xk新汴河第五期石梁河地下涵拆除重建工程施工组织设计.doc
《xk新汴河第五期石梁河地下涵拆除重建工程施工组织设计.doc》由会员分享,可在线阅读,更多相关《xk新汴河第五期石梁河地下涵拆除重建工程施工组织设计.doc(154页珍藏版)》请在三一办公上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .新汴河第五期石梁河地下涵拆除重建工程 施工组织设计新汴河第五期治理工程石梁河地下涵土建标施工
14、组织设计编制: 审核: 批准: 中国水利水电第十三工程局新汴河第五期石梁河地下涵拆除重建工程项目经理部2014年11月15日目 录第一章 综 述61.1编制依据61.2编制指导思想61.3编制内容61.4项目成果目标7第二章 工程概况及施工条件72.1工程概况72.2主要工程项目、工程内容及工程量82.3水文气象及工程地质条件102.4施工条件11第三章 对工程认识与理解123.1对工程施工重点的理解与认识123.2对工程技术关键点的理解与认识13第四章 施工总平面布置154.1施工总平面布置说明154.2混凝土拌和、运输系统154.3砂石料系统164.4预制场164.5模板及钢筋加工运输17
15、4.6堆土区及弃土区184.7机械停放场184.8施工交通道路184.9施工临时用房194.10施工供水、供电和供风194.11 通讯20第五章 施工总进度计划与工期保证措施215.1施工进度安排原则215.2工期目标与控制性工期215.3施工总体布署及资源配置计划215.4关键线路及施工进度网络图225.6施工总进度计划235.7工期保证措施235.8抢工措施24第六章 施工测量方案266.1测量准备工作266.2施工测量的内容和要求266.3平面控制测量286.4水准控制测量296.5轴线与高程基准桩点埋设296.6施工测量质量控制30第七章 施工导流、降排水及度汛327.1施工导流327
16、.2施工围堰327.3施工降排水347.4施工防汛方案38第八章 土方工程施工方案408.1概述408.2土方平衡408.3基坑开挖方案设计418.3.1基坑开挖工作内容418.3.2基坑设置方案418.4土方施工总体方案428.4.1土方开挖428.4.3土方填筑48第九章 拆除工程559.1拆除施工概况559.2拆除方法选择559.3拆除方案559.4拆除安全保证措施56第十章 砼及钢筋砼工程5710.1砼工程概况5710.2砼工程施工总体部署5710.3主要工程施工方案6310.4砼工程施工技术措施7010.5砼冬、雨季施工措施76第十一章 砌体工程施工方案7811.1概述7811.2材
17、料选择7811.3砖砌体施工7911.4浆砌石施工8011.5干砌石施工8111.6混凝土预制块护坡8211.7碎石垫层、反滤料工程8311.8保证块石护砌表面美观的措施8311.9质量检查和验收83第十二章 建筑与装修工程施工8512.1概述8512.2砼结构施工8512.3装饰工程施工方案8512.4质量通病防治措施8912.5质量检查和验收90第十三章 金属结构安装工程9113.1施工范围及内容9113.2闸门安装及调试9113.3手电两用卷扬式启闭机安装与调试9413.4 250KN双钩同步电动葫芦安装施工95第十四章 机电设备安装工程9714.1工作施工内容9714.2引用的标准97
18、14.3变压器安装9814.4低压配电柜安装9914.5电缆敷设及安装10314.6防雷接地装置安装10714.7照明系统设备安装10814.8柴油发电机组安装10914.9计算机监控系统设备安装调试111第十五章 施工资源计划11315.1主要施工设备计划11315.2试验检测设备计划11415.3劳动力需要计划115第十六章 施工组织体系11516.1施工组织布署11516.2项目部各部门职责11616.3项目管理模式118第十七章 质量保证措施12017.1质量管理目标12017.2质量保证体系12017.3工程施工质量保证措施12217.4冬、雨季施工方案125第十八章 安全保证措施1
19、2818.1安全管理目标及防范重点12818.2安全保证体系12818.3风险管理12918.4工程施工安全保证措施13118.5现场突发性事件的应急措施134第十九章 文明施工和环境保护措施13819.1文明施工和环境保护方针与目标13819.2文明环保组织机构及其职责13819.3主要的污染防治对策13919.4文明施工措施141第一章 综 述1.1编制依据1.1.1合同文件、设计图纸、技术要求及工程地质报告。1.1.2国家、行业及相关的工程建设规范、规程、标准。1.1.3安徽水利开发股份有限公司按ISO9001系列标准编制的质量、环境、职业健康安全管理手册和质量、环境、职业健康安全管理体
20、系程序文件。1.1.4现场条件及水文、气象资料。1.1.5我公司以往的施工经验和现有施工能力。1.2编制指导思想1.2.1以满足业主对施工工期、工程质量及安全生产、文明施工的要求,以及国家环境保护与水土保持的法规为前提。1.2.2以深化细化施工程序、施工方法、施工进度、设备配备,保证措施的先进性、合理性、可靠性为关键,把保证工期、创优质工程及文明施工建立在科学可行的技术基础之上。1.2.3以“精”和“严”为准则,对施工全过程的各种活动进行高标准控制,即方案上“精益求精”、工艺上“精雕细刻”、配合上“精诚合作”,管理上“严格要求”、“严格监督”、“严格奖惩”。1.3编制内容我公司认真研究了合同文
21、件、设计图纸、技术要求、水文地质以及工程现场条件,明确了指导思想,据此编制施工组织设计,分别就工程施工条件、对工程施工重点及技术关键点的理解和认识、施工总平面布置、施工进度及保证措施、主要工程施工方案、金属结构及机电设备安装施工方案、质量保证措施、施工组织体系,主要设备及劳动力计划、安全文明施工及环境保护、安全度汛方案等进行了详细的阐述。1.4项目成果目标项目施工中将集中公司精干力量和精良设备,科学实施“干一项工程、树一座丰碑”的项目经营战略,按照“建精品工程、创文明工地”的总要求,采取切实可行的措施,确保实现以下管理成果目标:1.4.1工期目标:施工工期从2014年10月15日进行施工准备工
22、作,2014年10月15日开工至2015年10月14日完工。计划施工工期365日历天。主体工程具备通水条件:2015年4月30日;完工:2015年10月14日。1.4.2质量目标:确保合格,争创优良。1.4.3安全目标:确保本工程不发生重伤以上的安全事故。1.4.4文明施工:本工程创建文明工地。1.4.5环境保护:遵守国家环境保护法律、法规和规章制度,做到水土不流失,施工不造成环境污染。第二章 工程概况及施工条件2.1工程概况新汴河是一条上世纪60年代末人工开挖的河道,工程自七岭子截沱河,经宿州市埇桥区、灵璧县、泗县及江苏省泗洪县入洪泽湖溧河洼,干流全长127.1km,流域面积6562km2,
23、具有防洪、排涝、灌溉、供水、航运等综合效益。新汴河经过四十多年运行,存在河道泄洪能力衰减、堤防险工险段多、堤身防洪标准降低、切岭边坡出现隐患、地下涵排水能力不足等问题。为恢复新汴河防洪除涝能力,保护两岸人民群众生命财产安全,保障经济社会持续稳定发展,实施新汴河第五期治理工程是十分必要的。本次治理内容主要为小余闸等19座穿堤建筑物重建或加固工程;徐岗切岭进口至团结闸段新汴河河道治理;徐岗切岭段滑坡处理;石梁河地下涵拆除重建工程。综合分析确定工程等别为III等,堤防工程级别为3级,建筑物级别为3级。新汴河是一条上世纪60年代末人工开挖的河道,工程自七岭子截沱河,经宿州市埇桥区、灵璧县、泗县及江苏省
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- xk 新汴河 第五 梁河 地下 拆除 重建 工程施工 组织设计
链接地址:https://www.31ppt.com/p-4808107.html