银河大厦外立面幕墙装饰工程施工条组织设计.doc
《银河大厦外立面幕墙装饰工程施工条组织设计.doc》由会员分享,可在线阅读,更多相关《银河大厦外立面幕墙装饰工程施工条组织设计.doc(131页珍藏版)》请在三一办公上搜索。
1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons
2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi
3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical
4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta
5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o
6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project
7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc
8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d
9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy
10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef
11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont
12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according
13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .银河大厦外立面幕墙装饰工程 施工组织设计目录第一章工程概况3一、工程概况3二、建设地点及环境
14、特征4三、施工条件51、施工现场条件52、我司具备的施工条件5四、本工程特点难点及其措施6第二章施工部署7一、项目的质量、进度、成本及安全目标7二、项目管理体系与组织说明8三、施工进度计划、分包计划、劳动力使用计划、材料供应计划、资金使用计划、施工用水电计划、机械设备进退场及使用调配计划和相关试验计划141、施工进度计划142、分包计划143、劳动力使用计划154、材料供应计划175、资金使用计划186、施工用水电计划187、机械设备进退场及使用调配计划208、相关试验计划21四、施工程序25第三章质量保证措施26一、施工准备过程的质量控制措施27二、幕墙构件加工质量检测及控制程序27三、施工
15、过程中的质量保证措施29四、幕墙施工质量检测及控制程序31第四章施工进度计划保证措施38第五章建筑幕墙制作与安装的施工技术方案41一、幕墙构件的加工制作41二、预埋件安装52三、总体测量放线56四、脚手架和吊篮57五、玻璃幕墙安装工艺61六、铝板幕墙安装工艺74七、裙楼无框全玻璃幕墙安装工艺82八、裙楼石材幕墙安装工艺85九、裙楼点式玻璃幕墙安装工艺103十、幕墙清洗及验收106第六章保证安全生产、文明施工、成品保护、降低环境污染和噪音,以及施工期间防风、防雨及防雷等的措施114一、保证安全生产措施114二、文明施工措施118三、成品保护措施120四、降低环境污染和噪音的措施125五、防风、防
16、雨及防雷措施125第七章施工平面布置127一、临时设施布置127二、临时用地表128第八章与其他承包商的协调配合措施。129一、需要甲方、总包等单位的配合协调129二、我方提供的配合协调措施130表3.6计划开、竣工日期和施工进度表40表3.7临时设施布置及临时用地表129Four outstanding works. They are derived from their own inner feelings. I also sent a student to attend the class Department speech contest, failed to get a good r
17、esult, but also actively cooperate with the Department and class activities! in order to create a demonstration dorm room, our weekly class to every bedroom check, where proposed is insufficient. In order to clean up the bedroom, we use the brush brushes a bedroom again. For the class out of a force
18、. In the event we, many projects did not get the desired results. But we understand that we tried, and in the struggle. Also has made good progress in many of the! in my class the work carried out and the results achieved, thanks to the concern and support of the Department, thanks to instructor tea
19、chers good, proper guidance, thanks to 46 students in the class will work closely together, to work together. Of course, we also have our weaknesses, needs to be further correction in their future learning and life, with a view to achieving greater results. Five declarations of good party branch bra
20、nch is a fortress, a party member is a banner. Fighting in the railway engineering construction Group Headquarters Headquarters branches, a total of members 18. Role of the Xiang-GUI railway and tight South Lebanon railway, heavy, poor conditions of disadvantage, the branch closely around the constr
21、uction work. Holding high the flag of our party members, unite and lead staff on the difficulties, overcome difficulties, take the zhengyou, a job well done and an engineering task, won the highly valued by leaders at all levels. Since October last year since the project began, Headquarters Branch i
22、s tightly around the center of its activities. Face South, climate is wet, sooner or later temperature larger, specific difficult, I branch from thought requirements all workers active motivated, do can long-term hard, dare fight of spirit prepared, while requirements all members lead, encouraged co
23、lleagues Zhijian each other help, each other learning business knowledge, overcome temporarily difficult, active into to engineering official starts of the prepared work in the to, play out has as a branch of fighting fortress role and members of pioneer model role. Since its start, I command under
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 银河 大厦 外立面 幕墙 装饰 工程施工 组织设计
链接地址:https://www.31ppt.com/p-4668013.html