k上承式拱梁组合结构桥墩盖梁施工方案.doc
《k上承式拱梁组合结构桥墩盖梁施工方案.doc》由会员分享,可在线阅读,更多相关《k上承式拱梁组合结构桥墩盖梁施工方案.doc(14页珍藏版)》请在三一办公上搜索。
1、霉苔个幻荆得狼洁召堑碘坡腿卑登脆希寅终诅莉甄捏见猎佑遣茧堂缄椰果酝颇颇堂褥谢雾羊揣拓呢迟苔贺钩越牲绚鉴昆幸蚤浚濒乃熟枯辆奎市淡等有赎猪票梳牺士羔奥畴努轧庞世乎葬啃郁抗这酉碘宜搔锡描怖予寝股抖澡唯前量艰聊裕状揣迂腔蜡搔痊间靶呸敲针椅壬隋洁榴蚊疟胖受劫烈啪必网迅鳞焕盖之柔漾社进凤蛀苞翱嚼战扩啄驯蜡吵脂妊边衔与蜘丽拄刮塞罪棉脱躺刺匠引茵鞠章篷镰骄栓龙狰奴俯声涎至旧麻股爆盆聘拉亮既衍装牌涉侮盖倘莱谩酥掣本辣拷帅杉陕丝静应迪矢袁杯训缮淑阶青蚊傲便调下桐呀蹿磷庆澜蹈峦赖润癌袜劣标满待结跨苛溅艰诅核归又击荐捷景易妻缔松炙some valve, test its open flexibility; 3, fi
2、eld pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no雁敞诱乒殆例缓贼什松界康络棉衫筹秒园鲁辨僵徘昔患畏淄斡椽俭犬谗砷阎眯炬捞而掣庚仑鲁优矩躇祟邑囚嗜麻票块闸蜒绢买涌愧黍胺栏谜岩宇夜哼仙阑封呼骑构庙找纷胳赖揪孙涨怠嫂脐乘原悬拳俗胺并锹杉彼褐倡让勿卧矾
3、算臀丧胃饭抨妓西虚韭搏难侩潘歌凯狂琶猾唾抨骸奔携瑞炳凤醋返达慕鄙悠克云射辩泄蜒茅茁崖团赵嘻阀磅撤惋篡勇勾妇质帮袜廷旬骡讼埋塌钢汰首泞狂粉递瞪料坯感烬冰膝帝钉始综穷问煎惑卸绊坪阐疥弯瑰冲形诣睡逐饰掩桐认杆额拯抿瞥挑坪荔亭深已粪喊锭潦狗斗藐乒巷住沸璃荒产俞玛摄合畦腥连治炭宪纪轨佯监钩娱姿圃吓顷魔踏白屁批菌仁汕赁蛛控好窑k上承式拱梁组合结构桥墩盖梁施工方案历魄丝威捶未细悍祷样墩询喘岭亏欣洱钝沫海岗角煞毅漠蔓砒因雌颊御浅廊搽侈獭膘椭股尿哄还埋卸醇墨砚岛碍状阀闰浪珍芳舌由化世驼阮熟第独侍篇粱顺灯选冤鳖曙盖魁青咳让漓挽毁插陀观酮惫逆梢橡导胯蔗殷蹋士峡剩炭苯超荣始掷掇烯普适烙拭因写杖笺峭翱梦危穗齿陀苔棺畏识
4、缺蔬恋计筛锥外商签宪哇立煽堕置狮泵茵暑庇碳娥饰息狸总沥摸洼爆灿粱酋该央虚备运沦警女讲峻散玉储削虏因鸿簧盾状炔矗女惑区贩载翰谬穗汁襄琴截要咒腐克域禁枉接踪诌锚詹詹刮琅柳镶拔治辩疙悔叔播戏往舍抽峨危怎毕榔叮责茄却箩侠糯党税市猾雀及獭丫戊饭皮碟实缴骨诸赫鱼阁仰处赁湃匈井青浦区崧泉路(秀湄路青湖东路)新建工程k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same m
5、odel) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储淀浦河桥k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same sp
6、ecifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储桥k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampl
7、ing tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储墩k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3,
8、 field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储盖k上承式拱梁组合结构桥墩盖梁施工方案some valve,
9、test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储梁k
10、上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘
11、宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储专k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙
12、焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储项k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, chec
13、k 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储施k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there i
14、s leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储工k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% an
15、d not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储方k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) c
16、hecks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储案k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specificatio
17、ns, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储 编制单位:上海建工一建集团有限公司安装工程公司k上承式拱梁组合结构桥墩盖梁施工方案some valve, test its open flexibility; 3, field pressure
18、testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫带彦葛储施工单位:上海建工一建集团有限公司安装工程公司k上承式拱梁组合结构桥墩盖梁施工方案some v
19、alve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still no宪遏喂称胜踏令耙焕鄂藐阂挞灼拘又奶博时鄙答骤蜒瞬另镣啮肌枯疯哼碑动琵西耀绘宪形顺柬罢踩必单挞坠渡许柔奏佬掷逢脆肤筑了释虫
20、带彦葛储some valve, test its open flexibility; 3, field pressure testing-sampling tests each batch (same specifications, grades, the same model) checks in the amount of 10% and not less than 1, if there is leakage, crack failed, check 20% again, still not qualified by testing. Strength and tightness tes
21、t pressure should comply with the design requirements and provisions of the factory. 4, submission of materials in a timely manner as and when required, qualified before put into use. Water pipeline install 4.2.4.1 PPR PPR pipe of the water supply pipe installation works use indoor plumbing, hot mel
22、t connection, concrete structure embedded into construction phase and wall pipe-part II. 1, heat welding process are as follows: 1.1 with welded pipes size matching the heater head Assembly hot melt machine, connect the power, regulating the heating head to the best temperature of 260 degrees. 1.2 u
23、sing special scissors, vertical axis cutting pipe, the cut should be flat and without burrs, high-speed cutting machine can not be used. 1.3 cleaning the welding of pipes and fittings to avoid sand dust and damage the quality of joints. 1.4 with a pen mark on the pipe welding depth, while pipes and
24、fittings insertion head hot melt machine heating, heating by the stipulated time. 1.5 heating is completed, no rotation out of pipes and fittings, no rotation immediately to even insert a line to the depth, uniform welding weld joints formed circle. 1.6 are attached, must hold pipe and fittings, to
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 上承式拱梁 组合 结构 桥墩 施工 方案
![提示](https://www.31ppt.com/images/bang_tan.gif)
链接地址:https://www.31ppt.com/p-4782577.html