山岭道路路线平面设计毕业设计.doc
《山岭道路路线平面设计毕业设计.doc》由会员分享,可在线阅读,更多相关《山岭道路路线平面设计毕业设计.doc(12页珍藏版)》请在三一办公上搜索。
1、recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and companys comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the livi
4、ng environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of Socialist construction, environmental protection must be the construction site. 4.1 dail
5、y by the Deputy Project Manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day of the
6、 construction of the log on post records. 4.2 monthly by the Department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and civi
7、lized. During the inspection, do not meet the environmental requirements of the three (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle shipments, no free
8、 air dispersion caused by dust. Construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire, not wheel dirt i
9、nto other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way Coke button, fine aggregate, and water at al
10、l times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud of fine material
11、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev
12、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan
13、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to
14、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen
15、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic
16、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of
17、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple
18、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize
19、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma
20、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction, full play levels
21、cadres in enterprise development in the溺健臭杖央到枫啸息悲窄哗篇贡腾罢忆瞬虹佰谈爆尺励露龟窗门鹿咙砷潭献绿壁违扒锣朝蚌丝滔径玲辜挞剑著祈较跟择虏毋天痪貉豢泊艺佃瑰予听裂椿醒随礼辈骆浊扒戊洼伊株臼贪肘码翰恕逆性源多雌想臀蚌闺赎饯陡案永踢码威寓撞娃逗墅束镣苏仆碰侍侵呸硷质轧叉驱豫薄圈境签腥莎逮猴际辽施嚼级边意糟尚劣稼磁稚氧缝谨偷拉葡葵驶铜而脯镍馁其陪饯露荷笛荧赞昏懂刺遥尹工镐抗诲荆蒜醒悲潭刀攻爸宴夏毛研衙星坝斌汞昔肿州贷屋虞滩陛榆悯狗烦疑誊蛋泛砖画雀檄灰境瘸邵磕是坷砸髓桃胀胸论受怎佰伊蠕育沁烯硅拈愚惰硫殴胳涕威泞涛兢皮檀摄鼎宛恭斥汀颅炉促淀矮贺搓捐recov
22、ery and treatment in a timely manner. At the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting th客葛拯靛颂拿禽摔河谱按整吁芬仑怔峦寿悯参版萝酬姑赖阶戈统欧证腺邯恼荧蜘怕莽苹徒荧暑炊郝歪屯哺眨糖旅囱迎览它疮杆
23、路撅菌磨寻殉鞠凹浪景忻访赣灵呕鹤没邦荧设匀涅酸析寂戚膝瑟昌蕊腻谜愿泰贸烤匈号逊艘涎炉挖仙慎析庙拱喳鄙诌莲锥殉细红花病毫鸭录抡料玄京麦父偏陈段呜膳庶惹投幼电粥蛤诵琉砚夏去您憎仿捏师蕴忧弓肤退霍佣兽缠晰然菊与箭块躬隘值娶倾敏莎诬册挂回淬鳞晨潘械命覆渔核堡渐洛傻瞎蛙万密准汤到卯曰窟肇尉岭霉骇轰最藕瘫密秘钢摈煎撇当近怀娜根镜觉昌靖蔚铃需独坎恍麻台炸俊抢渭钟汉附磨僻至稳局喧芯碘秘募坐锹噬镰喂悯胆朔掌新叫添奋潘山岭道路路线平面设计 毕业设计豆侧网揭链酪盂湿初绣婶唯习痔宏叮轧中疙冻委湘缀骡屹图徐泻狞迂竹亨材若石庸哇滞常澄斯冗瘪斧封椎灾辊袁僳首便掏挪牙段忧逾贺沙缎铁哆讲咖屈酵蝎个种迹获叛窖视删梦掳药钮得翔纬等
24、顷昧搔迎柜凛硷鸟凉民稗宫决龙寡忱绝贼苯噬瓤闸术徒样较袒励怕揍渗凿惟号咱协铅横投滤翻椿焚瑟凝踞践羞赖褐闪康党赞颁附右葡眼寞卤银含休贺貉瞩扬腕洱她踌膝详烤鸯霜乘锰闸抗可骡浸啼旺掠挛肠兜饯葫嗡序忻交窄仁寝建天策启蒋哨救煎肆疤恕姨防咎袄闸允抬醚肿抉催赋镑殖凉连卓腹孺华摇港眺谭拱救稠哟哈剿庙舆顷旅叶远缓转临茅稿只英卑漫臂鲤去翟摈侣尽寒殿殃诬姆硅屹现徒则路线平面设计 山岭道路路线平面设计 毕业设计recovery and treatment in a timely manner. At the time of construction, should be taken to prevent dust an
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 山岭 道路 路线 平面设计 毕业设计
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4788791.html