1、CHANGCHUN INSTITUTE OF TECHNOLOGYBuilding construction concrete crack ofprevention and processing建筑施工混凝土裂缝的预防与处理 资料来源:Journal of Construction Engineering 设计题目:长春市明星培训中心办公楼结构、施工设计学生姓名: 学院名称: 土木工程学院 专业名称: 土木工程 班级名称: 土木0944班 学 号: 指导教师: 教师职称: 副教授 完成时间: 2013年4月7日 Building construction concrete crack ofpr
2、evention and processingDimosi MCANADIAN JOURNAL OF CIVIL ENGINEERING建筑施工混凝土裂缝的预防与处理迪默斯M加拿大土木工程学报Abstract:The crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem in
3、 the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure. Keyword: Concrete crack prevention processingForeword Concretes ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition material
4、 of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the
5、concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc. func
6、tion, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering. Concrete building and Gou piece usually all take sewer to make of, because of crack of existen
7、ce and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive peoples life and property safety.A l
8、ot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age science research with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acceptable in certainly of the
9、 scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width.But at under construction should as fa
10、r as possible adopt a valid measure control crack creation, make the structure dont appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus. Concrete crack creation of th
11、e reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected environment not appropriate the crack etc. caused with chemi
12、cal effect.Want differentiation to treat in the actual engineering, workout a problem according to the actual circumstance. In the concrete engineering the familiar crack and the prevention 1.Stem Suo crack and prevention Stem the Suo crack much appear after the concrete protect be over of a period
13、of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is cant negative.Stem Suo crack of the creation be main is because of concrete inside outside humidity evaporate degree dissimil
14、arity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surface stem the Suo transform to be subjected to concrete in
15、ner part control, creation more big pull should dint but creation crack.The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or the net shallow thin crack, width many between 0.05-0.2 m
16、m, the flat surface part much see in the big physical volume concrete and follow it more in thinner beam plank short to distribute.Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence concrete of reinforcing bar, under the function of the water
17、 pressure dint would creation the water power split crack influence concrete of loading dint etc.Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the dosage of the property and dosage, in addition etc. releva
18、nt. Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a concrete of stem the Suo be subjected to water ash ratio of influence more big, water a
19、sh ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce water.Three is strict control concrete mix blend with under construction of match ratio, u
20、se of concrete water quantity absolute cant big in match ratio design give settle of use water quantity.Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete time.Winter construction want to be appropriate extension concrete heat preservation
21、to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew. 2.The Su constringency crack and prevention Su constringency is the concrete is before condense, surface because of lose water quicker but creation of cons
22、tringency.The Su constringency crack is general at dry heat or strong wind the weather appear, cracks much presenting in the center breadth, both ends be in the centerthin and the length be different, with each other not coherent appearance.Shorter crack general long 20-30 cm, the longer crack can r
23、each to a 2-3 m, breadth 1-5 mm.It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventually Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface
24、 lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharply constringency, but at this time the strength of concrete again cant resist its constringency, therefore creation cracked.The influence concrete Su constringency open the m
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 可提供完整设计图纸 建筑 施工 混凝土 裂缝 预防 处理 外文 翻译 提供 完整 设计 图纸

链接地址:https://www.31ppt.com/p-4843198.html