hv静压震拔沉管灌注桩专项施工方案.doc
《hv静压震拔沉管灌注桩专项施工方案.doc》由会员分享,可在线阅读,更多相关《hv静压震拔沉管灌注桩专项施工方案.doc(10页珍藏版)》请在三一办公上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the宁波双鹿电池科技城二期工程附属厂房桩基专项方案目 录一、 工 程 概 况 与 要 求二、 施 工 部 署 与 计 划 进 度三、 施 工 质 量 技 术 措 施四、 安 全 技 术 措 施五、 文 明 施 工 管 理 措 施附图:一、桩基施工平面布置图 二、桩基施工进度图 三、打桩顺序图一、 程概况与要求:1、工程概况:1.1 建设单位:宁波双鹿电池有限公司 1.2 设计单位:宁波华之建筑设计有限公司1.3 监理单位:浙江工正建设监理咨询有限公司1.4 施工单位:浙江省二建建设集团有限公司1.5 地理位置:宁波市科技
22、园区内1.6 桩基类型:500静压震拔沉管灌注桩2、 设计要求:2.1 本工程采用500静压震拔沉管灌注桩,参照2004浙G20图集,设计桩长42.044.0米左右,不得小于42米,进入持力层不得小于0.8米,单桩承载力特征值为650KN,压桩力不小于1.5R,以静压稳定抬架为主,结合桩长控制。总桩数为561枚。2.2 钢筋笼:612 , L = 19米,箍筋为6300螺旋箍,每隔1600设一道加劲箍10,且与612电焊。2.3 砼标号:C25。3、 编制依据3.1 建筑物总平面布置图及桩位图;3.2 工程地质勘测报告;3.3 建筑地基基础工程施工质量验收规范(GB50202-2002);3.
23、4 建筑桩基技术规范(JGJ94-94);3.5 建筑软弱地基基础设计规范(DBJ10-1-90);3.6 宁波市建筑桩基设计与施工细则(2001甬DBJ02-12);3.7 本公司质量、安全、环境保证体系及程序文件.二、 施工部署与计划进度:(一)施工条件:1、 施工区位于宁波科技园区,地势基本平坦。场地自然地坪标高为绝对标高2.35m,设计桩顶标高为绝对标高1.95m,满足打桩要求。2、 搭建工地临时设施,安排好现场办公室及解决职工住宿点,要求合理。3、 施工人员、设备机具、材料进场,并做好设备机具调试检查工作。4、 根据设计要求,做好材料试验,并按实际需要用量给予落实。5、 用BJ060
24、3经纬仪进行测量,定位放样,做好桩尖埋设、障碍物清除等各种设备就位工作。6、编制施工平面图,安排打桩顺序表明桩位、桩号。(二)设备配置:根据设计要求,拟采用DZ40Y多功能桩机,其主要配套设备配置表: 设备配置表 (表1)序号设备名称型号单位数量备注1桩 机DZ-40Y台22电焊机BX400台23切割机台24翻斗车辆135插入式震动机台26气 割付27跑桩机台1(三)材料部署1、本工程桩基工程均采用商品砼。2、本工程沉管灌注桩桩尖根据设计要求委托加工,进场后须报监理公司审核批准后方能施工。3、所有进场钢筋必须有出厂合格证,报监理公司审查后现场抽样复验,复验合格后方能进行加工、使用。(四)施工进
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- hv 静压 震拔沉管 灌注 专项 施工 方案
链接地址:https://www.31ppt.com/p-4792483.html