lv桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案.doc
《lv桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案.doc》由会员分享,可在线阅读,更多相关《lv桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案.doc(347页珍藏版)》请在三一办公上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the桂芳园26#/26-D#楼人工挖孔桩工程施工组织设计目录第一章 编制说明4第一节编制依据4第二章 工程概况5第一节 工程概况5第二节 工程地质情况7第三节 现场施工条件9第四节 工程施工的特点及难点9第三章 施工部署10第一节施工准备10第二节指导思想与组织机构13第三节施工进度计划15第四节施工组织16第五节施工机械组织18第六节总平面管理19第四章 主要工程项目的施工方法23第一节 总体施工方案23第二节 降水、排水及沉淀井施工措施23第三节 井下流砂、流泥层处理措施25第四节 人工挖孔桩施工方法25第五节 测量
22、控制方法31第五章 质量保证体系及质量保证措施32第一节 质量目标32第二节 质量保证体系32第三节质量保证措施34第四节防止质量通病措施37第五节 商品混凝土的管理39第六节成品保护措施42第七节计量管理措施43第八节 统计技术45第六章 安全生产保证措施47第一节安全生产管理体系47第二节安全生产保证措施48第三节安全用电和电气防火措施49第四节 分项工程安全技术措施53第五节 主要施工机具安全技术措施55第七章 文明施工61第八章 进度控制措施64第九章 其他保证措施68第一节季节性施工措施68第二节现场消防措施68第三节降低成本措施69第四节 医疗措施71第五节 工程文件管理71第十章
23、 附录72第一章 编制说明第一节编制依据本施工组织设计作为指导施工的依据,编制时对目标工期、工程质量、项目管理机构设置、劳动力组织、施工进度计划控制、机械设备及材料配备、主要分部分项工程施工方法、安全保证措施、文明施工及环境保护措施等诸多因素尽可能充分考虑,突出科学性及可行性。本施工组织设计依据以下几项编制:一、深圳市佳兆业地产(深圳)有限公司提供的工程文件。二、深圳同济人建筑设计有限公司设计的布吉桂芳园六期工程施工图纸。四、现行国家有关规范、标准和规程。五、广东省及深圳市有关文件及规定。六、现场实际情况。第二章 适用范围本施工组织设计适用以下范围:一、施工图纸内包括1、深圳同济人建筑设计有限
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- lv桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案 lv 桂芳园 26 人工 挖孔桩 工程施工 组织设计 方案
链接地址:https://www.31ppt.com/p-4792205.html