hz东风隧道4 横洞反坡排水爆破通风施工方案.doc
《hz东风隧道4 横洞反坡排水爆破通风施工方案.doc》由会员分享,可在线阅读,更多相关《hz东风隧道4 横洞反坡排水爆破通风施工方案.doc(21页珍藏版)》请在三一办公上搜索。
1、yuan, an increase of 17.5%; local government general budget revenue of 500 million Yuan, . Painting, model culture creates new Ma Church community, creating Lake scenic spot culture education base, received high evaluation from provincial and municipal discipline Inspection Commission, the peoples d
2、aily special report. Constantly promote independent Commission against corruption culture construction to rural extends, created established Dahlin rural industry Park independent Commission against corruption culture positions, formed has a support service low double excellent of members lead team,
3、 constantly perfect and established Park funds assets management, and village audit supervision, and villagers democratic financial, system, strengthening Park party, and Chief, and financial, full public, powerful to guarantees has new rural construction, by city rural style clean government inspec
4、tion unit led of height evaluation. Through the implementation of honest and clean government cultural construction, and effectively educate the broad masses of party members and cadres and consciously regulated behavior and discipline, honesty in politics and culture to create a good atmosphere and
5、 fresh development environment. Although we in implement implementation independent Commission against corruption guidelines aspects made has must effectiveness, but away from superior of requirements also exists must of distance, main performance for: a is system enough sound, education, and superv
6、ision, and prevention, and punishment, aspects long-term mechanism also enough perfect, especially in enrollment bid work regulatory aspects also needed strengthening; II is regulatory supervision exists lost of Yu wide, and lost of Yu soft, investigation illegal disciplinary case of efforts also ne
7、eded strengthening, individual sector and cadres also different degree exists treat gift, not to benefits not do, and mess do of phenomenon; Three for honest work is the new situations and new problems in finding timely enough, treatment measures are not strong enough. To solve these problems, we wi
8、ll proceed from the following five aspects of rectification, make sure to implement the provisions of the code. (A) deepening the learning, enhance the consciousness of honesty in politics. To create event as an opportunity to Excel and learning party, further increasing the governance capability an
9、d advanced construction, reinforced rules of the broad masses of party members and cadres awareness, sense of responsibility, sense of honor, improve working ability and level of scientific development. Should make full use of meetings, in particular central group learning opportunity, further stren
10、gthening the study and education of the code, the intensive warning education, education the majority of party members and cadres known fear, knew fear, honesty in politics of tension the strings, consciousness and enhancing the implementation of the initiative. Also, pay attention to apply what the
11、y have learned, consciously study results into planning work, new ideas,东风隧道(4#横洞)正洞反坡施工方案工期对比东风隧道3#横洞承担正洞施工任务2700米,里程为:DK646+000DK648+700,其中级围岩115米,级围岩815米,级围岩1395米,级围岩375米。到2012年10月7号,已完成135米DK646+000DK646+135,其中级围岩55米,级围岩60米,级围岩20米。剩余的任务:2565米,里程为:DK646+135DK648+700,其中级围岩60米,级围岩755米,级围岩1375米,级围岩3
12、75米。施工进度指标为级围岩160米/月,级围岩120米/月,级围岩80米/月,级围岩40米/月。从一端掘进工期为:60/160+755/120+1375/80+375/40=33.2月=996天。从两端掘进,以DK647+574为交汇里程从3#口向出口方向掘进的任务为1439米,其中级围岩60米,级围岩575米,级围岩655米,级围岩149米。掘进时间为:60/160+575/120+655/80+149/40=17.1月=513天从4#口向进口方向掘进的任务为1126米,其中级围岩180米,级围岩720米,级围岩226米。掘进时间为:180/120+720/80+226/40=16.2月=
13、486天从两端掘进总工期为17.1月(513天)。反坡施工较一端施工工期节省483天,大大提高了施工进度和效率。东风隧道(4#横洞)正洞反坡排水施工方案一、工程概况东风隧道位于弥勒石林区间,隧道进口里程DK638+769,出口里程DK650+065,全长11296m,双线隧道,左右线线间距4.7934.6m,设计为15.5的单面上坡,隧道进出口均接路基工程,最大埋深169m,洞身共穿过3段浅埋段。二、自然地理概况1、地形地貌测区属滇东南高原石林期剥夷面岩溶地貌。隧道处于岩溶高原面向弥勒盆地过度的岩溶斜坡地段,高程15061769m,相对高差约260m,自然坡度约1540,局部较陡。地表植被发育
14、,以杂木、灌木丛为主,缓坡地带少量辟为耕地,基岩零星出露。地表峰丘洼地、落水洞及孤峰平原等岩溶形态较丰富。2、地层岩性上覆第四系全新统坡洪积层及坡残积层粉质黏土、红黏土,细、粗角砾土。下伏基岩为二叠系下统梁山组灰岩夹炭质页岩、砂岩;石炭系上统马平组白云质灰岩;石炭系中统威宁组灰岩;下元古界侵入岩辉绿岩及断层角砾。3、水文地质测区地下水的主要来源为大气降水,在大平地断层处分水岭一带地势较高处接受降雨补给,区内基本无地表支流发育,只有在东风隧道的出口段才发育开口型的支沟,洞身段属地下水垂直渗流带和季节变动带。4、涌水量根据设计资料预测,隧道估算涌水量为Q=6.9104m3/d。三、方案设计与实施东
15、风隧道(4#横洞)正洞反坡施工按1100m设计,采用机械排水,由于正洞坡度较小,排水方案为正洞施工时开挖掌子面的积水通过小水泵抽到最近的聚水坑,再由主水泵由聚水坑通过水管将水抽至上级聚水坑,最终经横洞排水沟排放至洞外(见下图)。在隧道中线两侧设置聚水坑,设于综合洞室处(DK647+874/ DK648+374),聚水坑采用片石砌筑,坑内采用水泥砂浆抹面。LK-集水坑间距 is-线路坡度集水坑接力式反坡排水方式东风隧道估算涌水量为6.9104m3/d,本设计排水能力按4.2104m3/d考虑,同时考虑一定的备用水泵,两个集水坑容量按照10min涌水量设计。其中,最大涌水量暂时不予考虑,根据超前地
16、质预报等预报手段,适时增加水泵数量。临时聚水坑根据汇水段水量大小而定。工作水泵按使用1台、备用1台,并设专业排水人员管理和操作。四、设备选型配套表1 水泵配置表名称水泵型号流量m3/h扬程m功率kw出水管径mm数量台备注东风隧道(4#横洞)GMZ100-18-170渣浆泵170162215020掌子面GMZ250-32-1220渣浆泵7303722030048集水坑五、排水系统1、管路根据洞内最大水量情况,结合选配的抽水设备,正常施工采用一套为300mm管路,管材为无缝钢管。2、集水坑正洞内集水坑设在洞内左右两侧,设于综合洞室处(DK647+874/ DK648+374)。积水坑尺寸为:5m(
17、长)4m(宽)3m(深),容量60m3。3、排水供电为确保洞内排水正常进行,设置两条供电系统,一路运行,一路备用。4、其它掌子面排水采用移动式水泵,管路为150mm消防软管,抽排至就近的泵站或临时积水坑内。为保证洞内道路无水干爽,必须修建好两侧排水沟,确保洞内渗水通过侧沟引入积水坑内,不至于洞内道路上漫流。六、排水管理和实施1、人员安排队长1人、副队长1人、设备检修1人、排水工班2个班。每班组成:工班长1人,集水坑管理员1人/每坑、掌子面操作人员4人。队长陈涛副队长王炎设备检修曾茂荣人二工班长杨硕一工班长潘洪玉每个集水坑管理员1人,掌子面操作4人。每个集水坑管理员1人,掌子面操作4人。图1 反
18、坡排水人员组织机构图2、运行和检修确保电路确保电路安装的正确,检查转向是否正确;设置接地装置及标志。电泵的冷却,采用下一个泵站抽上来的水直接浇至电泵上进行冷却。施工中采用在水泵与管路的接口处安一+20 mm出水口,利用高压水不断对进水口处进行冲搅;同时,利用高压风进行冲吹,防止污泥的淤积。施工人员及时对坑内污泥杂物进行清理。在进水口仓裹铁窗纱,同时把水泵(工作面移动式)或进水口施在竹筐内,可以防止污泥及杂物的进入而发生堵塞。当水位下降超过底座,间歇出水时,应立即停机进行检查;运行一定时间后,须进行维护保养。及时地进行保养和维修是确保设备正常运转的必要措施。3、队长、副队长轮流24 h值班制,并
19、制定抽水记录表进行统一管理,发现问题及时处理,汇总问题进行总结分析。 东风隧道(4#横洞)正洞反坡爆破施工方案1.工程自然条件1.1自然地理概况1.1.1地形地貌 东风隧道区段属滇东南高原石林期剥夷面岩溶地貌。隧道处于岩溶高原面向弥勒盆地过度的岩溶斜坡地段,高程15061769m,相对高差约260m,自然坡度约1540,局部较陡。地表植被发育,以杂木、灌木丛为主,缓坡地带少量辟为耕地,基岩零星出露。地表峰丘洼地、落水洞及孤峰平原等岩溶形态较丰富。隧道进、出口有便道通过,交通较方便,洞身公路及便道稀少,相通条件较差。1.1.2气象水文 属亚热带湿润季风气候区,直接承受印度洋及太平洋水汽补给。其气
20、候特点是温暖湿润,雨量充沛,夏季长而炎热,冬季短偶有奇寒,有明显的干湿两季之分。弥勒县年平均气温为17.2,极端最高气温为36.1(1969年5月15日);极端最低气温为4.1(1999年12月27日);年平均风速为2.6m/s,最大风速为17.0m/s,风向为南南西。年平均降雨量为956.7mm,历史最大年降雨量为1326.4mm(1961年),最小为724.9mm(1963年);最大一日降雨量为144.7mm(1995年6月1日);雨季为510月,占全年降雨量的85.6%。年平均日照时数为2083.8小时。年平均蒸发量为1906.9mm。年平均雷暴日数为70天。最大积雪深为7cm(1980
21、年),年平均霜冻期为20天。相对湿度为73。1.1.3地震动参数 根据中国地震动峰值加速度区划图(GB18306-2001),测区地震动峰值加速度为0.15g。1.2工程地质特征1.2.1地层岩性 上覆第四系全新统坡洪积层(Q4dl+pl)及坡残积层(Q4dl+el)粉质黏土、红黏土,粗角砾土。下伏基岩为二叠系下统梁山组(P1l)页岩、砂岩夹灰岩;石炭系上统马平组(C3m)白云质灰岩;石炭系中统威宁组(C2w)灰岩;下元古界侵入岩()辉绿岩及断层角砾(Fbr)。1.2.2地质构造 本区跨越“扬子准地台”和“南华后加里东准地台”两个一级大地构造单元,测区地处昆明山字型构造体系东翼,隧道通过区经向
22、构造体系为主发育,另有规模较小的纬向构造与其交汇错移。主要断层为妈平断层、大额衣断层及啊基邑向斜。1.3水文地质特征1.3.1地表水发育特征 测区处于云贵高原向弥勒盆地过度的岩溶斜坡地段,隧道洞身地表无大的地表水系及迳流,局部岩溶洼地内有少量积水。地表水主要为线路右侧1.02.0Km附近在弥勒盆地边缘分布的以岩溶泉为主补给的水库(塘)水。1.3.2地下水赋存条件 主要以岩溶水为主,岩溶发育,含水充沛。次之为啊基邑向斜核部岩溶水储水构造及各断层破碎带断层水。泉点多,流量丰沛。1.4不良地质 隧道主要存在的不良地质有:岩溶、蚀变带、构造破碎带、高地应力高地温、红黏土、潜在不稳定斜坡。2.设计依据爆
23、破工艺试验的依据为:爆破安全规程(GB6722-2003)、铁路工程施工安全技术规范(TB10401.1-2003)、铁路隧道施工规范(TB10204-2002)、铁路隧道钻爆法施工工序及作业指南(TZ231-2007)、铁路隧道工程施工质量验收标准(TB10753-2010、J1149-2011)、爆破相关施工经验。3. 爆破设计方案围岩钻爆采用台阶法施工;即将隧道断面分为上下两个台阶分别实施爆破。首先开挖上台阶,上台阶完成一定进尺并进行支护后再开挖下台阶。由于上台阶的开挖为下台阶开挖增加了临空面,且为出渣、通行安全需要下台阶分左右两部交错开挖,即左边开挖时右边为通行车道,右边开挖时左边为通
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- hz东风隧道4 横洞反坡排水爆破通风施工方案 hz 东风 隧道 横洞反坡 排水 爆破 通风 施工 方案
链接地址:https://www.31ppt.com/p-4793921.html