mm中广核到沽源黄盖淖风电项目监理大纲.doc
《mm中广核到沽源黄盖淖风电项目监理大纲.doc》由会员分享,可在线阅读,更多相关《mm中广核到沽源黄盖淖风电项目监理大纲.doc(225页珍藏版)》请在三一办公上搜索。
1、yuan, an increase of 17.5%; local government general budget revenue of 500 million Yuan, . Painting, model culture creates new Ma Church community, creating Lake scenic spot culture education base, received high evaluation from provincial and municipal discipline Inspection Commission, the peoples d
2、aily special report. Constantly promote independent Commission against corruption culture construction to rural extends, created established Dahlin rural industry Park independent Commission against corruption culture positions, formed has a support service low double excellent of members lead team,
3、 constantly perfect and established Park funds assets management, and village audit supervision, and villagers democratic financial, system, strengthening Park party, and Chief, and financial, full public, powerful to guarantees has new rural construction, by city rural style clean government inspec
4、tion unit led of height evaluation. Through the implementation of honest and clean government cultural construction, and effectively educate the broad masses of party members and cadres and consciously regulated behavior and discipline, honesty in politics and culture to create a good atmosphere and
5、 fresh development environment. Although we in implement implementation independent Commission against corruption guidelines aspects made has must effectiveness, but away from superior of requirements also exists must of distance, main performance for: a is system enough sound, education, and superv
6、ision, and prevention, and punishment, aspects long-term mechanism also enough perfect, especially in enrollment bid work regulatory aspects also needed strengthening; II is regulatory supervision exists lost of Yu wide, and lost of Yu soft, investigation illegal disciplinary case of efforts also ne
7、eded strengthening, individual sector and cadres also different degree exists treat gift, not to benefits not do, and mess do of phenomenon; Three for honest work is the new situations and new problems in finding timely enough, treatment measures are not strong enough. To solve these problems, we wi
8、ll proceed from the following five aspects of rectification, make sure to implement the provisions of the code. (A) deepening the learning, enhance the consciousness of honesty in politics. To create event as an opportunity to Excel and learning party, further increasing the governance capability an
9、d advanced construction, reinforced rules of the broad masses of party members and cadres awareness, sense of responsibility, sense of honor, improve working ability and level of scientific development. Should make full use of meetings, in particular central group learning opportunity, further stren
10、gthening the study and education of the code, the intensive warning education, education the majority of party members and cadres known fear, knew fear, honesty in politics of tension the strings, consciousness and enhancing the implementation of the initiative. Also, pay attention to apply what the
11、y have learned, consciously study results into planning work, new ideas,中广核张家口沽源黄盖淖风电场200兆瓦工程 监理大纲1工程概况 1.1工程项目概况本工程根据规划的风电场区域和当地风力资源情况,以及交通运输和电力系统等条件,总装机容量为199.5MW,一次建成,其中133台金风82/1500机型。风力发电机采用一机一变的电气接线方式,将机端电压升至35kV,多台发变组的35kV侧通过集电线路接至风电场变电站35kV母线,全场共12回集电线路。1.1.1工程项目名称工程项目名称:中广核张家口沽源黄盖淖风电场200兆瓦工
12、程1.1.2工程参建单位招标人:中广核风电有限公司招标代理人:中信国际招标有限公司投标人:张家口华纬电力建设咨询有限公司1.1.3工程概况中广核沽源黄盖淖风电场位于河北省沽源县黄盖淖镇附近,黄盖淖镇位于县境西部,距县城34千米。平(定堡)半(拉山)公路过境。镇政府驻黄盖淖村。中广核沽源黄盖淖风电场装机规模为200MW,一次建成,共装设133台单机容量为1500kW的风力发电机组。风电场拟考虑以220kV电压等级接入系统,133台风力发电机组以35kV集电线路汇集至场内新建220kV升压站,出1回220kV线路至已建成的中广核友谊风电场220kV侧,与友谊风电场一起并入电网公司察北站220kV侧
13、。中广核沽源黄盖淖风电场升压站距离中广核友谊风电场升压站约50公里。本风电场新建220kV升压站一座,装机规模为199.5MW。本期升压站主变容量按2100MVA考虑。 拟建场地地基岩土主要海西期侵入花岗岩和太古界红旗营子群斜长角闪片麻岩、斜长角闪岩,场地均匀性良好;场地及周围无不良地质作用,场地稳定性较好,适宜本工程建设。勘察期间在勘探深度内未发现地下水,本场地可不考虑地下水对建筑材料的腐蚀性问题。拟建场地抗震设防烈度为7度,设计地震分组第一组,设计基本地震加速度值为0.10g。拟建场地土类型为中硬土,类场地。设计特征周期值为0.25s。本区标准冻深为2.20-2.30m,最大冻深2.80m
14、。1.2.1工程项目1.2.1工程项目组成本工程由以下项目组成:(1)施工道路、支线道路、基础平台开挖、回填工程、路面工程;(2)35KV集电线路工程;(3)风力发电机组吊装工程;(4)箱变安装工程;(5)防雷接地工程;(6)风机及箱变基础工程;(7)设备进场道路改造工程;(8)220kV升压站电气设备安装工程;(9)220kV升压站土建工程;(10)220kV升压站装饰装修工程;(11)220kV送出输电线路工程(12)植被恢复(水土保持)工程。以及为完成上述工程所必须的临时工程等。1.2.2合同控制目标1.2.2合同控制目标及监理依据一、监理目标我公司将依据国家有关工程建设现行的法律、法规
15、、行业规范和行业标准,以及本工程合同文件、设计文件对沽源黄盖淖风电场工程建设的质量、进度、投资、安全、环境保护、水土保持等进行有效控制和管理,协助业主确保本工程建设按合同目标顺利进行,切实实现工程建设的质量、进度、投资、安全文明施工、环境保护、水土保持等控制目标。本项目监理服务的目标是对沽源黄盖淖风电场工程进行施工总目标控制,实现本工程项目的投资造价控制目标、进度目标和质量目标,通过项目的风险分析管理、项目目标规划和项目目标的动态控制,使沽源黄盖淖风电场工程项目的实际资金不超过概算资金,实际建设总工期控制在合同计划工期12个月以内,工程质量达到合格并争创优良工程。具体为:投资造价控制目标:实际
16、资金投入不超过概算资金。进度控制目标:实际工期控制在合同工期12个月以内。质量控制目标:保证合格,争创优良。安全管理目标:现场安全文明施工状况良好,实现人身死亡事故“零目标”,确保不发生以下事故:1. 不发生人身死亡及群伤事故;2. 不发生特大、重大、机械设备事故;3. 不发生恶性误操作事故;4. 不发生重大火灾事故;5. 不发生重大的交通责任事故;6. 不发生特大的环境污染事故;环保目标:达到国家有关标准要求。督促承建单位做好对工程建设区域的环境保护,减少对当地生态环境的破坏和影响,达到施工承包合同的有关要求。合同管理目标:严格依据合同,杜绝违反合同事件。信息管理目标:完整、系统、准确,信息
17、处理及时率达100%。协调目标:解决矛盾,避免冲突,保证建设总目标的顺利实现。二、适用法律、法规、规章和监理依据本工程监理依据为与电力建设工程项目有关的法律、法规、规章、规范和工程建设标准强制性条文;与电力建设工程项目有关的项目审批文件设计文件和技术资料;监理大纲、委托监理合同以及与电力建设项目相关的合同文件;与工程相关的建设单位管理文件。并包括以下文件:文件详情见1.2.3风电工程主要技术文件清单1. 综合性标准或文件:1.1 建设工程质量管理条例 中华人民共和国国务院令第279 号;1.2 工程质量监督工作导则 建质2003162 号;1.3 电力建设工程质量监督规定(暂行) 电建质监20
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- mm 中广核到 沽源 黄盖淖风电 项目 监理 大纲
链接地址:https://www.31ppt.com/p-4836362.html