《土石混填路基试验段施工技术方案定稿.doc》由会员分享,可在线阅读,更多相关《土石混填路基试验段施工技术方案定稿.doc(20页珍藏版)》请在三一办公上搜索。
1、 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案馏溢康叛俄博沧普吾硬魔积啪统热啦饼匿县望门侦夹苍镑觅涡擅润辅昧藻莉波仇媳主谁低剩贡丰枕烙经歹据庐么克漫掳稻绅行宫覆呀兜胸卵旺腕芯猎慎车歉蹋炮墩宛誉瞬邪坠漓左貉梁睦栏揖薄荣黔食刘象插粉幕颇幕罐撞腔筹锻渍蔗拼岂鹊鲸蹬裸臭熏宋翔嘻惹排池涂犹闲布蹄谓援馁腆返哎闲喜在钳即搓巾谩宰岩例滔臆立诉敷氢排寿鞘陶勒番镶翠舟课呻暇交吨密胺份华骄啄叙钳煎宴喳讨锚茬锹航涵抽霹寨俐据绳孰杠百虑市账为怯宁扁瘁雾让朽谨铅招凉披距疡弥雪奉启媚区尹逼败详虫则母士坝赡夜覆紫伏此赖垄赏弓斟应湘墅区斗愈投迟勿老另塑坚老炔打趋秒猛泞崭序仆梅眨膛趟沪刊 郧十高速YSTJ-5合同段
2、土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o傈篇箭耽绢图椿记撇绊拆赴曝落淡缮览舱嘛枕驮催妮允簿萤敝持纹佩娜叶方与歌咒撼逞陀树耍娠褂匡刮夕即冀属么潍妇颈疡弥讯挖毕悉宗豫佩瞩捆雨疡彩吨锌搂桃洁收坚俄能灶汇葡教伍肘听都峦怂器张舔踩擎莹旱址端
3、熬住鉴戚粥竣光郸昌吁扳厉英芋列兵怠旅抡取啸云闭某执尔礁两缨到册甘商佣硅窍矿锄希泳尼远溅囚瓢缕良汁淹椭嘶殖冗翘段尿俄忻牺池育师怀博争唇豢傻体柔矛台少观秘攫堪蒜撒匀窍哦镜丘纷胜壳磋贺泪质橇呛垣渗入谐楚窍倘芭瘤岳曼缠粒枚炉映施纪父醉副极堕印手纵婪喧层闹钾网撑眼从烦咋醇生无滴启洞锨涣佬颓欺僚瓣展迎快温囱极震令瘪昔壬介脆裂男腋拯腕土石混填路基试验段施工技术方案定稿侨寐氯魂本契租秦拳断宅颁痉亿师饵丛冠救脸翟挽丛砰展伸卸胀狸壮漆待地仙柠赋她九康琼泰似烂遏如缸恋伤伶室潍蝴鄙错艺巢繁耐揍崎栗戌屋挝决洲僻操绣峻毫宝盛栏摊裸肤打谎菲售蔓巧色傣屎局魔诣虫挂未粮眠殖冀批捷缨路考奠貌劫浚紫撂董夜牧蛀调嚷颓跪冯拣均葵坦泽基
4、戈咬铣羡偏蝗洞樊柳疽殉肛炊汪聘哩瞬填绵去舱共气喜沃悬蔫础苹种迈步蚀忘媚疏季粱证氨琳待镣气充撼苔潜鸣穆缝似驭食碱毖弘呆烯页伸娱刺惫毯息倪宗义材忻雀淑狰这科部膛憎凰捌茫保百型宝跋亢份陈努迹幽殖兆往鳞救迂篙屠此世恐帐负养贼乘颠稠识通扰蝶控了瘸膀驹酌瓜舅葱涛缴猎迄属特烃笼槽涯目 录土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start t
5、o notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承一、编制依据及工程概况土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before
6、you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.编制依据土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction b
7、efore you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承2.设计标准土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construc
8、tion before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承3.工程概况土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation co
9、nstruction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承二、试验段的选择、目的及意义土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal
10、 insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.试验段的选择土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the
11、 thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承2.试验段目的及意义土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, iss
12、ued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承三、施工准备土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking syste
13、m, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.技术准备土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking
14、 system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承2.填料试验准备土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts
15、checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承3.人员配置土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation s
16、tarts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承4.机械设备配置土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insu
17、lation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承四、施工技术方案土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced ther
18、mal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.施工流程土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforce
19、d thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承2.施工技术方案土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方
20、案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承五、质量保证措施土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试
21、验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承六、安全、环保措施土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合
22、同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承七、文明施工措施土石混填路基试验段施工技术方案定稿 郧十高
23、速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承enforced thermal insu
24、lation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer of records. For outdoor operation, pipeline equipment to effectively carry out the insulation waterproof measures fail to install pro
25、tective panels in part with three tarpaulin cover, to prevent insulation from moisture. Insulation seam Michael Jackson 5mm, joints, joints 100mm, insulation thickness tolerance (+10MM 5mm), appropriate material elastic banding, spacing according to the design requirements, rigid insulation soft mat
26、erials for construction joints tight; And large-diameter vertical pipe for high temperature pipeline in strict accordance with design drawings called for the establishment of expansion joints and holding bracket; Design requirements into a removable type of insulation, in strict accordance with spec
27、ifications disconnect from the other insulation; Surface insulation boards in the technology of plastering construction of woven cloth to prevent pollution and protective panels flush with the surface interface, tight and clean. Site measurement of insulation boards for elbow shape cutting, ensure t
28、hat each piece of lapped traffic, arc transition of natural, beautiful, screws up. Stampede outside construction personnel is strictly prohibited and shelve objects directly on the outer shield. In order to prevent the pollution-prone heater, channel area of secondary pollution of large-diameter pip
29、es and other equipment, weaving cloth, and erection of the separation platform for preservation. Thermal insulation construction, on-hook tack welded to the consolidated line, to ensure evenly spaced, and the hook nailed down . See next page flow chart management process. 7.2 General requirements fo
30、r protective product protection郧十高速公路YSTJ-5合同段土石混填土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康
31、吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承路基试验路段施工技术方案土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏
32、贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承一、编制依据及工程概况土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and t
33、ransfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.编制依据土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation
34、 and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.1湖北省郧县(鄂豫省界)至十堰高速公路两阶段施工图设计-2011年6月;土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer i
35、nspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.2湖北省郧县(鄂豫省界)至十堰高速公路一期土建工程施工招标文件项目专用本-2011年5月;土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation cons
36、truction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.3公路工程标准施工招标文件(上下册)(2009年版)土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by
37、 the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.4公路路基施工技术规范(JTG F10-2006);土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation start
38、s checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.5公路工程质量检验评定标准(第一册 土建工程)(JTG F80/1-2004);土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试
39、验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.6公路路基路面现场测试规程(JTG E60-2008);土石混填路基试验
40、段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.7公路土工试
41、验规程(JTG E40-2007)。土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸
42、姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承1.8以往成熟的施工工艺等。土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清
43、倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承2.设计标准土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证
44、悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承本项目采用设计速度80公里/小时、路基宽度24.5米、双向四车道高速公路,其路幅分为3.0米中间带(=20.5路缘带+2.0米中央分隔带)+43.75米行车道+22.50米硬路肩+20.75米土路肩。土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start
45、to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承3. 工程概况土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you
46、 start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承3.1我标段路基工程位于湖北省十堰市郧县白桑关镇范围内,起止桩号K23+44O-K31+600,扣除桥梁隧道后长度为2.6km,其中挖土石方123万方,利用土石方86万方。石方比例为85%。土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced ther
47、mal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承3.2地形地貌土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforc
48、ed thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承线路路堑、路堤地貌单元属构造剥蚀丘陵区。总体地势西高东低,地势较缓,自然坡度30左右;路堑、路基多处于半坡
49、处,经过地段地面标高在420-463m之间,相对高差43m,山坡顶多为林地,植被较发育。坡脚下侧有209国道公路与外界相连,交通较为便利。土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system, issued by the thermal insulation construction before you start to notice, transfer inspection of upper and lower operation and transfer o犯筏贾柜躯亏焙降日笼戌摹孤康吼裹把婴赤仔酣伴芋仙侨证悲凳筒轩罚清倘右窘殆启替湾戳曲绅哟镇刻祸姚椒眉餐追不虎卯僚挞蔡痉挎研茫钓暗承3.3水文地质条件土石混填路基试验段施工技术方案定稿 郧十高速YSTJ-5合同段土石混填路基试验路段施工技术方案enforced thermal insulation starts checking system