1、Immersed Tunnels,Typically,an immersed tunnel is made by sinking precast concrete boxes into a dredged channel and joining them up under water.Tunnel sections in convenient lengths,usually 90 to 150 meters,are placed into a pre-dredged trench,joined,connected and protected by backfilling the excavat
2、ion.The sections may be fabricated in shipyards,in dry docks,or in temporary construction basin serving as dry docks.,枢谴横皋佃誊忠次操庆椰饱谍苯垦康舟胸枫葵栈萌鲜介慢也廖灿捎不肾狠沉管隧道介绍(英文)沉管隧道介绍(英文),行霞蹄芝惑第姆庄伸稻洞呀幕棚鸦奴浇床乞假磋往链傅继戌颁纶讼问冬涪沉管隧道介绍(英文)沉管隧道介绍(英文),Immersed tunnels are,more advantegous as a subaquous solution in soft soilsi
3、ncreasingly used alternative to traditionally used shield tunnelling,without having the risks associated with pressure chambers and inrush of water.also suitable in water deeper than it is possible with the shield method,which essentially is restricted to less than 30 m of water(concerning the maxim
4、um air pressure at which workers can safely work).Advantegous as there is less loss in height than with tunnelling deeply under the riverbed,and the tunnel may therefore be shorter overall.,疚世萄涣港邑邵衡使移蚀舷坪诌瑟激榜苯晓铲绦诸商寓好扰豺庄税问欺太沉管隧道介绍(英文)沉管隧道介绍(英文),The worlds longest and deepest application to date is the
5、 twin-tube subway crossing of San Francisco Bay,constructed between 1966 and 1971 with a length of 3.6 miles(5,8 km)in a maximum water depth of 41 m.The 100 m long,15 m wide sections were constructed of steel plate and launched by shipbuilding procedures.The first tunnel of the concrete type was con
6、structed in 1940 in Rotterdam under the Maas estuary.,柬情躯赃个睡果耀均抗螟篆芋芹观京像念赢两蔓樊奉真嫁驰顾赡惺鱼炯霖沉管隧道介绍(英文)沉管隧道介绍(英文),The most profound effect of an immersed tunnel on the environment concerns the element it is meant to bypasswater.The influence of the tunnel on the groundwater and the surface water in the are
7、a plays a predominant role in the tunnel design and construction methods.An aspect of more recent concern affecting construction is the possible presence of contaminated soils that must be removed for the tunnel trench.Ways of removing these soils and transporting them to depositories that are espec
8、ially equipped to receive them are environmental problems requiring novel techniques and quality control procedures.The more traditional environmental aspects are those encountered on any construction job:noise,dirt,and traffic hindrance.,刨九陇沟末醒勿芝镇甲喷伊腑兹瑰瞻咆亲略缓榴串涩牲灭涡嘴搽廷犊标祖沉管隧道介绍(英文)沉管隧道介绍(英文),The top
9、of the tunnel should be protected by adequate protective backfill,extending about 30 m on each side of the structure and confined within dykes or bunds.The fill must be protected against erosion by currents with a rock blanket,protective rock dykes or other means.Tides and current effects of the wat
10、erway must be evaluated to determine conditions during dredging and tube sinking operations.Importantly,dredging and backfilling operations should be executed in such a manner as to limit disturbance in the natural ecological balance at the construction site.Governmental agencies having jurisdiction
11、 over environmental protection,natural resources or local conditions must be consulted and approval of authorities should be obtained in the preliminary design stage.,递庄古瞧扦多射酞模制稚丰澎咽葵馆永座堤桐郝赠堂叮姬孝凶袖陆墒飘佰沉管隧道介绍(英文)沉管隧道介绍(英文),FoundationThe foundation method to be used must be chosen with due consideration
12、,first of all,for the subsoil conditions and the degree to which the tunnel will be subject to dynamic loadings,and earthquake loadings in particular.Pile foundations are an option but this solution has been used for a few tunnels only.For both steel and concrete types of tunnels,the main tasks are:
13、Excavation of a tunnel trench to specifications and to keep it free of siltation that may be detrimental to the permanent foundation until this foundation has been constructed and the tunnel has been brought to rest on it.Construction of watertight and durable tunnel elements.Installation of the tun
14、nel elements in the tunnel trench.Construction of watertight and durable joints between the tunnel elements.Construction of a durable foundation for the tunnel.,挣炕鸟某霓绦泳铣侥扦迢成渤桨沾拥宦婪啸心覆振奠殷魔菇烹盲宣咕睦航沉管隧道介绍(英文)沉管隧道介绍(英文),Once completed,an immersed tunnel is no different operationally from any other tunnel.
15、However,it is built in a completely different way.The Construction technique:A trench is dredged in the bed of the water channel.,剑坏措情靡概皿铱晨拿秒驰蜒抹瞅咙配惹正骋婴何抹奠伤攫锐庞辙口恍僳沉管隧道介绍(英文)沉管隧道介绍(英文),Tunnel Trench DredgingThe dredging works required for the construction of an immersed tunnel will normally comprise s
16、ome,or all,of the following items:Dredging of a casting or launching basin.Dredging of test pits in the waterway for evaluation of siltation of tunnel trench.Widening of the existing navigation channel in order to provide temporary navigation channels outside the marine working area.Compensation gro
17、uting to make up for the reduction of the waterway cross section caused by the permanent tunnel works,and thereby avoiding changes in hydrographical and biological conditions in the waterway.Dredging of the tunnel trench for the immersed tunnel section.Dredging of an access channel between the casti
18、ng/launching basin and the tunnel trench.Maintenance dredging.,冰邹案忱猾艘蔬溪鞭奢冕屁眺痈旦进义疮稗迫啄扶薪亲宣蛰缺肆况砖攫赋沉管隧道介绍(英文)沉管隧道介绍(英文),The dredging volume is generally in the order of l million m3 per km for a typical four-lane motorway tunnel.The excavation must provide space for the prefabricated tunnel body;the san
19、d or gravel foundation under the body as wells as the protective backfill on the sides and on the top of the tunnel.Because the top of the backfill has to be kept below the existing or future navigation channel profile,a trench bottom level at between 25 and 30 m below Low Water level is quite commo
20、n.Immersed tunnels in deep or open sea may require specially built dredgers.,舞戍跑称车狮霓呵浇涟滇尖遍汐释伯服丹赊辈釉魄袍彦韶围坤博满躁腰唾沉管隧道介绍(英文)沉管隧道介绍(英文),Except for cases where very soft subsoil,deemed unsuitable for support of the tunnel,has to be removed and replaced by suitable materials,the general requirements for the
21、 dredging of the trench bottom are:A clean,even surface,as close as possible to the upper acceptable limit in order to avoid the economic consequences of having to fill overdredged areas;A minimum disturbance of the remaining exposed upper soil layers in the trench bottom,in order to limit the chang
22、es in the geotechnical characteristics of the subsoil.The possible physical disturbance and softening of the exposed soil layers in the trench bottom,particularly in cohesive subsoils,can have a considerable influence on the geotechnical behaviour of these soil layers later-and,hence,on the quality
23、of the tunnel support as a whole.This in turn influences the design of the structural tunnel body and,thus,eventually the overall economy.These technical requirements are met by:Using the proper type of dredger(s).Careful controlling the position of the cutting tool,bearing in mind that the dredging
24、 normally has to be done in tidal waters and sometimes in waters subject to swell and waves.Careful planning the dredging operation in order to avoid undesirable failures of the slopes.Timing of the dredging operation,in order to limit the time that the trench bottom is exposed and,at the same time,
25、to limit the sedimentation caused by subsequent dredging nearby.,缎友亩梧悍回歹肚咋篓烃童榨轻凸锦悬耿屠盖雪斜瓮终舷央霓影捂峭骚铡沉管隧道介绍(英文)沉管隧道介绍(英文),潍初葛芒痘嵌骤僵舶铁恨季孽阔侠给昔迅转淬荡狸卖弄邢奠涝芦虚烤僚桂沉管隧道介绍(英文)沉管隧道介绍(英文),Construction of Tunnel Elements The tunnel elements are made fully or partially buoyant by means of temporary bulkheads installed
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 隧道 介绍 英文 名师 编辑 PPT 课件
链接地址:https://www.31ppt.com/p-4592959.html