r施工组织上设计旋流井.doc
《r施工组织上设计旋流井.doc》由会员分享,可在线阅读,更多相关《r施工组织上设计旋流井.doc(15页珍藏版)》请在三一办公上搜索。
1、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
2、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
3、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
4、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
5、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
6、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
7、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
8、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
9、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
10、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
11、cadres in enterprise development in the技 术 标工程编号:CEET-GC2010-005工程名称:迁安市九江200万吨/年焦化污水处理机电及工艺管道安装工程批准人:审核人:崔景宽编制人:刘晓宇三冶管道公司2010年6月18日目录一. 工程概况-3二. 施工方案-4三. 人员配置-12四. 施工机具配置-12五. 施工计划-12六. 安全措施-13七. 施工技术标准选用-14八. 施工质量保证措施-14九. 施工平面图-15一. 工程概括:本次招标工程项目的招标范围主要包括焦化污水处理(吸附池、隔油池、酚水井)及泵房;调节池、事故池、生化反应池、后处理(污
12、泥浓缩池、二沉池、混凝沉底池)及后处理泵房、综合处理泵房、布水器泵房、风机房等的机械设备和工艺管道安装调试项目。主要设备一览表序号名 称型 号 及 性 能单位数量1刮油刮渣机12MP-2台42编缆式撇油机SY-120 Q=2000L/h套43双吸离心泵600S75A Q=3400m3/h H=60m台84配套电机Y560-6 N=800Kw n=970r/min V=10Kv台85潜污泵WQ20-9-1.5A Q=20m3/h H=9m台2配套电机Y型电机 N=1.5Kw N=1470r/min v=380v台26渣浆泵40PV-SP Q=26.64m3/h H=22.5m台2配套电机Y132
13、S1-2 N=5.5Kw n=2100r/min V=380v台27电动桥式吊车G=10t Lk=10m 起升高度10m台18电动抓斗式吊车G=10t Lk=21m 起升高度15m台19立式泵600LT-1100X2 Q=3000m3/h H=39m台910泵配电机YL500-6 N=500Kw V=10Kv台911立式泵200LT-400X3 Q=300m3/h H=37.5m台112泵配电机YL250M-4 N=55Kw V=380v台113膜片式水泵控制阀 DN600 P=1.0MPa台914膜片式水泵控制阀 DN250 P=1.0MPa台115电动组合(三片)式矿浆阀 DN600 P=
14、1.0MPa台916双偏心金属硬密封电动蝶阀 DN600 P=1.0MPa台117桥式起重机 Lk=28.5m Qt=16t台118铁皮抓斗 V=2.5m3 台119SG手动单轨小车 Qt=5t台1二.施工方案1.基础验收 在接到工序交接单后,应对接到具备安装条件的基础进行复测,主要复测内容:1)基础不得发生倾斜,表面应无孔洞,麻面,不漏筋.2)基础表面及地脚螺栓孔内的模板必须拆净,螺栓预留孔内无异物、碎石等,孔内如有积水、油污必须清除.3)根据蓝图所给的尺寸,对基础的几何尺寸、螺栓孔距、预埋件数量、预埋件位置、标高、表面不平度进行复测.4)所有的基础必须有明确的标高点,坐标位置的纵横轴线,复
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 施工 组织上 设计 旋流井
链接地址:https://www.31ppt.com/p-4814174.html