1、blind Board operational security requirements 1. blocking blind Board operations required to handle blocking blind Board operating license, no blocking blind Board operating license are not allowed to smoke blocking blind Board operations. 2. it is strictly prohibited to alter, lent the blocking bli
2、nd Board operating license. Content conversion and expansion of operations or transfer jobs site, again for blocking blind Board operating license. 3. incomplete job approval procedures, safety measures are not implemented, work environment does not meet security requirements, workers have the right
3、 to refuse to work. 4. toxic gas piping, equipment blocking blind Board, non-irritant gas pressure should be less than 200 mm Hg; irritant gas pressure should be less than 50 mm Hg; gas temperature should be less than 60 degrees. 5. Technical Department responsible for drawing blind location map, nu
4、mbers the blind, construction personnel work, blind location map by technology archive for future reference. 6. the blind plug operating personnel must wear appropriate personal protective equipment, must designate a person responsible for blocking blind Board work, and to designate a person respons
5、ible for monitoring. Guardians are advised by experienced officers. , Guardian jobs people must wear appropriate protective equipment as required, and guardians must check, implementing relevant safety measures on the job. Guardians must adhere to the scene, and emergency treatment. Job guardian sha
6、ll not leave the job site before the end. 7. the job complicated, dangerous places, apart from the guardian, also company leadership, safety and Environment Department, is responsible for personnel. Involving the entire production system, head of the technical department must be present. 8. in place
7、s where inflammable and explosive work, place within 30 metres without hot work operations; task lighting should use explosion-proof lamps and explosion-proof tools should be used, prohibition of beating with an iron pipe, flange, etc. 9. high blocking blind Board operation shall follow the provisio
8、ns of license for working at height. 10. construction unit to blind a lot according to the requirements of the permit to work, the implementation of safety measures, work can be carried out. 11. is strictly prohibited on the same pipe simultaneously in two places and two or more blocking blind Board
9、 operations. When plugging multiple blind, blind to blind location map and plates number by construction General Manager, unity of command assignments. 12. signs in each blocking blind Board shows that blind location. (C) the blocking blind Board permits the management of 1. . Blind location map, im
10、plement security measures, after the approval of the technical department, assignment units (staff) to confirm. Job complex, dangerous places required security audits of the Department of environmental protection, the company in charge of safety Vice President for approval. 4. approve a good blockin
11、g blind Board operating license in triplicate, main contractors, operating units, each hold a copy of the bio section. 5. after the end of the job, jobs, technical第一章 编制依据和原则第一节 编制依据第二节 编制原则第二章 工程概况第一节 工程建设概况第二节 自然条件第三节 主要工作内容第四节 工程特点第三章 施工总体部署第一节 施工部署及施工管理机构第二节 施工临时设施布置第三节 施工准备第四章 人员设备进场安排,主要材料的管理第
12、一节 设备人员动员周期第二节 主要材料管理第五章 施工协调管理第六章 各分项工程的施工顺序第七章 挡土墙施工 第一节 挡土墙施工第二节 砌筑要求 第三节 砌筑方法第八章 托梁桩挡墙施工第九章 路基工程第一节 施工方案第二节 主要施工方法第三节 级配碎石基层施工第十章 水泥混凝土路面施工第十一章 圆管涵施工第十二章 路基边沟及排水沟工程第十三章 波形护栏的安装第十四章 重点(关键)和难点工程的施工方法及技术措施第十五章 农忙季节及季节施工组织技术措施第十六章 安全保证体系及保证措施第一节 安全保证体系及施工措施第二节 安全施工措施第三节 爆破材料的组织、物资和施工管理安全措施第十七章 质量保证体
13、系及保证措施第一节 质量管理组织机构第二节 建立质量管理制度第三节 原材料质量保证措施第四节 计量保证措施第五节 施工过程控制措施第六节 技术保证措施第七节 成品保护措施第十八章 工程进度计划及工期保证措施第十九章 保证原路交通畅通的措施第二十章 环境保护、文明施工措施第一节 管理体系及组织机构第二节 生态保护及水土保持措施第三节 文明施工第二十一章 成品保护措施第二十二章 降低污染、减少噪音技术措施第二十三章 保护地下管线和周围构筑物建筑物的措施第二十四章 工程质量回访、保修与服务check, activity handed the blind location technology. 6.
14、 work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. The lifting operation management system, purpose in order to control the production within the region, lifting, lifting activities to prevent the occurrence of accidents, the system is formulated.
15、Second, the scope of application of this system applies to all companies within the lifting operation. Third, lifting a license of graded credit three levels of management: (I) General equipment, weighing less than 1 ton of weight lifting, the lifting of the rules, technology review, workshop Direct
16、or for approval; (B) the rules of weight equal to or greater than 1 ton less than 10 tons of weight lifting, hoisting, approved by the workshop, equipment Management Department for approval. (C) of over 10 tons and heavy lifting operations projects or construction under the special conditions, shall
17、 prepare lifting plan, permit to work submitted to company executives and safety equipment, the joint security sector review competent after Assistant General Manager approval. Four, lifting safety requirements 1. lifting weights greater than or equal to 10 tonnes of the object and the subject of ci
18、vil engineering structures, hoisting construction plan shall be prepared. Load is less than 10 tonnes, but small complex shapes, stiffness, length-diameter ratio, precision precious, under the special conditions of construction, should also prepare construction programmes. Hoisting construction prog
19、rammes examined by the project authorities, submitted to the competent VP approval to be implemented. 2. lifting operations must set up the alert line and set up special care, guardianship personnel must wear armbands, lifting regional staff out of bounds; 3. lifting operations must be provided for
20、lifting loads, slings, rigging and economic calculation options, do not overload. When lifting heavy objects close to or reach the rated lifting capacity, check brakes, low height, short stroke after the load test, then smoothly lifted. Large and medium sized equipment before lifting, load test shou
21、ld be carried out. Try hanging height for about 0.2m and then conduct a reliability check (including the selection and calculation of safety factor). Overload lifting is strictly prohibited. 4. before lifting must pad the wood and the wood used must be of adequate size (be sure to over 1 m); when li
22、fting requires fire escape, you must contact the circuit breaker in accordance with the provisions; 5. lifting operations must be run on all kinds of hoisting machinery parts, safety devices as well as slings, rigging a detailed security checks, security devices for lifting equipment is sensitive an
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 广元 飞机场 红光 便条 挡土墙 技术

链接地址:https://www.31ppt.com/p-4816434.html