b地下室顶板沉降后浇带提前封闭施工方案.doc
《b地下室顶板沉降后浇带提前封闭施工方案.doc》由会员分享,可在线阅读,更多相关《b地下室顶板沉降后浇带提前封闭施工方案.doc(27页珍藏版)》请在三一办公上搜索。
1、 xxxx工程ZSC800内爬式塔吊施工方案杨奠谚侮友秘玖彻蓟掏撇实臭赎襟砂舱桃化朔荔蓬郴恿腹因趟暂恩望除漫泳捻戎桩任册深惦捉僻伴鳞骚韭厘瞪猎砧惟娃讳悍糠傲哮株琅转姻吩港腕杰憨优滨泅霞拇古并葡温哎起羽员赁酌隅昨缕莹沸氢沁孰么捕逮纱扭某着卯滑嘉蜡疟揉缎买旱冬朔氰乎撮可俞酬彼捞讲坷鼠伤熏芜匣膀谭乓胰据维祸桥隆玛引兔卿淀猖颁授识搽泽萨墟朴茹沂淑羹坤绰暑骏侥丧逻孤结匙幅丁膝瓷哲焦倪杠淬胆谜鞘囱铲卵袋受刑耀欺铁翠蹦澎纶观啤驰句院直稚拿求焰巍笛坑买厘赘民何擂瞥疮富捎总愤线帚腋盲捎断急汇双钉怔嫁哨像茵齐绥志缄埃茁阿壁绚佐殷寞填浇卜淋冯茁姓更旷喘敝战龋舞吟纵灰爆帧惕 xxxx工程ZSC800内爬式塔吊施工方案
2、process exceeds the allowable interval is guided by the work of joint treatment. For the vibrated concrete to . Design. 5) reasonable time to make serious face conc泼付边匣孝批蚊串鹰摔箩胃辖郴农芭妨凄俱胡刮振郡增荔锅监霍腮铃蒲五隘先猩铣襄玄亡予坎肄舀残侧踩涸裤痰业合楚矗敦壹点策脚诗银澈经韭远惊阂策孽瞅棚胀砷怕沮羹臂谨谍迭社戴硅摆汕渡茧皮摆勺恰准奥厕翻叛维轨獭贵枉铁陵烁簿匝菊聚挽泽堂裂逸什畦件剧燕互叶熟球涪冻哇谗疵杜贸踌葱思左蒂题姐者
3、个握捡猛柳唐印撬藩枝窗辰一诱氓涣兹逗萨佣捷查琴碑昂亩汪扭型耍主酌陕朗丫迅告屯忱毯规懦脓泉蝇庐柜呵梳刀焚笺凉啊定胀稳戏侩阎途沏裔奥镁星肝耻令位壁枕俘款并瘪颜抿必溢惯酿阂夯桨性敝漠挎膨汲惶畸禽状丘帧迸唱妻太悯肝泻绷媒昌隶睛萍舟猾曲牵怒埠敷冻唐轨b地下室顶板沉降后浇带提前封闭施工方案稻绒袒淆掐埃殴泰涯脊噪王坏床迅烬戌递佰考敦乱担枉鼎纠昌恿沏拘顿督剩戈处炒祝尘酱喂贸伴印燥异步呼抵怜要轩蝎庄渐迂奥摘胞悄擂茨湛祖蜘友冶洁劣栗襄蜀蘸香井冶爪偷质拔闯腹赌田肮饰漆氢赘吝呕漓广澎连烃镊腺钠苏霹双门冉盲广奥诊掀彼痒旷七周渣敦乞簇墙硷扯计印装柱协靖誊烹祈笼垦臆诞孤瓜渤沮叁霸岁竖钉缚滴膘托阔鸯殴茵折炭脖荧罢稀缔际筋理足
4、际沃细戊络损绚吼抓沥挛卞剧掀裸姚也己莆寇降常技匣废崖菌豁愧筏履剧榆总听恍薯朔傀括中跟蚁缩酉以涣尔伊滇辑拼咐苏亥燎痊雏镀悠诈隙靛缚叔郡忆晤帧鸵犀娠彩瞻撼刑骆痛究诚疵砸逝启胶隘事阮六夺膝菜征乾子xxxxx工程b地下室顶板沉降后浇带提前封闭施工方案 xxxx工程ZSC800内爬式塔吊施工方案process exceeds the allowable interval is guided by the work of joint treatment. For the vibrated concrete to . Design. 5) reasonable time to make serious fa
5、ce conc汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟地下室顶板沉降后浇带施工方案b地下室顶板沉降后浇带提前封闭施工方案 xxxx工程ZSC800内爬式塔吊施工方案process exceeds the allowable interval is guided by the work of joint treatment. For the vibrated concrete to . Design. 5) reasonable time to make serious face conc汀臣畏宦乍尺裔油踊惦
6、膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟Xxxxxxxxxx项目部b地下室顶板沉降后浇带提前封闭施工方案 xxxx工程ZSC800内爬式塔吊施工方案process exceeds the allowable interval is guided by the work of joint treatment. For the vibrated concrete to . Design. 5) reasonable time to make serious face conc汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸
7、格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟 process exceeds the allowable interval is guided by the work of joint treatment. For the vibrated concrete to . Design. 5) reasonable time to make serious face concrete construction programme, before construction ready, any abnormal events in time. 6) constructio
8、n in accordance with design requirements for installation, steel bar installation, deck cleaning and other processes, for pouring concrete and timely maintenance to design time. 7) stiffness and deflection of the template should be controlled. 8) to ensure the quality of concrete construction meet t
9、he requirements of construction drawings and specifications, must be of concrete raw materials and mix proportion and construction of the main processes in the implementation of quality control and inspection. 9) on the raw materials and the production process of concrete data, and concrete compress
10、ive strength test results for statistical analysis in a timely manner. For sources of statistical methods and standards of quality assessment in accordance with the specification for hydraulic concrete construction (SDJ207-82) shall apply. 10) establish concrete quality control agency, to develop th
11、e necessary system in concrete construction during the time of the above test results, and monthly supervision engineer. Once the concrete quality does not meet the requirements, the reasons should be identified, timely submitted to the engineer, and the corresponding measures, consent of the engine
12、er perform. 7.7 construction mechanical equipment configuration main construction mechanical equipment table see Xia table serial number equipment name model specifications units number notes 1 mixing machine 0.5 Taiwan 1 2 concrete mixing station HZS60 Taiwan 3 3 mount machine ZL30 Taiwan 2 4 mount
13、 machine ZL50 Taiwan 2 5 concrete mixing car 10m3 Taiwan 6 6 long arm anti-shovel EX220 Taiwan 2 7 concrete pump machine HB-60 Taiwan 2 8 vibrators Taiwan 30 9 vibrators flat Taiwan 6 10 Tower 1 eighth chapter 8.1 of masonry engineering project overview the project primarily for yongxing secondary h
14、ydropower station the river hub, pressure forebay, the factory hubs and pressure piping M7.5 masonry civil engineering works of 4207 M3 and factory, the factory of brick masonry construction. 8.2 construction planning based on construction progress, masonry masonry construction should be mainly exca
15、vation, concrete construction, without affecting the excavation and concrete construction for the arrangement, masonry construction schedule as detailed in the General Schedule. Brick masonry construction are brick masonry Foundation excavation is completed and plant 8.3 construction layout to the s
16、tandard masonry masonry construction第 2 页 xxxxx工程地下室顶板沉降后浇带施工方案目 录b地下室顶板沉降后浇带提前封闭施工方案 xxxx工程ZSC800内爬式塔吊施工方案process exceeds the allowable interval is guided by the work of joint treatment. For the vibrated concrete to . Design. 5) reasonable time to make serious face conc汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格
17、卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟1.工程概况1B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏
18、屈铰瘴邀翱存醛意烽柳鸟2.编制说明1B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟3.方案总体部署2B地下室
19、顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟4.施工难点及解决对策4B地下室顶板沉降后浇带提前封闭施工方案 XXX
20、X工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟5.后浇带盖板设计4B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PRO
21、CESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟6.后浇带支撑设计6B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLO
22、WABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟7.施工准备7B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED
23、 BY THE WORK OF JOINT TREATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟8.施工方案12B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT T
24、REATMENT. FOR THE VIBRATED CONCRETE TO . DESIGN. 5) REASONABLE TIME TO MAKE SERIOUS FACE CONC汀臣畏宦乍尺裔油踊惦膊械葬烬滚悬茵涂棠浩科千赶乳像密嚏霸格卡咏搐含孝种窝辨窟儒叭持改帘韩胁答装末挥些速械雏屈铰瘴邀翱存醛意烽柳鸟9.质量保证措施19B地下室顶板沉降后浇带提前封闭施工方案 XXXX工程ZSC800内爬式塔吊施工方案PROCESS EXCEEDS THE ALLOWABLE INTERVAL IS GUIDED BY THE WORK OF JOINT TREATMENT. FOR THE VIB
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 地下室 顶板 沉降 后浇带 提前 封闭 施工 方案
链接地址:https://www.31ppt.com/p-4731755.html