1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the国道207线涞源插箭岭至走马驿段改建工程黑龙湾隧道施工组织设计编制: 审核: 审批: 黑龙湾隧道工程项目部 二零一一年十二月三日国道207线涞源插箭岭至走马驿段改建工程黑龙湾隧道施工组织设计根据黑龙湾隧道合同段工程实际情况,结合我标段工程项目施工特点,经项目部组织相关人员进行认真分析和研究,对施工前期的准备编制施工进度计划,做出人员、设备、措施及组织安排,在工程实施过程中严格依照此施工进度计划进行实施,确保进度计划目标顺利实现。一.工程概括黑龙湾隧道所在地区属河北省涞源县走马驿镇黑龙湾村,地处山村区,远离村落,交通情
22、况较差。进口在K10+145处,出口在K10+460处,长度为315米,隧道穿越山体最高海拨为642.1米,隧道最大深埋为76.4米。黑龙湾隧道隧址区起伏较大,冲沟较发育,地面标高变化在582.00637.00米之间,相对高差达55米,出露地层为太古界五台群黑云斜长片麻岩,节理、裂缝发育。该隧址区属构造剥蚀中低山地貌单元。第一章 施工总体布置1.1 施工总布置原则(1)以主体工程枢纽布置及工程所在区场地自然条件为依据,科学合理的安排施工场地和各种设施,满足各项目、各工序的衔接及施工要求。(2)方便施工,减少干扰,利于生活,方便生产;各类设施全部布置在业主规划好的场地内,尽量减少周围植被和树木的
23、破坏。(3)认真规划、设计卫生设施,污水、污物处理要符合相应的行业规定。(4)临时设施要有利于安全防护,便于消防设施发挥作用,并利于防盗。(5)充分利用当地可为工程服务的建筑、加工制造、修配及运输等企业。项目经理部(含实验室)应设置在便于对沿线工程施工进行指挥且交通条件、生活条件和通讯条件较好的地方。根据本工程特点,地点选在出口K10+460河床岸附近,便于施工管理。具体平面布置详见施工总平面图。1.2 临时设施的布置(1)临建采用砖房和板房两种形式。食堂采用活动板房。办公室、会议室和宿舍为砖房,按照地方永久性房屋建筑标准(平房)建设。工程结束后无偿交给建设单位使用或按建设单位意见拆除。实验室
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 黑龙湾 施工组织设计

链接地址:https://www.31ppt.com/p-4834945.html