1、construction enterprises to take the full responsibility for security within the enterprise functions and scope of work. 57th: construction projects construction project safety Committee should be set up. Corporate units shall be convened by the project was founded and acted as Director, by construc
2、tion enterprises elected representatives, the Deputy Director. Other Committee members consists of the first contractor (construction companies) authorized by the legal representative or the legal representative of participants. Change a member of the Committee, to members of the Committee are to be
3、 adjusted according to changes within 7 days. Article 58th: the basic task of building safety Committee: (a) adopting and publishing enterprise of construction site and safety requirements; (B) decide to major in engineering construction solutions to security problems; (C) coordinating the relations
4、hip between construction enterprises in relation to security issues; (D) appointing authority personnel. Safety committees does not replace the internal safety management of construction enterprises. 59th: Security Committee must build the project before construction was established and held its fir
5、st meeting and thereafter at least every quarter meeting. Conference resolutions and all content should be in writing to the company notice of construction enterprises. 60th: resolutions of the Security Council to take significant vote. Resolution is not adopted, without amendment of the relevant pr
6、ovisions do not vote again. Resolution shall not violate the relevant provisions of the national, industry and firm. 61st: safety committees safety supervision and Management Office, responsible for the day-to-day management of the Security Committee, Office staff supervised by the project company f
7、ull-time security personnel and project management company safety engineers. The 62nd article: safety supervision and Management Office is accountable to the Security Council and authorized by the Security Council. Its main tasks: (a) supervision of construction companies to implement Security Counc
8、il resolutions; (Ii) the major security problems in engineering . Of personal injury accident during construction and in accordance with the relevant provisions of step by step by project legal person units reporting to the Group and, if necessary, must be promptly reported to the relevant Governmen
9、t Department. 65th: construction enterprises in engineering, serious injuries and deaths be reported to the Engineering Safety Committee; Committee on the safety assessment of construction enterprises in implementation of Commission resolution. 66th company project legal situation monitoring, assess
10、ment of the implementation of the provisions of this chapter. 67th: units of the company as a legal, signed contract with the construction company, the relevant provisions of this chapter shall be as clear contract. Tenth section, Contracting and temporary engineering 68th: carbon companies contract
11、ing and temporary project management system, standard contract and labor contract form, content, and approval procedures to be performed and the parties concerned should bear the responsibility. 69th: carbon companies outsourcing and contract projects shall sign the contract. Shall specify in the co
12、ntract the employer and the湖南省湘西公路桥梁建设有限公司合作至冶力关二级公路HYSG1标K23+4582加可哈沟大桥桩基础工程开工报告合作至冶力关二级公路HYSG1标项目经理部二一二年六月合作至冶力关二级公路HYSG1标公路建设项目工程开工申请单承包单位 湖南省湘西公路桥梁建设有限公司 合同号 HYSG1 监理单位 陕西兴通工程监理咨询公司 编 号 致 先生:根据合同要求,我们已经做好K23+458加可哈沟大桥桩基础工程的开工前的一切准备工作,现要求该项工程正式开工,请予批准。计划开工日期:2012年7月05日计划交工日期:2012年8月25日本项工程现场技术负责人
13、姓名: 附件: 1、施工组织设计报审表;2、施工技术方案报审表;3、施工放样报验单;4、建筑材料报验单;5、进场设备报验单;6、 分项工程月进度计划;7、 原材料试验报告及标准试验报告;8、 文明施工、安全生产措施;9、 环境保护措施等。 承包人: 年 月 日专业工程师意见试验工程师意见测量工程师意见 签字: 年 月 日 签字: 年 月 日 签字: 年 月 日高级驻地监理工程师意见:签字: 年 月 日备注:contractor should bear the responsibility for security, and the Enterprise Management Departmen
14、t of Department for examination and approval. 70th: carbon project developer must contract the following qualifications and conditions reviewed: (a) licence and a certificate issued by the relevant departments, the legal representative certificate, construction resumes construction safety record and
15、 nearly 3 years; (B) contractors, engineers and technicians and the technical quality of the workers necessary to meet project requirements; (C) meet the needs of safe construction machinery, tools and safety protection equipment, safety appliances; (D) whether the contractor has two levels with ful
16、l-time security management; construction team is equipped with more than 30 full-time safety officer; less than 30 people if there is a part-time security officer. 71st: carbon company as the employer shall have the following security responsibilities: (a) the contractor qualification review, determ
17、ine the conditions set on its conformity with the provisions in article; (B) before commencement of the Contracting Party Chief and engineering and technical personnel to conduct a comprehensive safety technology gives the low-down, and should have full records or information; (C) where there is ris
18、k of production operations in the region, if possible in case of fire, explosion, electric shock, falling, poisoning, suffocation, mechanical injuries, burns and other likely to cause personal injury and accident places the job, security technology to give the low-down the employer in advance and as
19、ked the contractor to develop security measures required after the review by the employer monitoring implementation; (D) specified in the contract shall be borne by the employer relating to security, labour protection and other matters. 72nd: before the project began, the employer can set aside a ce
20、rtain proportion of the construction management fees as a safety margin. In time of personal death and serious injury accidents, according to project size and duration is determined by employer safety margin deduction. The 73rd article: construction contracting officers in power production area in b
21、reach of the relevant safety procedures at a time when, employer safety supervision departments should be stopped, until it stops the contractors work. 74th: employer equipment accidents caused by the contractors liability, the employer is responsible for investigation and report, if for any reason
22、the employer assessment. Employer should be . Article 77th maintenance company maintenance, safety supervision personnel must monitor the management of the units in place, do not meet production safety requirements for site conditions affect personal safety, safety supervisors to actively intervene
23、with the maintenance staff and, if necessary, request site shutdown. 78th: temporary workers before they must undergo safety knowledge and training in safety procedures. After passing the relevant examinations, certified or wearing a sign post. Prohibition of assignment of temporary workers under co
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- d23到 458加可哈沟大桥桩基开工报告 d23 458 加可哈沟 大桥 桩基 开工 报告

链接地址:https://www.31ppt.com/p-4831378.html