ql四眼井8 楼施工组织设计.doc
《ql四眼井8 楼施工组织设计.doc》由会员分享,可在线阅读,更多相关《ql四眼井8 楼施工组织设计.doc(103页珍藏版)》请在三一办公上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .中国第四冶金建设有限责任公司 四眼井万象广场8#楼施工组织设计方案 工程名称:新余四眼井万象
14、广场8#楼工程地址:新余市城南胜利南路施工单位:中国第四冶金建设有限责任公司编制单位:中国第四冶金建设有限责任公司编制人: (技术负责人) 审核人: (项目经理)审批人: (技术负责人) 编制日期 年 月 日 第1章 工程概况1.工程概况1.1工程名称:新余四眼井万象广场8#楼1.2 建设单位:新余福燊实业有限责任公司1.3建设地址:新余市城南胜利南路四眼井1.4建设规模:8#楼总建筑面积28240m21.5万象广场8号楼建筑层为 32 层,地下室 1 层,商铺 3 层1.6建筑性质:本工程建筑结构类别为 1 类,其中地下室 1类,使用年限 50 年,抗震设计等级小于 6 级,其耐火等级 1
15、级,地下防水等级 1 级。1.7结构概况:本工程采用框剪力墙结构,安全等级为二级,基础类型为人工挖孔桩基础,本工程砼采用商品砼,钢筋采用新钢、南钢、萍钢(HPB235、HPB335、HPB400)级钢材,外墙填充采用 200厚粘土空心砖 (容重小于17.0kn/m)或mu10烧结多孔砖,砂浆为m5.0混合砂浆,墙厚详见施工图,内墙采用 200厚粘土空心砖 (容重小于17.0kn/m),砂浆为m5.0混合砂浆,墙厚详见施工图,标高0.000以下砌体采用m10强度等级的水泥砂浆,mu10粘土实心砖墙。2.建筑工程概况:2.1地下防水地下室底板侧、顶板均采用钢筋砼,设计抗渗等级为P6,防水等级为一级
16、,地下室侧、底板均采用SBS自粘防水卷材,按图施工,屋面防水,商业防水,住宅防水材料全部采用SBS卷材,型号400K,找坡材料选用水泥陶粒砼,保温隔热材料采用挤塑聚苯乙烯泡沫塑料板,具体位置及屋面排水组织见建筑施工图。附屋面做法图第2章施工组织部署1.项目经理部组建1.1 现场成立新余四眼井万象广场工程项目经理部,实行项目经理负责制。项目经理部代表公司在现场服从业主、监理单位的管理,对业主履约。1.2 选派政治思想素质好,业务水平高,身体健康,经验丰富的工程技术人员、经济管理人员,组成项目经理部。项目经理、现场负责人、项目技术负责人善于管理,熟悉工程施工及组织管理工作。选派管理人员遵循少而精,
17、一专多能的原则。1.3.施工管理组织机构 项目经理 项目副经理技术负责人 施质技财材行机水 工安术务料政械电 科科科科科科队安 装 队 1.4 项目经理部人员配备及职责分工序号岗位人数职责1项目经理1管理日常工作2现场负责人1协助项目经理管理,生产计划、劳动力调配3项目技术负责人1技术、安全、试验、机械设备负责4施工员3土建、水电现场施工管理5测量试验员1测量放线及材料试验6质检员2质量负责、助理工程师7资料员(兼计量员)1资料收集整理、试验8机管员1管理机械设备和机操员9材料员1材料收验及保管10财务负责人1资金管理11预算核算员1工程预算、核算12安全员2安全管理1.5项目经理部各职能部门
18、职责1.5.1 项目经理岗位1) 负责实施工程承包合同,确保合同目标的全面完成,对施工现场生产、安全、设备、质量全面负责。2) 组织项目部人员学习、贯彻、实施质量体系文件,对本司质量体系在项目部的运行负全面责任。3) 组织实施施工组织设计或项目质量计划,实施进度控制。4) 负责签订劳务分包合同,指挥、协调各分包单位的施工,确保总的质量目标的实现。5) 定期将合同执行情况及对分承包方的评价上报经营处。6) 负责组织对新进场人员进行职业道德、质量意识和安全生产的教育。7) 组织编制、收集工程技术资料,做好工程竣工交付工作,竣工验收后移交给工程处。8) 负责做好工程质量回访和保修服务。9) 负责统计
19、技术的实施。1.5.2项目技术负责人岗位1) 按工程处提出质量目标和要求,组织编制施工组织设计(质量计划),审批通过后向项目有关人员进行交底,并在施工中督促检查。2) 组织有关人员熟悉施工图纸,并参加图纸自审和会审,负责将“图纸会审记录”中结论意见在各份图纸上作出修改,加盖“修改专用章”。3) 参加工程中间验收(基础、主体)和竣工工程预验收。4) 参与对重大和重要不合格品的评审工作,主持一般不合格品的评审和处置,负责向顾客通报并提出让步申请。5) 负责对一般不合格品纠正措施的验证,提出有关预防措施。6) 负责在特殊过程施工前向班组做好设计交底和技术交底工作。7) 对技术复杂和特殊产品的搬运,制
20、订搬运方案,对产品防护提出要点和必要的技术间歇时间要求,并负责向施工班组进行交底。8) 审核分承包商提供的施工组织设计(方案)等技术文件,对工程分承包方进行技术、质量、安全的交底工作,并在施工中严格检查、监督。9) 协助材料员做好进场材料中需要进行复试的送检工作。1.5.3项目施工员岗位1) 熟悉施工图并参加图纸自审和会审工作,贯彻各项施工规范、规程和标准。2) 编制质量计划或施工组织设计、进度控制计划和年、月生产计划以及劳动力、材料、机械设备需用量计划,并负责实施。3) 负责对施工班组的技术、质量、安全交底和指导工作,并在施工过程中严格检查、监督。4) 做好施工日记和混凝土施工日记,收集好可
21、追溯性质质量记录。5) 做好各类复查、技术复核工作。6) 对分包单位、专业工种、施工班组做好协调工作,确保按照标准进行施工。7) 负责施工联系单的签发和接收。8) 负责工程质量问题整改的实施以及统计技术的应用。9) 负责做好产品的防护工作。10) 负责分部、分项、单位工程的质量自评工作,及时收集整理单位工程的竣工验收资料。1.5.4项目材料员岗位1) 根据工程进度计划,编制物资采购计划,报工程处审批。2) 负责进场产品的检验、标识、贮存、防护、分发工作并做好记录。3) 编制顾客提供产品需用计划,负责顾客提供产品的进场检验、搬运、贮存、标识工作,并做好记录,保存有关资料,竣工验收后移交工程处。4
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ql四眼井8 楼施工组织设计 ql 四眼井 施工组织设计
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4796008.html