiler, there are unavoidable have some rusty, weldi
19、ng slag and other sundries. Before the boiler supply the steam to turbine, steam blowing will clean the sundries to ensure the safety and economical of unit running. l 检查锅炉首次点火前的各项试验工作。The work and test before first light up will be checked.l 首次进行锅炉点火工作,对锅炉进行热态的全面检查。Carry out the work of boiler firs
20、t light up, and take the full check of boiler at hot state.l 为了指导锅炉吹管工作的顺利进行,保证与锅炉吹管有关的系统及设备能够安全正常投入运行,制定本措施。In order to guide the boiler steam blowing work smoothly, guarantee systems and equipments related to the boiler steam blowing can normal running safety, the procedure are formulated.3组织与分工Or
21、ganization division施工单位:负责完成吹管所需要的临时系统的安装工作;在吹管过程中,负责完成系统范围内的设备的维护、消缺、检修工作;负责现场的消防和安全工作;负责系统临时挂牌工作;负责完成吹管临时测点的安装工作;负责靶板的安装更换等工作;负责做好运行设备与施工设备的安全隔离措施;负责靶板的准备工作;吹管结束后,负责完成临时系统的恢复工作;在吹管结束后参加签证验收工作。Erection unit: responsible for the installation of temporary system work necessary to complete the steam b
22、lowing. In the process of steam blowing, is responsible for complete the maintenance, and repair work of the equipments within the scope of the system; Responsible for the fire fighting and safety work of field; Responsible for system temporary nameplates; To complete the installation of the blowpip
23、e temporary measuring points is responsible for the work; Responsible for the installation of the target plate replacement work; Responsible for the operation of equipment and construction equipment safety isolation measures. The preparation of target plates; after the steam blowing, is responsible
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 2215 660 MW 临界 燃煤 热电 项目 锅炉 蒸汽 吹管 调试 措施 中英对照
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4863564.html