hg鸭溪酒业大道二期工程施工组织设计.doc
《hg鸭溪酒业大道二期工程施工组织设计.doc》由会员分享,可在线阅读,更多相关《hg鸭溪酒业大道二期工程施工组织设计.doc(155页珍藏版)》请在三一办公上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .鸭溪酒业大道二期工程施工组织设计鸭溪酒业大道二期工程施工组织设计重庆市宏贵建设工程有限公司2
14、014.6目 录第一章 编制依据和原则第一节 编制依据第二节 编制原则第二章 工程概况第一节 道路工程一、道路纵断面形式二、道路横断面形式三、道路结构四、人行道结构第二节 给排水工程一、雨水工程:二、污水工程三、给水工程四、燃气工程第三节 电力通信工程一、电力工程二、通信工程第四节 照明工程第五节 沿线水文地质等自然条件一、气候及水文二、地质情况第六节 现场情况一、现场情况二、拆迁情况三、水电情况四、施工道路五、借弃土场第三章 施工部署第一节 项目部(作业区)的组建一、项目部组建二、人员配置和主要人员职责三、施工队伍第二节 施工临时设施一、生产生活区二、混凝土、砂浆、水泥级配碎石、沥青砼拌合场
15、三、施工用水四、施工用电五、临时路六、施工期间交通组织七、借弃土场第三节 施工进度计划及控制措施一、工期总目标二、施工阶段划分及工期目标三、施工对策四、施工管理目标五、进度控制措施第四节 施工准备一、技术准备工作二、工程测量三、现场调查四、雨季施工预防五、建筑物拆迁和树木砍伐六、生产准备七、劳动力组织准备八、材料的组织供应第四章 主要项目施工方法第一节 路基土石方施工一、工程概况二、施工工期安排三、施工前的准备四、施工队伍、施工机械配置及主要施工方法五、路堑施工六、路堤施工七、路堤、路堑防护工程第二节 涵洞工程一、钢筋砼盖板涵施工二、钢筋砼圆管涵施工第三节 管道工程一、排水工程施工二、电力管线
16、三、电信管线四、给水管线五、燃气管线第四节 路面工程施工一、路面结构层为二、工程使用的机械三、片石填隙层及级配碎石层施工四、路面水泥稳定级配碎石底基层施工方法五、水泥稳定级配碎石基层六、透层油施工七、粘层油施工八、沥青混合料路面施工第五节 人行道工程第六节 交通工程第七节 路灯照明工程第五章 冬雨季施工措施第一节 冬季施工措施第二节 雨季施工措施第六章 主要技术措施第一节 技术管理措施第二节 成品保护措施第七章 工程质量管理第一节 质量目标第二节 质量保证体系第三节 质量保证措施第四节 试验、检验及资料第五节 分项工程各工序质量观感要求第八章 安全保证措施第一节 安全保证体系第二节 施工安全措
17、施第三节 消防保卫措施第四节 机电设备安全防护措施第五节 临时用电安全措施第六节 文明施工及环境保护措施第七节 冬季、雨季的施工措施第八节 农民工工资、材料款支付的保证措施第九章 现场管理措施第一节 确保工期的措施第二节 降低成本措施第三节 廉政建设 第一章 编制依据和原则 第一节 编制依据 本施工组织设计根据以下资料及相关信息组织编写1. 四川省华西建筑设计研究院设计的鸭溪酒业大道二期公路工程施工图设计;2. 市政道路工程质量检验评定标准(CJJ1-90);3. 公路路面基层施工技术规范(JTJ034-2000)4. 公路沥青路面施工技术规范JTGF40-2004;5. 市政排水管质量检验评
18、定标准(CJJ3-90);6. 城市道路路基工程施工及验收技术规范(CJJ1-2008);7. 给排水构筑物施工及验收技术规范(GBJ141-2008);8. 给排水管道工程施工及验收规范(GB50268-2008);9. 工程测量规范(GB50026-2007);10. 公路工程施工安全技术规程(JTJ 076-1995) 我单位根据上述有关资料和现场踏勘,深入调查研究,并结合我单位多年的施工实践经验,由具有丰富施工实践经验和管理经验的工程技术人员编制而成。 第二节 编制原则1、在编制施工组织设计文字说明及附图表中,做到统一标准,规范编制。2、遵循设计文件和规范验标的原则,在编写主要项目施工
19、方法中严格按照设计要求,执行现行施工规范和验收标准,正确组织施工,确保工程的质量、进度。3、坚持实事求是,一切从实际出发的原则,在制定施工方案中,根据自身施工能力,施工经验,技术水平,坚持科学组织,合理安排,均衡生产,平行作业,尽量平衡施工高峰。确保高速度,高质量,高效率完成本项目和施工任务。4、 坚持施工全过程严格管理的原则,在工序施工中,严格执行监理工程师指令,尊重监理意见,严格管理体制。5、 坚持积极推广应用“四新”成果的原则,在各项工序施工中,对于能够提高或保证工程质量、施工进度以及降低工程成本的新技术、新设备、新工艺、新材料积极采用。6、 坚持专业化作业与综合管理相结合的原则,在施工
20、组织方面,以专业作业队为基本作业形式,充分发挥专业人员和专用设备的优势,同时采取综合管理手段,合理调配,以达到整体优化的目的。第二章 工程概况鸭溪镇位于遵义县西部,境内交通方便,地理区位优势十分明显,326国道和杭瑞高速公路纵贯全境。鸭溪酒业大道是鸭溪镇总体规划中东西向的一条主干路。酒业大道二期起点K1+700接现状道路,自西向东,在起点处与规划工业大道相交,后自西向东下穿杭瑞高速,沿现状道路北侧讫于K2+760。本次施工图设计范围为K1+700-K2+760段,道路全长1060米,宽36米。道路部分设计包含路基、路面及道路附属工程设计, 其主要工程内容包括道路、雨污水工程、路灯工程。主要工程
21、数量见下表: 序号项 目 名 称单 位数 量1挖 方m398892.72填 方m3127740.63清 淤m316750.64弃方m346418.45AC-13厚4cmm2273716AC-16厚5cmm2273717AC-25沥青混凝土厚7cmm2273718玻璃格栅m2273719聚丙烯腈纤维T7.61040cm水泥稳定级配碎石基层(水泥含量5)m22817611级配碎石层厚15cmm22908812填隙片石厚25cm m22983013人行道仿青石面砖(50255)m2702014人行道盲道砖(25255)m21260151:3水泥砂浆找平层3cmm270201610cmC15砼基层m2
22、70201710cm级配碎石m2702018路缘石(C30砼1435100)m424019路边石(C30砼102850)m212020绿化带m2636021防撞护栏m15622雨水检查井座5923雨水暗井座2024单篦雨水口座7925雨水连接管m218526污水检查井座5027污水连接管m21342811+1U-PVC192/180管(包封C20砼)m106829电力过街5+1无缝钢管192/180(包封C20砼)m50030电力检查井座293110+2PVC110通信(包封C20砼)m1070325+1通信过街PVC110管(包封C20砼)m50033电信检查井座3034电缆(YJV-1KV
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- hg 酒业 大道 二期工程 施工组织设计
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4791731.html