so耿达水电站闸首边坡及河道疏浚工程施工组织设计.doc
《so耿达水电站闸首边坡及河道疏浚工程施工组织设计.doc》由会员分享,可在线阅读,更多相关《so耿达水电站闸首边坡及河道疏浚工程施工组织设计.doc(139页珍藏版)》请在三一办公上搜索。
1、collection, storage, protection facilities can not meet the archives in the new era, the collection, collation, protection requirements, especially the lag of archive information management. 2, a part-time archivists of training and learning there is still a lack of the knowledge structure of archiv
2、ists is not comprehensive enough, still can not meet the needs of archives work, in-depth development of the archives work. Measures to solve the Bureau will in future work of archives management to be improved effectively. One is to overcome the shortage of personnel difficulties, concentrate on fi
3、nishing a good historical archives. The second is to further strengthen archives management training efforts, focusing on the study of archives management, utilization and archives laws and regulations etc. Knowledge to further enhance archival consciousness of cadres and workers and do a good job i
4、n the consciousness of the archives work, improve the efficiency in the use of archives. The third is to further improve the level of archives management equipment, with the continuous development of the archives work, overcome the financial resources, lack of material enlarged the file management o
5、f equipment investment. In a word, on the basis of insufficient to improve, global will work together, I Bureau of archives management work standardized track to play of archives work in the protection of peoples livelihood, improve the livelihood of the people, the fundamental role of serving the p
6、eoples livelihood.XX County Culture and sports and News Publishing Bureau is responsible for the main work is the work of sports culture, press and publication work. In order to further improve my bureau of agriculture related funds management, strengthen regulation of agriculture related funds, imp
7、rove efficiency in the use of agriculture related funds, effectively improve and enhance the peoples production and living standard of people. According to the (precious Zhengban pass 2015 No. 40) the spirit of the document, I Bureau in a timely manner to global within the scope of agriculture relat
8、ed special funds for the project source, uses, use of self-examination and self correction, self inspection shall be reported to the Sue.A work of self correction, agriculture related funds (a) report of lottery funds of agriculture related funds of self-examination and rectification workThe cat cha
9、se chase chase were received by 2013 the lottery public welfare fund project funds use: I Bureau Finance Bureau file your wealth 2013 No. 603 file, your wealth 2014 45 file. Your wealth 2014 45 file notice: 2013 farmer sports fitness project and village level public service basketball field construc
10、tion capital of 690 million yuan, of which (Wei Dong Tang Cun, Li Xiang Xin Cun, Li Xiang Fu Tuan Cun, Li Xiang Tan Yang village, Hong Cheng Zhen Shan Cun, Qingfeng Zhen Tai Xing Cun 1.15 million yuan). The funds have been the County Finance Bureau of the budget shares issued directly to the townshi
11、p wealth County tube office, has been allocated to the township specific units . your wealth chasing 2013 document No.耿达水电站闸首边坡及河道疏浚工程 卷3施工组织设计、项目管理机构、拟分包项目情况表投标代表: 批准人: 审核人: 编制人:603 notice: lottery public welfare funds support the place of sports funding 46.05 million yuan. Among them: (a) 2013 far
12、mer sports fitness project and the two project 12.6 million yuan, including (Qing Feng Zhen Qing Ling Cun Da Qiao Tun, Hong town Wanghuacun Wang Gang Tun, Qing Feng Zhen Da Tong Cun Ma Tun, Wei Zhen Da Lian Cun Lian Tang tun the 3.15 million yuan); (II) 2013 Township farmer sports fitness project si
13、te construction funds 27.45 million yuan, including (XX town, Qingfeng County, XX County Township, XX County, the stone village the 9.15 million yuan); (three) in 2013 Urban and rural landscape transformation of the fifth phase project of village basketball field construction funds subsidy of $6 mil
14、lion, including (Qing Feng Zhen Qing Ling Cun Xi Tun, Hong Cheng Zhen Shi Zhai Cun, Da Wei Zhen Da Wei cooperatives in the county 2 million yuan). These funds has the County Finance Bureau budget shares issued by the Bureau, the Bureau has allocated by township wealth County tube office moved to the
15、 township specific units.2014 the lottery project funds use: I received Finance Bureau file your wealth chasing 2014 document No. 453. Your wealth chasing 2014 document No. 453 notice: lottery public welfare funds support the place of sports funding 19.45 million yuan, including: (a) 2014 farmer spo
16、rts fitness project township level basketball field construction funds of 13.45 million yuan (XX County township of 13.45 million). The fund the fund has County Bureau of finance budget shares issued directly to township wealth County tube office, has allocated to Xiang; (II) XX Chaoyang County yout
17、h sports club funds 6 million yuan. Due to Through inquiry, higher-level units, existence of juvenile sports clubs dont know Chaoyang, juvenile sports clubs dont know Chaoyang specific account, username, account, so County Bureau of finance budget shares has not issued the capital budget. (two) repo
18、rt of rural social undertakings and public service related funds of self-examination and rectification workAgricultural use of project funds: the financial sector arrangement project, cultural station free of special funds, which belongs to the rural social undertakings and public service. I receive
19、d Finance Bureau file your wealth chasing 2013 146; your wealth chasing 2013 303; your wealth chasing 2013 221; your wealth chasing 2014 59 notice.2013 year and 2014 annual budget funds are 36.5 million yuan, Sports Bureau unified management of the use of funds, cultural stations by activity materia
20、l reimbursement. Project support object, project implementation units are harbor town, Da Wei Zhen, Zhen Qing Feng root Township, In Li Xiang, the stone village, Wu Yue 7 township cultural station. The second is rural cultural construction of special funds, which belongs to the rural social undertak
21、ings and public service. I received to finance bureau file my bureau were sent to your wealth chasing 2013 163; notify your wealth chasing 2013 550, 2013 annual pre settlement funds is 79.8 million yuan, the use of funds is mainly transferred to place of finance of villages and towns each administra
22、tive village accounts by the township caiban. Project support objects and the county of 105 administrative villages.- 133 - 中国水利水电第八工程局有限公司 目 录一、施工组织设计二、项目管理机构三、拟分包项目情况表四、偏差表一、施工组织设计目 录一 、工程概况及项目实施条件分析1.1工程概况1.2工程特点及施工条件分析1.3项目管理特点及总体要求1.4主体工程施工方法和临时设施等的施工规划说明1.4.1 主体工程施工方法1.4.2 临时设施等的施工规划二、施工现场平面布置
23、及工地管理2.1施工平面布置2.2工地使用权和出入权2.3工地管理方案与制度三、施工现场管理机构及其职能3.1施工组织管理体系及其职能3.2关于各单位之间的协调与信息流向四、工期目标和施工进度控制4.1工期目标4.2进度计划编制说明4.3进度计划图表4.4进度计划风险分析及控制措施4.5总体控制及保证投标工期提前实现的措施五、资源配备计划5.1技术准备计划5.2劳动力需求计划5.3主要施工机械、工器具需求计划5.4主要材料需求计划5.5成本控制及资金计划5.6生活与办公用品计划六、质量保证措施6.1质量方针6.2质量目标和创优计划6.2工序施工及控制方法6.3质量目标保证措施七、安全保证措施、
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- so 水电站 闸首边坡 河道 疏浚 工程施工 组织设计
链接地址:https://www.31ppt.com/p-4795539.html