1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the人行天桥垂直绿化工程施工组织设计技术标投标文件第二部分目录编制说明 (1)工程概况 (3)(一)确保工程施工的必要组织措施 (5)施工准备工作 (5)1、劳动力安排情况描述 (14)2、劳动力计划表 (16)3、确保工程质量的技术组织措施 (17)4、确保安全生产的技术组织措施 (35)5、确保文明施工的技术组织措施 (60)6、确保工期的技术组织措施 (66)7、施工进度表 (78)(二)工程主要施工方法及其他措施 (79)1、主要施工方法 (79)2、工程投入的主要施工机械设备情况描述及进场计划 (99)3、拟投
22、入的主要施工机械设备表 (100)4、施工总平面图及临时用地表 (101)编制说明一、编制依据l、业主提供的施工图(施工说明)。2、国家、地方现行相关施工管理规定及国家编制相关强制性条文。3、本工程招标文件。4、我公司现有的施工管理能力、管理制度和施工经验。5、根据国家现行有关的建设文件及施工定额、地方政府有关规定、 本公司施工人员组织、机械设备配置能力; 6、国家和行业现行的施工规范、规程、验收标准及设计所选用标准图集。 7、我公司依据已建景观工程的施工经验编制的企业操作工规程中 适用于本工程的施工方法、技术和项目施工管理办法等。8、招标会议纪要及现场踏勘情况。二、编制说明本施工组织设计在编
23、制时,本着力创一流质量,为业主争效益,为企业争声誉的指导思想,从施工部署各项技术措施的提出及应用,施工方法及设备材料的投入等各个方面着手,结合我公司积累多年的园林工程施工经验,力求做到措施具体,方法实用,以达到建成一流的工程为宗旨。为使该项工程的施工全过程能按照科学规律组织规范施工,有计划地开展各分部分项工程的施工,及时做好各项施工准备工作,保证各种资源和劳动力的及时供应;协调各专业工种之间的工序搭接安排,保证施工的顺利进行,按期保质完成施工任务,特制定本施工组织设计。本工程应满足但不限于下列标准、规范:1、工程测量规范GB50026-93;2、城市绿化工程施工及验收规范CJJ/T82-99;
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- gm 人行天桥 垂直绿化 施工组织设计 secret
链接地址:https://www.31ppt.com/p-4794716.html