je桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案.doc
《je桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案.doc》由会员分享,可在线阅读,更多相关《je桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案.doc(349页珍藏版)》请在三一办公上搜索。
1、Kangda College of Nanjing Medical University (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M t
2、otal area: 13979 square time: 251 days. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in L
3、ianyungang city, Jiangsu Yulong building construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration,
4、 quality, security and contract requirements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully m
5、eet the expectations of safety and durability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on t
6、he above points, the erection of scaffolding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous const
7、ruction experience, decided to adopt the following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safe
8、ty monitoring. Horizontal and vertical transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Pane
9、l agencies, staffing, and the Division of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible fo
10、r on-site safety inspections; Zhao Guangrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of exp
11、eriments, materials equipment positioning settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings
12、with a ruler, measure the inner and outer pole distance from the wall, and mark steel tape measure straight, separate the pole position with a small bamboo pole marked; Base plate, should be accurately placed on the positioning line, plate must be covered with .Kangda College of Nanjing Medical Univ
13、ersity (pharmacy/f/nursing/f); construction sites: the North West side of mountain road, Chun Fai Road, Lianyungang city, belonging to frame; 5 floors; the West part of the nursing 1 underground; refractory grade, building height: 25.45m; standard floors: 4.5M total area: 13979 square time: 251 days
14、. This project consists of Jiangsu run investment development company building, Shanghai even architectural design, exploration of geological engineering exploration Institute in Lianyungang city, Jiangsu Province, continuous supervision limited supervision in Lianyungang city, Jiangsu Yulong buildi
15、ng construction engineering company limited; the Song Shipei as project manager, Song Shijiang served as technical director. Second deployment, overall planning and construction (a), the overall plan for the project taking into account the construction duration, quality, security and contract requir
16、ements, so the options, should fully take into account the following points: 1, frame structures designed to make structures safer and reliable, reasonable cost. 2, and under the conditions provided for in the regulations of use within the time limit, to fully meet the expectations of safety and dur
17、ability. 3, selection of materials, and strive to achieve common GM, working capital use, ease of maintenance and repair. 4 when the structural model, we could achieve a clear force, structural measures in place, lift ride down easy, easy to check; 5, based on the above points, the erection of scaff
18、olding, JCJ59-99 check the standard requirements must be met to comply with the related chemical related standards of civilization. 6, with the above scaffolding design principles, combined with the actual situation of the project, considering the previous construction experience, decided to adopt t
19、he following scaffolds programme: steel floor scaffold (b), security in the process of construction of the leading group, at the peak of construction, the construction team in crossed operations, safety monitoring should be strengthened, and set a number of safety monitoring. Horizontal and vertical
20、 transport of materials to set up the temporary warning area, triangular flag with red and white fences. Beware of construction personnel. Set up to project manager as the head of the leading group of security to improve site safety protection at work, this Panel agencies, staffing, and the Division
21、 of responsibilities are as follows: Song Shipei (Project Manager)-group leader, coordinates the work of command; Xu Yunxu (Builder)-Member, responsible for site construction command, technical clarification; Sun Dacheng (Security Officer)-Member, responsible for on-site safety inspections; Zhao Gua
22、ngrong (workers monitor the shelf)-Member, responsible for site construction; Third, the erection process and construction technology of steel tube landing landing the scaffold the scaffold process is: ground levelling, tamping Foundation bearing capacity of experiments, materials equipment position
23、ing settings through long hand, base pole longitudinal sweeping the rod horizontal sweep the rod scissors small bar-the bar wall protective railing Pu scaffold pierced safety net. Fixed positioning. Four corners according to structural requirements in buildings with a ruler, measure the inner and ou
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- je桂芳园26 26D 楼人工挖孔桩工程施工组织设计方案 je 桂芳园 26 人工 挖孔桩 工程施工 组织设计 方案
链接地址:https://www.31ppt.com/p-4790846.html