qo人三工挖孔桩超深专项施工方案 2.doc
《qo人三工挖孔桩超深专项施工方案 2.doc》由会员分享,可在线阅读,更多相关《qo人三工挖孔桩超深专项施工方案 2.doc(39页珍藏版)》请在三一办公上搜索。
1、step shape, control of step size, set aside a decoration project, to run up and down the stairs the same faade stepping angle. 4.4 reverse triangular plate is in the Middle bench, reinforcement time side boards. Reverse triangular plates consist of a number of triangular pieces of wood nailed to the
2、 wood, and two triangular wood blocks high and wide of the right angle equal to step on a side, timber section for 50mmx100mm and third corner Board with bench support cross-ridged fixed between the side plates. 4.4 (1) expansion joints template support set: first support good expansion joints side
3、of wall template (wall sides are for multilayer Board), stay its concrete pouring Hou, will its template demolition, again support another side wall template, but this wall by expansion joints side with 200 thick high-density squeeze plastic poly benzene Board for template, another side for multilay
4、er Board, expansion joints North-South State surface the with 200x200 thick multilayer Board box for across die, to control expansion joints of upper and lower vertical degrees. 4.4 (2) treatment of construction joints: this construction is not the principle of construction joints, such as construct
5、ion joints, subject to the following requirements: construction joint in beam and plate with steel mesh or wood-mode blocked. Attention to the retention of construction joints must be perpendicular to the axis of the beam and plate, shall remain oblique Cha. Before the next concrete pouring, constru
6、ction joints of concrete should be cutting hair, and loose stones should be left floating pulp, water and moist. 5 construction considerations 5.1 template installation, upper and lower column formwork system should be installed on the same vertical line. 5.2 templates on each floor after installati
7、on, should release agent brush template. 5.3 for the joints is greater than 2mm, paste the crack tape. 5.4 no hard hit when stripping pry, to prevent damage to the template and the pouring of concrete. 6 quality standard for reached concrete of standard, we according to concrete structure engineerin
8、g construction quality acceptance standard (GB50204-2002) developed has internal control standard, as Xia by shows: concrete quality internal control standard project allows deviation national standards internal control standard axis location 5 3 end of die Shang surface elevation 5 3 adjacent two B
9、oard surface level poor 2 2 surface flat degrees 5 3 pre buried plate center line location 3 3 pre buried tube, and reserved hole center line location 3 3 pre buried bolt center line location 2 2 Exposed length +10,0 +10,0 reserved hole center line position 10 10 section size +10,0 +10,0 reinforcing
10、 the centerline location 5 5 exposed length +10,0 +10,0 die frame support must have sufficient strength, rigidity and stability, supporting parts must have sufficient support area. Template size is accurate, seam marks neat and orderly. Structures of yin and Yang founder straight, joint width shall
11、not exceedWe will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight
12、role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zer
13、o resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant
14、 role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To
15、strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career he
16、alth medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the bu
17、siness of zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should
18、; to implementation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further st
19、andardize trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve perf
20、ormance management. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full pl
21、ay levels cadres in enterprise development in the超深人工挖孔桩专项施工方案报审表工程名称:六盘水市钟山区凤凰新苑公租房 致: 贵州正业工程技术投资有限公司 :(监理单位)我方根据施工合同有关规定完成了 纳雍县左鸠嘎乡福和希望小学超深人工挖孔桩专项施工方案的编制,并经我单位上级技术负责人审查批准,请予以审查。附件:超深人工挖孔桩专项施工方案 承包单位(章): 项 目 经 理: 日 期: 专业监理工程师审查意见:专业监理工程师: 日 期: 总监理工程师审查意见:项目监理机构: 总监理工程师: 日 期: 纳雍县左鸠嘎乡福和希望小学超深人工挖孔桩专项施
22、工方案编制人: 职务: 校对人: 职务: 审核人: 职务: 审批人: 职务: 四川金海建设有限公司二一二年二月二十五日and tamping, clear template prior to placing the debris, and water wet template; control since the height of the concrete shall not exceed 1.5M; dense wall bushing with the same level of fine aggregate concrete for pouring concrete pouring,
23、pouring top layered slopes and adjacent two layers of pouring interval must not exceed 1h. Strengthen the maintenance of waterproofing concrete, the baseboard after the concrete has been poured, immediately cover it with plastic sheeting and strengthening conservation. Strengthen the construction qu
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- qo人三工挖孔桩超深专项施工方案 qo 人三工挖孔桩超深 专项 施工 方案
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4813144.html