rs电力电缆隧道(明、暗挖)线路施工组织设计.doc
《rs电力电缆隧道(明、暗挖)线路施工组织设计.doc》由会员分享,可在线阅读,更多相关《rs电力电缆隧道(明、暗挖)线路施工组织设计.doc(126页珍藏版)》请在三一办公上搜索。
1、week a contact, and month a met service system of based Shang, gradually building a meet actual of leaders one-on-one and village (community) counsel service system. Speed up the nationwide network of two hubs, one stop-style common law system construction, to build a comprehensive public legal serv
2、ices centre, provide legal advocacy, legal advice, legal assistance, dispute mediation, such as one-stop legal service, effectively serve the people the last mile problem. Improve legal aid public satisfaction rate. Continue to increase legal aid efforts, broaden the field of legal aid services and
3、channels, the economic difficulties the complainants case registration system, gradually included in the scope of legal aid, lower thresholds, transition assistance to low-income groups by disadvantaged groups, so that should aid assistance and support aid. Sound district, town and village levels of
4、 legal aid network, pays special attention to legal aid volunteer team to form efficient and convenient legal aid for half an hour. Strengthening the civil service convenience and benefit. Legal service to the line, the administration of Justice and promote development and strengthening the practice
5、 of public letters promoting fairness and justice topics such as practical activities as the carrier continued holiday reservation certificate, notary green channel, online registration and a number of initiatives for the convenience, ensure that the notary to complete service zero distance. Receive
6、d and accepted strictly regulate notarization system strengthening sector collaborative linkage, improving the quality of notary to handle. Continue to implement civil revitalization, upgrade the quality of talents, business development, regulatory strengthening innovation, image optimization, servi
7、ce six projects, promoting the standardization of notarization. Five is working to enhance the administration of Justice and social satisfaction. Building a team of highly qualified police officers of administration of Justice, is to accomplish various tasks, strong organizational guarantee to achie
8、ve established goals. Strengthen team construction. Strictly implementing the theory of group learning plan, keep studying month system, enhance the relevance of learning, effectiveness. Adhere to the grass-roots level first-line investigation, deepening the three-three activities, linked to the imp
9、lementation mechanism, strengthen the team construction. Focusing on system improvement. Establish and improve the management system, System State, system management, System Manager, deepening the open, normative acts, strictly implement democratic centralism, strengthen management, strengthen super
10、vision, improve the overall quality. One is to further rationalize the judicial system. Implement the opinions on further strengthening the construction of judicial administrative, to straighten out the system, strengthening the personnel strength, improve the Office conditions, focusing on active o
11、perations, raise their social image, and vigorously promote the construction of judicial administrative, consolidate the establishment of the judicial administrative achievements. Increase evaluation efforts and adhere to the construction, management and work and guidance Division . Continues counte
12、r-four winds and consolidate the results of mass education activities, strengthen the style of efficiency construction. Carry out the demonstration, warning education, and job education, enhance the relevance and effectiveness of education,110kv沙坪坝温泉城输变电线路110KV电缆隧道工程 施工组织设计第一章 工程概况及特点1.1 工程简述本工程为110
13、kv沙坪坝温泉城输变电线路110KV电缆隧道工程, 本工程从220KV梨树湾变电站起,沿“L7”道路,途径重庆商报印刷厂、融汇小学、融汇酒店、融汇温泉城地段,止于110kV温泉城变电站已建电缆隧道接口,线路全长901.6m。 1) 明挖隧道为:梨树湾220KV变电站已建隧道接口为起点里程K0+0.00m段平面控制1号点(里程为K0+56.99m)段;3#接口竖井(里程为K0+817.59m)至设计终点(里程为K0+901.6m)段,埋深约在56米左右,总长141m。 2) 顶管段:平面控制1号点(里程为K0+56.99m)至2#接口竖井(里程为K0+314.59m)段,埋深约在10米左右,总长
14、257.6m。 3) 暗挖隧道为:2#接口竖井(K0+314.59m)起整段暗挖隧道穿越融汇酒店前人行道路及绿化地块,途经融了汇温泉洗浴中心公路转弯处至3#接口竖井点(K0+817.59m)结束,该段为暗挖深埋隧道,埋深在1620米左右,暗挖线路总长503m。1.2 场地工程地质及水文地质条件 1.2.1 地质构造 工程区域在构造上属扬子准地台(1)、重庆台坳(1)、重庆陷褶束(1)、华蓥山穹褶束(2),走廊由位于观音峡背斜南东翼的220KV梨树湾变电站出线,接入位于金鳖寺向斜南东翼。工程区域向斜紧束,背斜开阔,基岩由侏罗系中统上、下沙溪庙组底层组成,岩层斜角由南西向东逐渐变缓,岩层产状:50
15、555015。起点到终点岩层产状分别为:5150(起点-梨树湾变电站一带)、5146(拟建融汇温泉酒店一带)、5142(融汇温泉一带)、5120(融汇温泉变电站一带)。岩层层面较平直,无充填,结合较好,属硬性结构面。 经调查,场地发育有3组裂缝,裂缝J1产状:3305234557,间距1.003.00m,延伸2.0-3.0m,裂面较平直,张开2-5,mm,局部泥质充填,结合很差,属软弱结构面;裂隙J2产状2705029760,间距0.52.00m左右,延伸1.5-4m,裂面较平直,张开1-4mm,泥质充填,结合很差,属软弱结构面;裂隙J3产状32685585间距0.52.30m左右,延伸1.3
16、-3.8m,裂面较平直,张开1-3.5mm,泥质充填,结合很差,属软弱结构面;此三组裂隙主要分布于梨树湾变电站至内环高速这段。此三组裂隙主要分布在浅部基岩中,局部深部岩层中有分布。裂隙在浅层岩体中连通较好,深部连通较差。整个场地分析,裂隙不发育。根据重庆市区域地质资料及本次钻探,综合表现:本区未见断层构造及构造破碎带。 将工程划进行区域段划分。ZK1#ZK28#:岩层产状:51555015,发育有三组裂隙,即NNE,NE,NEE组,裂隙以陡倾角为主; 1.2.2 地层结构 场地地层结构为:覆盖层主要为第四系人工填土和坡残积粘土,局部地段存在砂层、淤泥、淤泥粘质土层,下伏侏罗系中统上、下沙溪庙组
17、泥岩和砂岩,现分述如下: 1) 杂填土:杂色,由碎块石、建筑垃圾和粘土构成,块石粒径大,多集中在53mm-100mm,最大粒径为138mm,含量占39,建筑垃圾系填筑路基而成主要为混凝土块,含量约占17,厚度大,均匀性差,松散-稍密状态,稍湿,系抛填而成,堆积年限为3-5年。主要集中于梨树湾变电站至融汇温泉,一般厚度3.613.2m。 2) 淤泥:黑色、黑褐色,呈软塑-流塑状态,包含少量黑色有机质成分,呈絮状结构,有较淡的臭味,湿润,主要分布梨树湾变电站靠近小河流一段和沙滨路小河流一段,勘查在ZK3钻孔发现厚2.0m。 3) 淤泥质粘土:灰色、灰褐色,呈软塑状态,絮状结构,含很少的细砂,约占5
18、左右,稍有光泽效应,无摇震反应,干强度低,韧性差,有腐殖质臭味,主要分布于梨树湾变电站一带,其厚度为0.604.90m。 4) 粘土:浅黄色、黄色,呈层状结构,含少量的细砂,约占总量的10,刀切面光滑,稍有光泽效应,无摇震反应,干强度好,韧性中等,主要分布于梨树湾变电站一带,其厚度为1.202.00m。 5) 细砂:浅黄色、黄色,由云母、石英和少量的长石构成,多呈椭圆状、边缘状,中粒含量约占18,级配差,稍密-中密状,湿润,主要分布于梨树湾变电站一带,其厚度为1.202.00m 6) 岩层:紫红色、红色,主要由粘土矿物构成,部分地方含石英、长石,夹灰绿色条带,泥质结构,薄-中厚层状结构,泥质胶
19、结,强风化岩层层面、节理、裂隙不发育,个别结构面张开,夹次生泥,沿芯呈碎块状,少量呈块状,完整性较差,易风化崩解,岩质极软;中风化呈中厚层状结构,岩层层面、节理、裂隙不发育,岩体较完整呈短柱状、柱状,完整性较好,部分地方较破碎,节长多集中在8cm-29cm,最长达37cm,易风化崩解,岩质软。强风化层厚1.304.30m。 7) 砂岩:浅灰色、灰色、青灰色,由石英、长石和云母构成,部分地方存在泥岩夹层,砂质结构,钙质胶结,强风化呈薄层状构造,岩体破碎呈碎块状、短柱状,节理、裂隙发育,岩质极软,力学性质差,强风化层厚1.503.10m。中风化层薄层-中厚层状结构,岩体较完整呈短柱状、柱状,节理、
20、裂隙不发育,节长多集中在7-25cm,最长达33cm,岩质较软,力学性质好。 该场地地层为内陆河湖相沉积,岩相变化较大,泥岩、砂岩根据含砂量多少、粒径大小可相变为粉砂岩、砂质泥岩夹层及透镜体,本次勘察根据场地实际情况将过度岩性分别归并为砂岩或泥岩。隧道场地泥岩与砂岩互层分布,以泥岩为主,砂岩次之。 1.2.3 地下水 水文地质条件:拟建场地处于构造剥蚀丘陵斜坡和低山地带,现状总体是西面低,东面高,场地地形有利于地表水与地下水的排泄。场区内杂天土、素填土、细砂和含碎石堆积土为强透水层,强分化泥岩和砂岩为弱透水层,粘土、淤泥质粘土和中分化泥岩为隔水层。根据地下水的斌存特征,线路穿过地区地下水,按含
21、水岩组可分为地下潜水、松散土类孔隙濳水、基岩裂隙水三类。 1.2.4 场地地貌环境 拟建隧道场地地貌单元属构造剥蚀丘陵斜坡和低山地貌,场地总体地势为东高西低,隧道场地,地面最高标高为249.54m(位于钻孔ZK27附近),最低标高为241.35m(位于河沟里),相对高差约8.19m,在梨树湾变电站出线处存在陡坡,坡角局部介于25度60度左右外,其余大部分路段地势较为平坦,地形坡角一般小于5度。 1.2.5 现场主要障碍物的调查 1) 在梨树湾220KV变电站已建隧道接口为起点里程K0+0.00m段至平面控制1号点(里程为K0+56.99m)段之间存在一条常年流水的清河溪,据现场了解,该段隧道施
22、工时将桩基施工在河里,可能会引起河内堵塞。 2) 顶管施工段,1#顶管工作井和2#顶管工作井竖井工作面存在地下管网,根据图纸及现场实际了解,有TR/PE管/110天然气管道、WS/PVC管500污水管道、YS/PVC管/500雨水管道、LD/铜/200100/2孔路灯管线埋设、草坪和绿化树木。 3) 暗挖隧道施工段:2#、3#、4#接口竖井工作面根据图纸及现场实际了解,有TR/PE管/110天然气管道、WS/PVC管500污水管道、YS/PVC管/500雨水管道、LD/铜/200100/2孔路灯管线埋设、草坪和绿化树木。 4) 在整个工程隧道沿线有一条常年流水的清河溪,常年流水量大,暗挖隧道开
23、挖可能出现隧道内渗水量大,施工难度加大。5) 在融汇温泉洗浴中心至融汇小学之间有一座刚刚开业的酒店,融汇公司不同意我方在该段开设井,因开设井位在施工期间影响美观,所以暗挖长度增加,无法保证该段的工期要求。6) 在整个工程的隧道沿线不管是明挖还是暗挖段,存在大量的绿化树木和草坪赔偿问题,协调难度相对较大,也是影响工期的主要原因。1.3.工程性质及特点 工程性质: 重庆市沙坪坝温泉城110kV电缆隧道新建工程是重庆市的重点工程建设项目,它的建成将缓解重庆市沙坪坝温泉城及高滩岩、巴山片区用电紧张的局面,保障电力系统的安全稳定。 工程特点: 1.3.1 施工工期紧 根据业主要求,本工程工期定为2012
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- rs 电力电缆 隧道 暗挖 线路 施工组织设计
链接地址:https://www.31ppt.com/p-4799043.html