ra化水薄腹梁和屋面板吊装施工方案10.doc
《ra化水薄腹梁和屋面板吊装施工方案10.doc》由会员分享,可在线阅读,更多相关《ra化水薄腹梁和屋面板吊装施工方案10.doc(13页珍藏版)》请在三一办公上搜索。
1、quality accident of construction can occur. 3.10 summary quality improvement system for a week on a regular basis the quality of construction of the project for a comprehensive measurement and evaluation, the use of statistical techniques in quality scientific statistical methods, identifying the pr
2、incipal contradiction. To find out the major quality problems and quality problems by the relevant departments to seriously study, find out ways to solve the quality problems and take corrective and preventive action. 3.11 quality rewards companies for projects, construction crews and other layers o
3、f quality responsibility documents signed, linked with the economy. Clear rewards and punishments, strictly cash. 3.12 quality return system to track the quality of completed operations, monitoring, and problems with corrective action in a timely manner, and recorded for analysis in order to improve
4、 the experience for the future construction level. 4, quality control system: establishment of perfect quality control system. Comprehensive understanding of engineering quality control points, develop specific comprehensive quality control measures, clear quality control responsibilities, company,
5、Department, three-level quality control system in the construction area of the project. Concrete quality control system block diagram. 4.1 quality control principles: (1) quality control follow the prevention first principle, insisting on quality in advance control, eliminate hidden quality in spurt
6、s stage. (2) adhere to the high standards of quality assessment, and all data is strictly prohibited on imagination-do. 4.2 quality control: quality control procedures, see next page. Quality control elements list construction prepared process a design low-down 1 drawings since trial project technic
7、ians drawings information whether complete, whether meet construction need drawings technology file a, 2 design low-down project technology head understand design intent proposed problem drawings technology file design low-down records 3 drawings triage project technology head on drawings of integri
8、ty, and accuracy, and feasibility for triage drawings technology file drawings triage records II developed construction process file 4 construction organization design project technology head by related file requirements prepared construction Organization and standard approval drawings for approval
9、of construction organization design of 5 construction plan project technical personnel above drawing standards proposal . Officer for check acceptance, through the layers of quality control to ensure that the project meets quality standards. 3.9 breach of construction regulations, construction techn
10、iques according to the person in charge of construction quality accident reporting system specifications, design and construction process guide the construction personnel, shall not be an illegal command. The operator must operateDelegates, staff: Hello! in the run-up to the Spring Festival, we held
11、 one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power compani
12、es adhere to the partys 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business man
13、agement and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 31
14、5 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. -Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major
15、 fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an
16、increase of 1.76 million Yuan, FCM assessment at grade four. -Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfu
17、r dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. -Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, w
18、e should adhere to the two management system basis, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two management system for improvement. Focus on promoting the power of the company management system and the a
19、pplication and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision a
20、nd management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other 工程名称:徐塘发电厂技改工
21、程 机组容量:2300MW 编 号: 类 别:作 业 指 导 书作 业 项 目 名 称出 版 日 期审 核批 准编 写审 定 编写单位会 审江 苏 省 电 力 建 设 第 三 工 程 公 司作 业 指 导 书第 页 共 页 作 业 指 导 书 名 称作 业 单 位班 组作 业 指 导 书第 页 共 页1、 概述1.1工程概况1.1.1徐塘发电厂技改工程2300MW化水处理室和化水试验楼,由江苏电力设计院设计,位于主厂房西边,呈“L”型布置。化水车间与水泵间组成高低跨的单层框架结构,平面尺寸为“60m21m”,化水车间为高跨结构,跨度为13.5m,檐口标高为8.750m,水泵间为低跨结构,檐口标
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ra 化水薄腹梁 屋面板 吊装 施工 方案 10
链接地址:https://www.31ppt.com/p-4795165.html