XX高速实施性施工组织设计 (很有用).doc
《XX高速实施性施工组织设计 (很有用).doc》由会员分享,可在线阅读,更多相关《XX高速实施性施工组织设计 (很有用).doc(64页珍藏版)》请在三一办公上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the贵州省公路工程总公司 施工组织设计 GUIZHOU HIGHWAY ENGINEERING CORP. 实施性施工组织设计一 工程概况(一)、项目特征:本工程为沪蓉国道主干线湖北宜昌至恩施公路第25合同段,起讫桩号为K151+200K163+950,全长12.776Km。工程以桥梁为主,兼有大量的挖填方、隧道及涵洞。桥梁密布是本合同段的最大特点。桥梁墩高,跨多,结构形式多样而地形狭窄。路基挖方以石方为主,兼有深挖高填。(二)、地形、气候特征:本合同段地处山岭区石灰岩地段,岩溶非常发育,路线起伏较大。该地段为岩溶地区,
22、在施工中主要存在的问题有因地下岩溶水的活动或因地下水的消水洞穴阻塞,导致路基基底冒水、水淹路基、水冲路基等病害。本合同段属亚热带大陆性夏热潮湿气候区。气温月季变化为1月份最低,7月份最高。路线所经区域水资源丰富,可分为地表水和地下水两类。路段内地质构造断裂比较发育。(三)、施工条件:路线基本顺318国道走向展开,并在段内与318国道两次相交,另有省道红建线也与合同段相交并通过红岩寺互通形成连接,段内还有多条机耕道直接到达工地,稍作加固便可利用,且全段路线均接近318国道,新修进场便道也较方便。所以,本合同段运输条件较好。本合同段内的高低压电线,通迅光缆,输气管道,水库的灌溉水管交叉穿行,为工程
23、的施工也带来相当大的难度。本合同段地处建始县红岩镇,离建始县城28km,离恩施78km,虽然交通发达,但大量材料需从建始或恩施购买,对工期和成本造成影响。工地内地材丰富,再结合我们长年在该类型的地形地质条件施工,有成功的地材特别是机制砂的加工经验和成熟的生产技术,施工中在保证质量的同时能充分地利用废弃的经试验合格的石方进行再加工,为减少弃方和控制成本提供了有利条件。同时,路基施工中我们有山岭重丘区喀斯特地貌地区施工的经验和技术,桥梁施工中我们有挖孔石质桩基的先进经验和技术等明显优势,为加快工期奠定了一定的基础。本合同段内的红岩寺隧道进出口都有机耕道相通,且地形、地质条件均好,估计用10个月的时
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- XX高速实施性施工组织设计 很有用 XX 高速 实施 施工组织设计 有用

链接地址:https://www.31ppt.com/p-4799366.html