xp中广核沽源黄盖淖风电项目监理大纲.doc
《xp中广核沽源黄盖淖风电项目监理大纲.doc》由会员分享,可在线阅读,更多相关《xp中广核沽源黄盖淖风电项目监理大纲.doc(223页珍藏版)》请在三一办公上搜索。
1、In order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions,
2、 make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student know
3、ledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, an
4、d so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police stat
5、ion, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always
6、 maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive
7、 measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctiona
8、l Centre, school principals consent, without organization. Without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent acc
9、idents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls,
10、ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are s
11、afe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is
12、 developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fire中广核张家口沽源黄盖淖风电场200兆瓦工
13、程 监理大纲1工程概况 1.1工程项目概况本工程根据规划的风电场区域和当地风力资源情况,以及交通运输和电力系统等条件,总装机容量为199.5MW,一次建成,其中133台金风82/1500机型。风力发电机采用一机一变的电气接线方式,将机端电压升至35kV,多台发变组的35kV侧通过集电线路接至风电场变电站35kV母线,全场共12回集电线路。1.1.1工程项目名称工程项目名称:中广核张家口沽源黄盖淖风电场200兆瓦工程1.1.2工程参建单位招标人:中广核风电有限公司招标代理人:中信国际招标有限公司投标人:张家口华纬电力建设咨询有限公司1.1.3工程概况中广核沽源黄盖淖风电场位于河北省沽源县黄盖淖镇
14、附近,黄盖淖镇位于县境西部,距县城34千米。平(定堡)半(拉山)公路过境。镇政府驻黄盖淖村。中广核沽源黄盖淖风电场装机规模为200MW,一次建成,共装设133台单机容量为1500kW的风力发电机组。风电场拟考虑以220kV电压等级接入系统,133台风力发电机组以35kV集电线路汇集至场内新建220kV升压站,出1回220kV线路至已建成的中广核友谊风电场220kV侧,与友谊风电场一起并入电网公司察北站220kV侧。中广核沽源黄盖淖风电场升压站距离中广核友谊风电场升压站约50公里。本风电场新建220kV升压站一座,装机规模为199.5MW。本期升压站主变容量按2100MVA考虑。 拟建场地地基岩
15、土主要海西期侵入花岗岩和太古界红旗营子群斜长角闪片麻岩、斜长角闪岩,场地均匀性良好;场地及周围无不良地质作用,场地稳定性较好,适宜本工程建设。勘察期间在勘探深度内未发现地下水,本场地可不考虑地下水对建筑材料的腐蚀性问题。拟建场地抗震设防烈度为7度,设计地震分组第一组,设计基本地震加速度值为0.10g。拟建场地土类型为中硬土,类场地。设计特征周期值为0.25s。本区标准冻深为2.20-2.30m,最大冻深2.80m。1.2.1工程项目1.2.1工程项目组成本工程由以下项目组成:(1)施工道路、支线道路、基础平台开挖、回填工程、路面工程;(2)35KV集电线路工程;(3)风力发电机组吊装工程;(4
16、)箱变安装工程;(5)防雷接地工程;(6)风机及箱变基础工程;(7)设备进场道路改造工程;(8)220kV升压站电气设备安装工程;(9)220kV升压站土建工程;(10)220kV升压站装饰装修工程;(11)220kV送出输电线路工程(12)植被恢复(水土保持)工程。以及为完成上述工程所必须的临时工程等。1.2.2合同控制目标1.2.2合同控制目标及监理依据一、监理目标我公司将依据国家有关工程建设现行的法律、法规、行业规范和行业标准,以及本工程合同文件、设计文件对沽源黄盖淖风电场工程建设的质量、进度、投资、安全、环境保护、水土保持等进行有效控制和管理,协助业主确保本工程建设按合同目标顺利进行,
17、切实实现工程建设的质量、进度、投资、安全文明施工、环境保护、水土保持等控制目标。本项目监理服务的目标是对沽源黄盖淖风电场工程进行施工总目标控制,实现本工程项目的投资造价控制目标、进度目标和质量目标,通过项目的风险分析管理、项目目标规划和项目目标的动态控制,使沽源黄盖淖风电场工程项目的实际资金不超过概算资金,实际建设总工期控制在合同计划工期12个月以内,工程质量达到合格并争创优良工程。具体为:投资造价控制目标:实际资金投入不超过概算资金。进度控制目标:实际工期控制在合同工期12个月以内。质量控制目标:保证合格,争创优良。安全管理目标:现场安全文明施工状况良好,实现人身死亡事故“零目标”,确保不发
18、生以下事故:1. 不发生人身死亡及群伤事故;2. 不发生特大、重大、机械设备事故;3. 不发生恶性误操作事故;4. 不发生重大火灾事故;5. 不发生重大的交通责任事故;6. 不发生特大的环境污染事故;环保目标:达到国家有关标准要求。督促承建单位做好对工程建设区域的环境保护,减少对当地生态环境的破坏和影响,达到施工承包合同的有关要求。合同管理目标:严格依据合同,杜绝违反合同事件。信息管理目标:完整、系统、准确,信息处理及时率达100%。协调目标:解决矛盾,避免冲突,保证建设总目标的顺利实现。二、适用法律、法规、规章和监理依据本工程监理依据为与电力建设工程项目有关的法律、法规、规章、规范和工程建设
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- xp 中广核 沽源 黄盖淖风电 项目 监理 大纲
链接地址:https://www.31ppt.com/p-4798334.html