iz施工组织设计旋流井.doc
《iz施工组织设计旋流井.doc》由会员分享,可在线阅读,更多相关《iz施工组织设计旋流井.doc(15页珍藏版)》请在三一办公上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the技 术 标工程编号:CEET-GC2010-005工程名称:迁安市九江200万吨/年焦化污水处理机电及工艺管道安装工程批准人:审核人:崔景宽编制人:刘晓宇三冶管道公司2010年6月18日目录一. 工程概况-3二. 施工方案-4三. 人员配置-12四. 施工机具配置-12五. 施工计划-12六. 安全措施-13七. 施工技术标准选用-14八. 施工质量保证措施-14九. 施工平面图-15一. 工程概括:本次招标工程项目的招标范围主要包括焦化污水处理(吸附池、隔油池、酚水井)及泵房;调节池、事故池、生化反应池、后处理(污
22、泥浓缩池、二沉池、混凝沉底池)及后处理泵房、综合处理泵房、布水器泵房、风机房等的机械设备和工艺管道安装调试项目。主要设备一览表序号名 称型 号 及 性 能单位数量1刮油刮渣机12MP-2台42编缆式撇油机SY-120 Q=2000L/h套43双吸离心泵600S75A Q=3400m3/h H=60m台84配套电机Y560-6 N=800Kw n=970r/min V=10Kv台85潜污泵WQ20-9-1.5A Q=20m3/h H=9m台2配套电机Y型电机 N=1.5Kw N=1470r/min v=380v台26渣浆泵40PV-SP Q=26.64m3/h H=22.5m台2配套电机Y132
23、S1-2 N=5.5Kw n=2100r/min V=380v台27电动桥式吊车G=10t Lk=10m 起升高度10m台18电动抓斗式吊车G=10t Lk=21m 起升高度15m台19立式泵600LT-1100X2 Q=3000m3/h H=39m台910泵配电机YL500-6 N=500Kw V=10Kv台911立式泵200LT-400X3 Q=300m3/h H=37.5m台112泵配电机YL250M-4 N=55Kw V=380v台113膜片式水泵控制阀 DN600 P=1.0MPa台914膜片式水泵控制阀 DN250 P=1.0MPa台115电动组合(三片)式矿浆阀 DN600 P=
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- iz 施工组织设计 旋流井
链接地址:https://www.31ppt.com/p-4791647.html