iv共济公司施工组织设计.doc
《iv共济公司施工组织设计.doc》由会员分享,可在线阅读,更多相关《iv共济公司施工组织设计.doc(51页珍藏版)》请在三一办公上搜索。
1、take corrective and preventive action. 3.11 quality rewards companies for projects, construction crews and other layers of quality responsibility documents signed, linked with the economy. Clear rewards and punishments, strictly cash. 3.12 quality return system to track the quality of completed oper
2、ations, monitoring, and problems with corrective action in a timely manner, and recorded for analysis in order to improve the experience for the future construction level. 4, quality control system: establishment of perfect quality control system. Comprehensive understanding of engineering quality c
3、ontrol points, develop specific comprehensive quality control measures, clear quality control responsibilities, company, Department, three-level quality control system in the construction area of the project. Concrete quality control system block diagram. 4.1 quality control principles: (1) quality
4、control follow the prevention first principle, insisting on quality in advance control, eliminate hidden quality in spurts stage. (2) adhere to the high standards of quality assessment, and all data is strictly prohibited on imagination-do. 4.2 quality control: quality control procedures, see next p
5、age. Quality control elements list construction prepared process a design low-down 1 drawings since trial project technicians drawings information whether complete, whether meet construction need drawings technology file since trial records 2 design low-down project technology head understand design
6、 intent proposed problem drawings technology file design low-down records 3 drawings triage project technology head on drawings of integrity, and accuracy, and feasibility for triage drawings technology file drawings triage records II developed construction process file 4 construction organization d
7、esign project technology head by related file requirements series Construction organization and standard approval drawings for approval of construction organization design 5 construction plan project technicians above standard construction drawings . Officer for check acceptance, through the layers
8、of quality control to ensure that the project meets quality standards. 3.9 breach of construction regulations, construction techniques according to the person in charge of construction quality accident reporting system specifications, design and construction process guide the construction personnel,
9、 shall not be an illegal command. The operator must operate in accordance with the relevant norms and regulations is, not brutal construction. Construction managers found that the operators violated the construction specifications, be stopped immediately, and report technical leader, urged the opera
10、tor immediately corrected. Quality accident on violations of construction rules, and size, as appropriate, timely escalation the company, management and owners and record in writing reports. Quality the right to stop any violations of constructionuna certa fora, triar la ubicaci correcta de laigua d
11、escarregada. Mtodes experimentals sn les segents: una. secci de prova tamb, per separat amb prova b. Reg lentament omplert de la canonada daiges avall. Quan alts en la secci la proveta i canonada que sobresurt de un conjunt de vlvula descapament, lexclusi de gas a la canonada de reg. Desgus b. princ
12、ipis en el tub dassaig ple daigua per a 1 nit, comenava a provar nivell daigua ben marcat i gravada i continua a prova dins de lobservaci perode de temps durant el qual laigua i el registre el componen laigua, llavors dacord amb la frmula per calcular el volum real de laigua. Frmula: q=W/(T*L) w-com
13、plementries aigua capacitat l-canonada longitud experimental t-temps, no menys de 30min quan q permet passar c. desprs de completar la prova, laigua immediatament posar aigua a la xarxa. (6) conductes omplint: canonades abans backfill ha netejar les escombraries a la canonada i fent manteniment treb
14、alla quan la inspecci clavegueram sense problemes. I netejar la runa de tanc, ranura Expulsor desprs de laigua en la backfill. Backfill simetria bilateral rasa backfill a canonada, segons els requeriments de disseny, backfill amb sorra graduada, classificava grava aigua i vibraci de dinmic compactac
15、i-compactar, estndard s ja no enfonsant, fins bombolles, per conixer el disseny i especificacions. En prova daigua tancats qualificat noms desprs domplir la construcci. Quan leix en els dos costats al mateix temps, backfill Simetria horitzontal; el gruix de Max de paviment i compactaci de cada capa
16、s de 30cm i per evitar limpacte violent. Quan el backfill sobre els 50cm de la part superior de la canonada pot ser mecnicament el farciment. Backfill sl backfill per capes, capa compactaci mtode. Compactaci est perms fer malb la canonada, compactat la canonada per ambds costats i 50cm dins de la ca
17、nonada per sobre les manipulacions elctric a causa de la durada del projecte i sense interrompre els casos de trfic, construcci de canalitzaci hauria de teixit segmentat, en un perode relativament curt de temps per satisfer la demanda de trnsit, laltre costat de la construcci de caixa de la carreter
18、a tan aviat com sigui possible, per afrontar la segent secci de construcci. Amb aquesta finalitat, es recomana la canonada rasa classificava grava backfill lelevaci de llit de carretera. Distribuci de mida de partcula de sorra backfill de rasa ha de ser utilitzat en bon gruixut sorra, relativa densi
19、tat no menys de 0,70, bona 2-4cm grava gradaci grava backfill grava backfill i compactaci per capes de manera, cada solquen 30-50cm, piconat en mtode constructiu de consolidaci o aigua. Qualificar grava compactant de compactaci dinmica vibraci grava amb brollen ja no, no que senfonsa com lestndard.
20、Procs de desgus de paret destructura de polietil 9.3.4HDPE: solc excavaci amaniment artificial canonada basat HDPE canonadaIn order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety acci
21、dents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head tea
22、cher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issue
23、s dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run a
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- iv 共济 公司 施工组织设计
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4791338.html