【建筑施工方案】熔盐储罐焊接施工方案(修改).docx
《【建筑施工方案】熔盐储罐焊接施工方案(修改).docx》由会员分享,可在线阅读,更多相关《【建筑施工方案】熔盐储罐焊接施工方案(修改).docx(74页珍藏版)》请在三一办公上搜索。
1、目录1.工程概况21.Project Summary22 编制依据22 Compilation Basis23 施工准备43 Construction Preparation44 焊前准备84 Weld Preparation85 施工工序115 Construction process116 熔盐罐底板组对焊接126 Assembly welding for tank bottom plate127 熔盐储罐壁板的焊接177 Welding of tank shell178 拱顶的焊接218 Welding of vault219焊缝的修补229 Repair weld2210焊接检验231
2、0 Welding inspection2311 质量保证措施2711Quality assurance measures2712 HSE保证措施3512 HSE Assurance Measures3513工机具及人力资源5313 Machines & Tools, and Human Resources531。工程概况1。Project Summary本工程为2台20000m拱顶冷、热熔盐储罐新建工程,工程所在地位于青海省德令哈市西出口太阳能发电基地内,工程内容包括储罐罐主体制作、安装、防腐、及相关检测.This work is for two sets of 20000m vault h
3、ot melt salt storage tank new project, the project is located in solar energy base of west exit of Delingha City, Qinghai province, and the project contents include fabrication, installation, anti-corrosion, and relevant inspection of the main body of the storage tank.储罐结构形式为拱顶固定顶,共由五带壁板组成,壁板材质为Sa51
4、6 Gr.70 N,壁板厚度从下到上依次为42mm、34mm、25mm、16mm、10mm。 The storage tank structure is fixed arch roof which is constituted with five shell plates。 The material of shell plate is Sa516 Gr.70 N, the thickness of shell plate from up to down in sequence is 42mm, 34mm, 25mm, 16mm and 10mm respectively.2 编制依据2 Com
5、pilation Basis2。1 中广核德令哈50MW光热项目热传储热系统施工图2.1 Construction Plan of CGN-Delingha 50MW Solar Thermal Power Generation Project Heat Transmission and Heat Accumulation System2。2 合同、招标文件;2.2 Contract, bidding document;2。3 Q/JH121。11。00492安全技术操作规程2。3 Q/JH121。11.00492 Safety Technical Operation Process2.4 G
6、B501282014立式圆筒形钢制焊接储罐施工及验收规范2。4 GB50128-2014 Vertical Cylindrical Steel Storage Tank Welding Construction and Acceptance Specification2.5 SH/T35302011石油化工立式圆筒形钢制储罐施工工艺标准2。5 SH/T35302011 Technical Standard for Construction Vertical Cylindrical Steel Storage Tanks for Petrochemical Industry2。6 GB50341
7、-2003立式圆筒形钢制焊接油罐设计规范2.6 GB50341-2003 Code for Design of Vertical Cylindrical Welded Steel Oil Tanks2。7 GB/T709-2006热轧钢板和钢带的尺寸、外形、重量及其允许偏差2.7 GB/T7092006 Dimension, Shape, Weight and Tolerances for Hotrolled Steel Plates and Sheets2.8 NB/T47014-2011承压设备焊接工艺评定2。8 NB/T470142011 Welding procedure qualif
8、ication for pressure equipment2。9 NB/T470152011 压力容器焊接规程2.9 NB/T47015-2011 Welding specification for Pressure Vessels2.10 GB/T9851998气焊、手工电弧焊及气体保护焊焊缝坡口基本形式与尺寸2.10 GB/T985-1998 Basic forms and sizes of weld grooves for gas welding manual arc welding and gasShielded arc weldind2.11 GB/T986-1998埋弧焊焊缝坡口
9、的基本形式与尺寸2。11 GB/T9861998 Basic forms and sizes of weld grooves for submerged arc welding2。12 JB/T47302005承压设备无损检测2。12 JB/T4730-2005 Nondestructive Testing of Pressure Equipments3 施工准备3 Construction Preparation3.1 焊工考试3.1 Welder Examination3。1。1 所有参加熔盐罐制作安装工程的焊工必须经过严格的审核和正规的岗前培训,持证上岗,对从事埋弧焊、气体保护焊和手工焊
10、的焊工,应按GB50236-2011现场设备、工艺管道焊接工程施工规范焊工考核的有关规定进行考试。3。1.1 All welders who will take participation in the manufacture and installation of the hot melting salt tank must receive strict reviewing and regulated pre-job training and obtain certificates before being appointed the post。 The welders who take p
11、articipation in the submerged welding, gas shielded welding and manual welding should take examination as per relevant regulations for assessment of welders in Field Equipment, GB502362011 Process Pipeline Welding Construction Specification.3。1.2 对于首次施焊SA516 Gr.70 N钢板的焊工,必须考试合格,才允许进行相应的焊接工作。3.1。2 Th
12、e welder who first welds SA516 Gr.70 N steel plate must take the examination and then be appointed to conduct the welding work after examination qualification.3.1.3 根据现场情况,在正式开工前,完成焊工考试情况。按焊工实际焊接类型分别进行考试.考试合格后,方可进行焊接操作。3。1.3 According to field situation, the welder examination should be completed be
13、fore formal starting of the construction。 The examination should be prepared in line with the actual welding type respectively which will be performed by the welder。 The examination qualified welder will be awarded with welder qualification certificate and will be appointed the post in line with cer
14、tificate. No welding job for welder who failed to be awarded with welder qualification certificate。3.1.4 焊接工作进行前,焊接技术员要对所有焊工进行焊接技术交底,让焊工熟知焊接工艺方案,熟练掌握所焊部位的材质种类和所采用的工艺方法,如坡口形式、焊材选用、焊接电压电流调节、焊接速度控制等,让焊工了解焊接应力与焊接缺陷的危害与预防措施.3.1.4 Before welding, the welding technician should deliver technical details dis
15、closure to all welders to make each welder be familiar with the welding technology plan, to perfectly master the materials classification and applicable technology for the welding parts, such as groove shape, welding materials selection, regulation of welding voltage and current, and welding speed c
16、ontrol, in order to make the welders understand the hazards and prevention measures of welding stress and welding defects.3。2焊接设备3.2 Welding device 直流电焊机、CO2气体保护焊焊机、埋弧自动平(角)焊机等。焊接设备的电流表、电压表、等仪表、仪器以及规范参数调节装置应定期进行检验。上述表、计装置失灵时,不得进行焊接。手工电弧焊、氩弧焊焊机必须集中放置在离焊接区较近的焊机棚内;自动焊根据现场需要进行放置,放置焊接设备的场地必须保持通风良好、干燥、维修方
17、便.Welding equipment: DC welder, CO2gas shielded welding machine, automatic submerged arc flat fillet welder, etc. Ammeter, voltmeter, and other specification parameter adjusting devices shall be inspected periodically. When the aforesaid meter and metering device fail to function, welding shall not
18、be performed. SMAW and GTAW welder must be collectively placed in the weld machine shed, near by the weld zone, the automatic weld machine to be placed according to the site needs. The weld machines shed must be kept well ventilated, dry and easy maintaining。3.3焊接材料Welding materials:焊接材料应具有产品质量证明文件,
19、符合现行国家标准的规定,且实物与证明书上的批号相符,外观检查时,焊条的药皮不得有受潮、脱落或明显的裂纹;焊丝在使用前应清除其表面的油污、锈蚀等;埋弧自动焊丝、焊剂必须放在干燥处妥善保管;低氢型焊材需按照批次、规格不同,分别取样送有资质试验室进行熔敷金属的扩散氢含量检测,扩散氢含量以不超过4mg/100g为合格.Welding materials shall have certificate of qualification and shall meet the stipulations of the current national standard, and lot number on th
20、e material package shall conform to the certificate; Electrode shall be free of moisture, falling or apparent crack during visual inspection; Welding wire shall be free of oil stain, rust stain and so on prior to usage; Submerged automatic arc welding wire and flux shall keep in a dry place properly
21、;焊接材料入库前检查其装箱单,出厂质量证明书等文件,检查焊材包装等情况及核对标识后方可入库。焊材入库后应根据焊材种类、型号、批号分类存放,存放焊材的库房应干燥、退风,库内温度应大于50,相对湿度不大于60;焊材应放在焊材架上,离开地面和墙壁的距离不小于300mm,应安放湿度计并做好记录.Before receiving welding materials, it is required to check its packing list, leave-factory quality certificate and other documents, welding material packag
22、es, and identifications。 When the welding material is received, it shall be stored as per its category, type, and batch number respectively, and the welding material storage room shall be dry, ventilated, room temperature shall be larger than 50C, relative humidity shall not be larger than 60; weldi
23、ng materials shall be put on the welding material support, its distance to the ground and wall shall not be less than 300mm, and humidity meter shall be installed and its reading shall be well recorded。焊接材料设专人保管,掌握焊材库的温度、湿度状况及焊材库存量、出库量,并必须设去湿剂。Welding materials shall be kept be designated person, te
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 建筑施工方案 建筑 施工 方案 熔盐储罐 焊接 修改

链接地址:https://www.31ppt.com/p-4752014.html