hj手工电弧焊加氩弧焊Q345R板材对接焊接工艺评定.doc
《hj手工电弧焊加氩弧焊Q345R板材对接焊接工艺评定.doc》由会员分享,可在线阅读,更多相关《hj手工电弧焊加氩弧焊Q345R板材对接焊接工艺评定.doc(7页珍藏版)》请在三一办公上搜索。
1、1, and prepared according to 1.1, and thermal power engineering started debugging work provides 1.2, and thermal power power plant construction engineering started and the completed acceptance procedures 1.3, and thermal power unit started steam Blowpipe guide is 1.4, and thermal power engineering a
2、djustment try shipped quality test and the evaluation standard 2, and #1 furnace started debugging organization measures and the related provides 2.1, and organization Division: for guarantee wide up thermal power plant #1 furnace started debugging and the part steam machine system of smooth voted s
3、hipped, special established #1 furnace try shipped professional group, members following: leader: Deputy Leader: supervision: crew: wide up try shipped personnel: wide up acceptance personnel: 2.2, and debugging, and try shipped content: boiler auxiliary machine Division debugging electric dust of D
4、ivision try turned and the debugging baking furnace Cook furnace boiler rushed tube, and blow sweep security door check 2.3, and operation provides and the Division: #1 furnace debugging, and try shipped by #1 furnace try shipped professional group requirements for, which single try turned and Divis
5、ion try shipped by xD three company led is responsible for. all moving operation operation must be in strict accordance with the prior authorization of the #1 boiler commissioning professional working group, and after starting, the test command-approved #1 furnace steps in the test programme, event
6、of temporary changes be reported to headquarters approval. commissioning, trial operation process is required for each project by Northwest electric power construction company ready equipment installation records, and fill in the test application form, the a and b sides after passing the checks, fil
7、l in partial commissioning checking before a visa, reported head of the approval, carried out by the leader of unified command. About each action are made by the leader of a unified command, operation after the report to the team leader. Without the Directors consent shall not unilaterally make any
8、startup operation, such as single operations, who is responsible for all security responsibilities, with no ties to the other side. all before the first turn of the motor, must be approved by both parties a common roll insulation measurement can be carried out properly. After the end of each project
9、 commissioning, fill in partial acceptance visa trial shipments. As motor in rotating equipment commissioning test switch and mechanical part of their trial cannot continuously, this is considered two test projects shall be carried out according to the above four steps. 2.4, and attached work votes
10、issued people, and license people, and work head list: party electrical first species, and second species work votes license people list: party engine work votes license people list: b electrical first species, and second species work votes issued people: b hot control professional issued people lis
11、t: b hot control professional work head: b steam machine professional work votes issued people: b steam machine professional work votes head: b boiler professional work votes issued people: b boiler professional work votes head: attached: about personnel of contact phone party b Division 3, boiler a
12、uxiliary equipment debugging scenarios 3.1, send, induced draft fan try turned 3.1.1, try turning the former requirements of: 3.1.1.1, fan body and motor installed, based the second Grouting ends, and the concrete strength is up. 3.1.1.2, coupling the Centre has finished aligning standards, approved
13、 visa. 3.1.1.3, bearing clearance normal outer rims and bearing clearance is up to standard. 3.1.1.4, Benton . Condition. 5.1.3, oven starts all range of comprehensive systems have been installed, grate, delivery, fan and slag machine to try to transfer a qualified acceptance and visas. 5.1.4, boile
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- hj 手工 电弧焊 加氩弧焊 Q345R 板材 对接 焊接 工艺 评定
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4791801.html